Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: Belfast Lough

Dublin Bay has been the home of the Mermaid class since 1932 when they were designed by J B Kearney.

They race regularly in Dun Laoghaire, Clontarf, Rush, Skerries, Wexford, Foynes, Dungarvan and Sligo. And for the first time ever in early May, the Royal North of Ireland Yacht Club on the south shore of Belfast Lough will welcome Mermaid visitors to the Simon Brien-sponsored Ulster Championships. It is said that this is the first time that they will have travelled North.

The Dublin Bay Mermaid is a one-design, wooden sailing dinghy originally designed for sailing in Dublin Bay. It is a 17-foot, half-decked, centreboard boat rigged as a Bermuda sloop. The boats have a helm and two crew with a main sail, jib and spinnaker.

Royal North of Ireland Yacht Club on the south shore of Belfast LoughRoyal North of Ireland Yacht Club on the south shore of Belfast Lough

The idea for the event came to fruition at the Irish Sailing Champions Cup in Foynes, Co Limerick, last year when Ross Nolan, the Event Director, met officers from the Mermaid Association.

Darach Dinneen, President of the Class, said, “The first-ever visit of the Dublin Bay Mermaids to RNIYC marks an important milestone, blending tradition with the thrill of discovering new waters. As these iconic vessels arrive at the club for the first time, they bring a sense of heritage and friendship, bridging the gap between past and present. It will be a weekend where experienced sailors gather to witness history in the making. The timeless beauty of the Mermaids has found a new home in the warm welcome of the RNIYC's shores. This joining of sailing cultures not only honours the legacy of the Mermaids but also symbolises the spirit of adventure and inclusivity that defines the sailing community. The bond between Dublin Bay Mermaids and RNIYC promises a future filled with shared experiences and fond memories in Cultra Bay”.

Nolan has been told the ones to watch are Paddy Dillon in Wild Wind (131), Jim Carthy in Vee (123), Paul Smith in Sailing Jill (134) and Terry Rowan in Red Seal (121), who has a wild card.

Launching for the event is available on Friday, 3rd May, and full information can be found here

Published in Mermaid

Bangor in County Down had a coating of snow and ice on Wednesday morning this week, and the Marina didn’t escape either.

Temperatures are forecast to plummet as low as -8C over the coming days as Northern Ireland continues to feel the grip of cold Arctic air, according to the Met Office.

It was a beautiful sunny morning but certainly chilly, and the fresh water from the river in Ward Park in the centre of the town flowed underground into one corner of the marina.

When it is cold and calm, this freshwater floats over the saltier seawater and starts to freeze. If you take a closer look at the photograph (above), you'll spot this thin, slushy ice forming on top. As the marina office confirmed, “Thankfully, icebreakers were not required”.

Published in Belfast Lough

It will be all change in the operation of Bangor Marina on Belfast Lough from September 2024. This has been outsourced to a private operator since 1 April 2008, with the latest agreement expiring on 30 September 2024. An opportunity now exists for an experienced operator to take on the management of Bangor Marina and Harbour for the next 50 and a half years.

Bangor Marina and Harbour is one of the largest Five Gold Anchor-accredited marina developments in Ireland.

The 541-berth marina is accessible 24/7 at all states of tide and is home to an active fleet of leisure and commercial vessels. It attracts thousands of visitors from all over the world annually and is a real focal point in North Down.

The Bangor Regeneration team has recently notified that the tender process for a marina operator from September next year has commenced, with adverts in the press having been issued.

The Bangor Marina Berth Holders Association has handily summarised the details surrounding the process, and members have been given the following information:-

  • The contract period is to run for 50.5 years.
  • Marina operator should incorporate the boatyard into its business plan, although existing boatyard /brokerage and chandlery are currently leased to Sept 2028.
  • New operator to have a key role in devising and finalising plans for any redesign / investment in the marina.
  • Potential operator investment and attraction of additional complementary funding forms part of the tender evaluation process.
  • Potential bidders are expected to demonstrate they are suitably resourced and have recent experience of the management of three marinas of similar size.
  • Stage 1 of the process takes the form of a Pre-Qualification Questionnaire. From the assessment of these returns it is intended that 5 potential bidders will be invited to tender in stage 2 of the process.
  • Stage 1 to be completed by 11 December 2023, Stage 2 completion of submissions by 11 March 2024.
  • Final selection by June 2024, new contract start date is October 2024.
  • Marine Projects Ltd are managing the procurement process, selections to made by a panel including Council representatives.

The estimated value listed on this Tender document is £100,000,000.

Marina and Harbour Manager Kevin Baird said about the project; “It's exciting to think about what Bangor Marina, the seafront, and Ballyholme could look like in 10 years. I'm really hoping that sprucing up our waterfront is just the start of making our city even better”.

Published in Irish Marinas

Northern Ireland's Bangor Marina on Belfast Lough has qualified as first responders for oil spills, earning the MCA P2 designation.

The Bangor Marina crew worked hard, combining classroom learning and practical exercises led by the experts at Ambipar Response UK, a leading environmental management company.

Ambipar’s experience in oil pollution was a huge help, and the team is now ready to tackle oil spills effectively, Marina Manager Kevin Baird said.

“It's great to see their commitment to protecting our seas from oil pollution. They're not just trained; they're passionate about making a difference. We're proud of their achievement and our ongoing commitment to safeguarding our marine environment,” Baird said.

Published in Belfast Lough

Ten RS Fevas from clubs around Belfast Lough rounded off their season with a Final Fling at Royal North of Ireland Yacht Club recently.

After the initial strong wind died down to just in time to allow the event to take place, the fleet of ten boats came to the line, five from Ballyholme, including Kirsty and Rory McGovern, new to the class and five from the host club.

Race Officer Terry Rowan set the course and got three races away without delay. This was a bonus for the fleet to have the experience of three short races and practice at starts.

The Rideout sisters - Emily and Annabelle from Ballyholme, won Race 1, and Matt and Peter Rideout pipped them to the finish line on Race 2. However, the girls got back to win the third race and took the overall prize. Sally Nixon and Jess Dadley-Young from BYC got in three good races with a second and two thirds. Niamh Coman and Ellie Nolan (RNIYC) had their top result of a fifth and two sixths whilst Mum Aileen and son Louis were consistent to finish 4th overall. As the afternoon progressed the wind died to nothing, and the sailors were ably assisted to shore by the rescue crews.

After racing the competitors enjoyed a meal together, everyone being awarded prizes including the youngest helm and crew (Martha Nolan and Cara Coman), newcomers to the fleet (Izzy Stout and Amelie Stevenson) and best capsize (Finlay Pierce and Benjamin Wallace).

Published in RS Sailing

When the Vikings first swept into Belfast Lough around 800 AD, the lack of harbours was no problem, as the gently shelving beach at the wide expanse of Ballyholme Bay was ideal for hauling their longships ashore. Thus Ballyholme – whose name suggests a mixture of Norse and Irish – provided the beginnings of a Viking stronghold which developed eastward through the little natural though drying harbour of Groomsport, and on down to what is now Donaghadee inside the Copeland Islands at the nearest point to Scotland.

In the twelve hundred or so years since, the area has seen dominant rulers and cultures come and go. But it seems that underneath the contemporary affluent appearance of what is now known as the Gold Coast, a little knot of the determined Viking spirit has endured in Donaghadee, and there appears to have been a quiet but very tangible revolution recently.

The fishing port of Klaksvik is the heart of football enthusiasm in the Faroes. Cruising the islands can be a challenge. Although the tides go up and down very little, the tidal streams can roar through channels and past headlands like torrents, with boat-wrecking tide races resulting. As for the wind, it seldom blows steadily and horizontally, but goes up and down, with vertical gusts hitting the sea like gunfire.The fishing port of Klaksvik is the heart of football enthusiasm in the Faroes. Cruising the islands can be a challenge. Although the tides go up and down very little, the tidal streams can roar through channels and past headlands like torrents, with boat-wrecking tide races resulting. As for the wind, it seldom blows steadily and horizontally, but goes up and down, with vertical gusts hitting the sea like gunfire

For, just the other day, the good people of The ’Dee woke up to find that the street signs round their harbour had suddenly been changed to indicate that they are now part of the Faroe Islands, and thereby Danish in international terms.

FULMARS FOR LUNCH

Already, we’re assured that havestur, the favoured delicacy of Faroese cuisine, will be on the menu at the highly-regarded harbourside eateries. It’s an acquired taste – it’s marinated fulmar. But if you’re peckish enough - as in absolutely starving - you’ll manage it.

Also planned are several variations in the preparation of whale meat, as the most dedicated Faroese citizens-in-the-making in Donaghadee are determined that they will replicate the islands’ controversial grindadrap, the annual mass slaughter of pilot whales and dolphins.

BLOOD-LADEN AFFAIR

This is a blood-laden affair that the true-blue Faroese see as a non-negotiable part of their culture and heritage. The Donaghadee Faroese plan is to replicate it by temporarily sealing off one end of Donaghadee Sound inside the great Copeland Island, and then herding shoals of amiable whales towards it with typical northern industrial vigour.

Fun for all the family….the annual Grindadrap is seen as a non-negotiable part of Faroese heritageFun for all the family….the annual Grindadrap is seen as a non-negotiable part of Faroese heritage

Another challenge will be found in mastering the art of being a “Strong Farmer”, Faroese style. A Faroese Strong Farmer is the man or woman who has best mastered the art of lowering a sheep down the vertiginous cliffs to some ledge of otherwise inaccessible luscious grass and then – more importantly – getting the fattened sheep back up again. For Donaghadee, it is thought that training in this can best be done with some modifications to the artificial rock-climbing wall in the nearest Leisure Centre, but local abandoned quarries are also being considered.

 Being a sheep farmer in the Faroes involves skills not taught at your usual Agricultural College Being a sheep farmer in the Faroes involves skills not taught at your usual Agricultural College

FOOTBALL LINKS

The final piece in the Donaghadee-Into-The-Faroes project is the addition of Donaghadee soccer players into the deservedly famous Faroese team. The word is that a renowned small-but-perfectly-formed Donaghadee citizen of widely-communicated football interests has been approached with a view to taking up semi-permanent residence in the Faroese football heartland around the fishing port of Klaksvig. The feeling is that any crowd-funding project towards this personal re-location would be very generously supported.

As for the change’s sailing implications, it would mean that the many boats berthed in Bangor Marina would have the option of “going foreign” after a voyage of only six miles, and this might confer Duty Free benefits in storing up beforehand. So in all, Donaghadee-in-the-Faroes seems like a very good idea.

Published in Belfast Lough
Tagged under

Two Belfast Lough sailors are racing in the 50th Anniversary Rolex Fastnet Race, which starts on Saturday from Cowes on the Isle of Wight and finishes in Cherbourg.

Ewan Finlay is racing as foredeck crew on Mark Emerson’s A13 Phosphorus II, an Archambault A13, the one and only A13 ever built. It was formerly known as Teasing Machine and sailed very successfully by a professional French crew. Phosphorus II was sixth overall in IRC in the 2021 Fastnet Race.

Belfast's Ewan Finlay (second left) on board Phosphorus II that competes in this Saturday's Fastnet Race from CowesBelfast's Ewan Finlay (second left) on board Phosphorus II that competes in this Saturday's Fastnet Race from Cowes

Ross Boyd is on onboard Robert Rendell’s Samatom from Howth. Regular Aflaot readers will recall she won the 2021 Sovereign's Cup Regatta Coastal Divison at the first attempt. Boyd says he is pleased that there are two RUYC members racing in this Fastnet, and he says he is “looking forward to the competition in the 104 boat class”.

This Saturday’s 2023 Rolex Fastnet Race will be the biggest offshore race of all time, with a record-breaking entry list of over 490 yachts for its 50th-anniversary edition.

At one point it was thought that the start might have to be delayed as a relatively brief but extremely strong period of southwest winds forecast seemed likely for Saturday afternoon and evening along the south coast of England, but the expected wind and weather conditions for the race while still unsettled, look to be averaging out

Starting from The Royal Yacht Squadron line in Cowes, the course is about 695 miles via the Fastnet Rock to the finish line at Cherbourg.

Published in Fastnet

On Monday last (17th), several search and rescue teams held a very active training session out of the village of Groomsport on the North Down coast.

Taking part alongside Lagan Search and Rescue’s Ribcraft Class 1 Lifeboat were Bangor Atlantic 85 inshore and Donaghadee’s Trent Class Lifeboats, Coastguard Rescue Teams from Bangor and Portaferry on Strangford Lough, as well as K9 Search and Rescue and safety boats from Royal North of Ireland YC on Belfast Lough.

 The Search and Rescue crews involved in the Joint Exercise on the North Down Coast The Search and Rescue crews involved in the Joint Exercise on the North Down Coast

The aim of the exercise was to replicate a scenario where a boat was sinking near the coastline, requiring survivors to evacuate to a life raft and swim to safety. During the exercise, lifeboats and Quayside Search and Rescue teams, as well as Swiftwater and Flood Rescue Technicians, were used in the search for survivors.

Practice using a rescue raft during the SAR Joint Exercise on the North Down CoastPractice using a rescue raft during the SAR Joint Exercise on the North Down Coast

One of the scenarios practised by the Swiftwater and Flood Rescue Technicians from LSAR, K9 SAR and Coastguard Rescue was using a rescue raft to practice extracting a casualty from rocks inaccessible by land or boat. They work as a team to swim the raft across a distance of water using ropes in a continuous loop across the water to bring back the casualty on the raft.

Lagan SAR said it was “an incredible opportunity to enhance our skills and knowledge during this exercise, and we're already looking forward to the next one! Thank you to Bangor RNLI for organising”.

Published in Belfast Lough
Tagged under

On July 7th, the TS State of Maine, the current training ship of the Maine Maritime Academy, docked at the Gotto Wharf in the Herdman Channel in the Port of Belfast.

She was formerly in the United States Navy service as the USNS Tanner and assumed her present name and role in June 1997. She had been launched in 1990 as an oceanographic research ship.

Maine Maritime Academy is a public, co-educational college located in the coastal town of Castine in the state of Maine in the northeastern United States. The student population numbers approximately 950 in engineering, management, science, and transportation courses.

Four of the volunteers from the charity, the independent Lagan Search and Rescue, along with members of the K9 Search and Rescue NI and Bangor Coastguard Rescue, were welcomed aboard by Captain Gordon MacArthur. They met some of the 300 students and 70 qualified crew. The ship had arrived in Belfast, having visited Ponta Delgada, Portugal, Vigo in Spain, and Kiel in Germany.

She is now back in her homeport in Maine.

LSAR were pleased to have the chance to visit the ship:” Thank you to the Captain and crew of TS State of Maine for the invite and to Doyle Shipping Group for facilitating the visit”.

Published in Belfast Lough
Tagged under

The Spring Series at Royal Ulster Yacht Club on Belfast Lough ran over three Sundays in April and attracted 12 cruiser racers. IRC winner after six races was the local boat, five points ahead of Stuart Cranston’s Ker 32 Hijacker from Strangford Lough YC. Michael Eames’ All or Nothing was in third slot.

Final Call II light airs on the first day racing of the Royal Ulster Yacht Club Spring Series Photo: courtesy TYTFinal Call II light airs on the first day racing of the Royal Ulster Yacht Club Spring Series Photo: courtesy RUYC

In the Whitesail division, Vicki and Martin Dews’ Sigma 33 Elandra was the first of two starters, having something of an easy time of it as Jacada (Andrew Kennedy) sailed only two races.

Elandra, the Sigma 33 of Vicki and Martin Dews (left) with Ian Chapman's Cheoy Lee 36-ft Classic yachtElandra, the Sigma 33 of Vicki and Martin Dews (left) with Ian Chapman's Cheoy Lee 36-ft Classic yacht

The first day’s racing was in light winds, as was the second outing, with only the last meeting having anything of a decent breeze.

The Hijacker team looking relaxed at the Royal Ulster Yacht Club Spring Series Photo: Bob EspeyThe Hijacker team looking relaxed at the Royal Ulster Yacht Club Spring Series Photo: Bob Espey

For the first three races, Hijacker looked as if they were going to give Final Call II a run for their money with two wins and a second, but a drop to seventh in the final two races meant they were down to second overall. John Minnis says they can laugh about it now but in one of the early races, the crew was debating which spinnaker to use, only to find they actually had none on board. All were in the marina store.

It was good to see three boats new to the fleet - Elandra the Sigma 33, Alan Hannon’s JPK 1030 Coquine and Ian Chapman’s Cheoy Lee 36 Classic yacht.

At the prizegiving, Hon Secretary Catherine Gallagher thanked everyone who helped make the Spring Series successful. She also mentioned the new rating system, RYA YTC, which the club will use this year alongside the more traditional systems.

Michael Gunning, a Final Call II crewman on John Minnis's Archambault 35, the overall RUYC Spring Series winner with Barbara Coffey Photo: Fiona HicksMichael Gunning, a Final Call II crewman on John Minnis's Archambault 35, the overall RUYC Spring Series winner with Barbara Coffey Photo: Fiona Hicks

Stuart Cranston, skipper of Highjacker, the RUYC Spring Series runner up in IRC with Barbara Coffey Photo: Fiona HicksStuart Cranston, skipper of Highjacker, the RUYC Spring Series runner up in IRC with Barbara Coffey Photo: Fiona Hicks

Martin Dews, the Whitesail division winner of the RUYC Spring Series with Barbara Coffey Photo: Fiona HicksMartin Dews, the Whitesail division winner of the RUYC Spring Series with Barbara Coffey Photo: Fiona Hicks

The overall winner John Minnis was happy with the Series and the result of Final Call II. “Great series conditions and racing format for everyone… super to see so many yachts from different clubs creating some tight competition… the RUYC sailing committee, mark layers, battery team and Tom Bell of Grange Wine Merchants deserve special thanks for all their organisation and extremely generous sponsorship” He added, “Well done to the team on Final Call II who showed composure and commitment securing a series win only on the last day”.

Page 1 of 31

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023