Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Chotah

The Erskine Childers-led Howth and Wicklow gun-runnings of July 1914 took place so quickly and efficiently that those involved ashore only had fleeting glimpses of the boats involved. Although Erskine & Molly Childers’ historic ketch Asgard is now conserved and comfortably at home in the museum at Collins Barracks in Dublin, much less is known or remembered of the other four vessels which took part. W M Nixon takes a look at a line of research which has taken a leap of the imagination to visualise one of these mysterious craft.

You only have to visit the conserved Asgard in Collins Barracks in Dublin to get a true sense of the past, and the special nature of this fine yacht. You grow into an understanding of how it was that people of the utmost respectability, people who sailed one of the best cruising yachts of her era, willingly led themselves and their friends and other yachts into a successful gun-running venture just before the Great War broke out.

That Great War gave everyone the message, loud and clear, that guns are for killing people, they’re not for fun. Yet grim and all as the ultimate message may be, Asgard herself is reassuringly peaceful. And if you have the good fortune to be in a group beside the Asgard listening to a talk by ship conserver John Kearon of how the project of saving the Asgard was achieved, you find yourself in a different world of respect for ancient objects, and a sense of promise for the future.

chotah pic2The 1905-built Asgard in Collins Barracks, with maritime conservator John Kearon giving a talk in the technicalities of preserving a wooden boat of this age. Photo: W M Nixon

But in other times and other places, curiosity about the other boats involved inevitably surface. We know from photos of the time what the tug Gladiator looked like - she brought the guns to the Ruytigen Lightship off the Belgian coast to be collected by Asgard and Conor O’Brien’s Kelpie from Foynes. Asgard we know, and as for Kelpie, we have some photos to reveal she was a boat of her time, a hefty 29-ton 1871-built cutter which O’Brien fitted with a ketch rig for easier handling.

As to what happened to her subsequently, we know he used her during his brief period as a fisheries inspector off the west coast when he was employed by the underground government of the nascent Irish state, a government which functioned in a secret parallel universe in opposition to the supposed seat of power in Dublin Castle.

But by 1922, O’Brien was a free agent again, and he took Kelpie away for a mountaineering expedition to Skye off Scotland’s west coast. Returning single-handed through the North Channel in light airs and poor visibility, he slept through an alarm clock’s ringing tones, and Kelpie came gently ashore on the steep Scottish coast south of Portpatrick.

Kelpie yacht FoynesKelpie as pictured by Jack Finucane of Foynes Island, who sailed as crew with Conor O’Brien

Conor O’Brien sister Margret aboard Kelpie Conor O’Brien and his sister Margret aboard Kelpie off Ireland’s West Coast in 1913.
She was stuck fast, her skipper was single-handed, and there was enough of a scend running for the old boat to start showing signs of breaking up almost immediately. So O’Brien launched his dinghy, put everything he could into it – including the alarm clock which he blamed entirely for the incident – and headed away to come rowing out of the fog into Portpatrick’s little harbour, surrounded by almost all his worldly goods.

The Kelpie, having played her role, was soon consigned to history, for by the Autumn O’Brien’s new world-girdling Saoirse was already under construction in Baltimore. But in re-visiting the gun-running, we find that although Asgard landed her guns directly onto the pier in Howth, the 600 guns which Kelpie had brought towards Ireland were transferred in the shelter behind St Tudwal’s Island off the coast of North Wales on to Sir Thomas Myles’ Chotah.

Chotah had been volunteered by her remarkable owner to drop the remainder of the arms consignment – with himself in charge - on the beach at Kilcoole in County Wicklow, as his hefty vessel was fitted with an auxiliary engine, which it was felt would be more than helpful in beach manoeuvres.

As a further precaution, the Wicklow landing also used the services of the Nugget, a motorized fishing boat owned by the McLaughlin family of Howth. But Nugget – like the Kelpie – was recorded in image and memory. However, after the Kilcoole adventure, Chotah seems to have disappeared from sight, and no photos of her have yet been found.

Which is odd, because Sir Thomas Myles (1857-1937) was no stranger to the camera and a certain level of fame. He was a man of many talents in addition to being one of the foremost medical specialists of his generation, with a particular skill in hospital administration. He was politically active on behalf of Home Rule in his native Limerick, and in Dublin where he was subsequently based, he was a sportsman of many interests including boxing – he went three rounds with Jack Dempsey – while sailing was another interest, developing into an abiding love of cruising which he continued to the end of his long life.

Sir Thomas Myles Sir Thomas Myles with relatives and friends in Dublin Bay aboard Faith, one of the several large yachts he owned during a sailing career which he continued until well into his late 70s
For the past two years, Ireland’s sailing community has recalled this remarkable man with the annual ISA/Afloat Sailing Awards being staged in the Royal College of Surgeons on Stephens Green in Dublin, using assembly rooms which Myles was instrumental in creating. As well, he is honoured in the Sir Thomas Myles board-room in the college. But although he was a member of both the Royal Irish and Royal St George Yacht Clubs, so far as I know there are no photos of any of his several yachts – some of them very large craft – on display in either clubhouse.

It’s an intriguing absence, and there’s certainly a general interest in knowing more. One person who has taken this a step further is marine artist Brian Byrnes, who has been fascinated by the Thomas Myles story since childhood. On family holidays in Kilkee, he can remember being mesmerised by the rocky inlet of Myles Creek, and was told that like many Limerick families, the Myles family holidayed in Kilkee, and young Thomas was wont to swim in this special creek, and then swim clear across Kilkee Bay while he was at it.

Sir Thomas Myles surgeon, sailor, boxer, swimmer, sportsman gun-runnerNot a man to be trifled with….Sir Thomas Myles: surgeon, sailor, boxer, swimmer, sportsman and gun-runner.

Thus this almost mythical Thomas Myles became godlike to the young Byrnes, and anything he was reported as having said was holy writ. So when the artist decided to give himself a break from the day job of painting precise illustrations of maritime scenes and specific sailing boats (in his Dublin studio he is currently producing portraits of two Olin Stephen-designed International 6 Metres), he set out to create a painting of Chotah as Thomas Myles described her.

Brixham trawlers with cutter rigBrixham trawlers with cutter rig. Chotah is believed to have been similar to these craft.

Brixham trawlers  ketch riggedIn their final years as sailing vessels, the largest Brixham trawlers tended to be ketch rigged.
Chotah was a yacht based on the classic cutter-rigged Brixham trawler type, 60ft long and 48 tons Thames measurement, built by S Dewdney & Sons of Brixham in 1891. She was by no means the largest or most luxurious of the yachts that Myles owned, but she suited him at a time when his medical career was at its busiest, and in due course he had her fitted with an auxiliary engine to enable him “to steam along”, as he put it himself, when time was pressing and the wind was absent.

Myles’s use of the vintage term “steam along” dated back to the days of seafaring when sailing ships were being displaced by new ships whose doughty chief engineers would describe them as “driven by steam as nature intended”. And when Brian Byrnes decided to paint a portrait of Chotah as based on the standard Brixham trawler of that size, type and era, he also did some research into how they might have been fitted with an auxiliary steam engine – in other words, how on earth did they manage to set a mainsail and have a smokestack at the same time?

Some of the bigger trawlers converted to ketch rig, which would have accommodated the smokestack immediately forward of the mizzen. But then Brian discovered that other vessels which remained cutter-rigged had come up with the idea of doing away with the mainboom, keeping the gaff permanently aloft, and brailing the loose-footed mainsail up to it in the manner of a Thames sailing barge.

chotah gun running yachtBrian Byrnes suggests that Chotah may have accommodated a smokestack for her steam auxiliary engine by having a loose-footed mainsail which brailed up to the gaff boom.
This certainly solved the problem of the mainsail clearing the smokestack, and it was in line with Thomas Myles’ accounts of Chotah “steaming along”. So in visualizing what Chotah might have looked like, the artist allowed himself complete artistic licence, and created this fine study of Chotah coming through Dalkey Sound with the Muglins beyond, and the loose-footed main pulling good-oh while steam and smoke come from the stack to indicate that the auxiliary engine is ready for action as they enter Dun Laoghaire harbour.

It’s an absolutely lovely idea, and all power to Brian Byrnes for visualising it. But unfortunately reality seems to have been otherwise. During all the excitement of the Asgard Gun-running Centenary in 2014, Pat Murphy (who played a key role both in making sure that Asgard has the semblance of a rig in her museum berth, and also led the movement to build a re-creation of her little dinghy) somehow found the time to do a bit of research on all the vessels involved with Erskine & Molly Childers and their friends in 1914. And in Lloyds Yacht Register of 1915, Pat found evidence that although he might have liked to think of himself as steaming along, Sir Thomas Myles actually installed a humble Bergius paraffin auxiliary engine in Chotah in 1913, and it was that little “stinkpot” which made Chotah indispensable for the Kilcoole gun-running.

Lloyds Yacht Register for 1915 shows Chotah Lloyds Yacht Register for 1915 shows Chotah still in Sir Thomas Myles’ ownership, and gives details of the auxiliary engine he had installed in 1913.

Lloyds Yacht Register 1920 ChotaLloyds Yacht Register for 1920 still includes Chotah, but now owned by Michael Kavanagh of Arklow, who had been using her for fishing since at least 1919

The Lloyds Yacht Register for 1915 was the last one published for four years while World War I was fought, and then in the Register for 1920 Pat found that Chotah did indeed as rumoured go to Arklow to become a fishing boat under the part ownership of Michael Kavanagh, although oddly enough he continued to register her as a yacht.

But while a visit to Arklow Maritime Museum by Pat Murphy and fellow Asgard enthusiast Wally McGuirk may have failed to find any photo of Chotah in her Arklow days, what it did find was clear evidence that she had been sold off for fishing by the end of World War I, and her Fishing Permit for 1919 is on display, together with the names of all her crew.

Chotah’s Fishing Permit for 1919 Arklow Maritime MuseumChotah’s Fishing Permit for 1919 is displayed in Arklow Maritime Museum. Photo: Pat Murphy

chotah  crewAlso in Arklow Maritime Museum is the list of Chotah’s fishing crew for 1919. Photo: Pat Murphy

Who knows, but somewhere in Arklow there may be an old photo of the basin with Chotah among the fishing boats there. It would be quite a find. Meanwhile, it seems that Brian Byrnes might have to take his brush to that smokestack in order to create the more probable reality.

On the other hand, just as a postage stamp with some printing fault or without perforations is worth very much more than an unblemished one, so it could be argued that Brian’s visionary notion of Chotah with a smokestack is truly priceless. If somebody of a pedantic frame of mind wants a painting showing her as she more probably was, then it should be commissioned as a new work of art. Meanwhile, let’s hear it for the smokestack.

Published in W M Nixon
Tagged under

#gunrunning – This weekend marks one hundred years since the gun running into Kilcoole Beach in County Wicklow by the yacht Chotah, as equally an important landing for the 1916 Rising but much less known than the famous Howth gun running carried out by Erskine Childers on Asgard

It's part of a fascinating but little know maritime dimension to the Rising where yachts and trawlers were deployed to carry the precious weapons to Ireland.  It was Childers' yacht Asgard and Conor O'Brien's Kelpie which carried the vital cargo, having been loaded from a tug in the North Sea but locally there were fishing vessels such as the Nugget from Howth that also ferried the guns from yachts to shore.

The Kilcoole Gun running Centenary Heritage Weekend is a two day celebration to mark a historic occasion: on 2 August 1914, 600 guns landed at Kilcoole beach and were brought to the village for the 1916 Rising. The programme is attached for download below.

In 1914, Erskine and Molly Childers transported guns on their yacht, the Asgard, from Germany to Ireland.

These had been bought to arm the Irish Volunteers in response to the Larne gunrunning that armed the Ulster Volunteers. However, of the 1,500 Mauser rifles, while 900 were landed at Howth the remaining 600 were to be landed at another suitable location.

On the morning of the 2nd of August 1914 the second part of this shipment was landed on Kilcoole beach, transported there on the yacht, the 'Chotah'.

What happened at Kilcoole will be celebrated this weekend and will include demonstrations and a re-enactment of trades of the time.

Come along and see the historical re-enactment of the gun running which will include a parade led by an Army Colour Party down to the beach, vintage trucks and cars of the time, and a full display by a re-enactment company to include a yacht ready to unload its cargo!
Don't miss the traditional Irish cookery demonstrations, lace & quilt expos and craft demonstrations such as weaving, stone cutting, wool spinning, wood turning/chair making and basket making.

In addition, there will be displays of historical importance pertaining to Kilcoole such as photography of the period, genealogy, traditional games, and music and dance. A Latin mass is also planned.
The community will be encouraged to dress for the period as Kilcoole will go back in time!

For more on this story click for a Wicklow People article

Published in Historic Boats

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020