Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: irish sea

A ferry crew member from an Irish Ferries passenger ship remains missing after a failed search attempt in the Irish Sea overnight.

The WB Yeats ferry operates the Dublin to Holyhead route. The alarm was raised at around 9pm yesterday.

The search is being overseen by the HM Coastguard in Holyhead in Wales, but the Irish Coast Guard is providing assistance.

For more on this incident consult the TheJournal.ie here.

Published in Ferry

Government members at senior level have rejected claims from UK prime minister Boris Johnson that the EU is seeking to impose a blockade in the Irish Sea after Brexit.

Taoiseach Micheál Martin said another of Mr Johnson’s claims – that he needed to dismantle parts of the withdrawal agreement he reached with the EU in order to “stop a foreign power from breaking up” the UK – were “not the case and he knows well that’s not the case”.

Mr Johnson wrote in the Daily Telegraph on Saturday that the EU was threatening to impose a food “blockade” in the Irish Sea that would destroy the “economic and territorial integrity of the UK”.

This was a reference to the need for the UK to outline its future food standards regime to the EU before being granted permission to export to the bloc.

Minister for Foreign Affairs Simon Coveney dismissed Mr Johnson’s claims as “totally bogus” and “absolutely not true”. He said the UK was damaging its international reputation and he criticised as “spin” Mr Johnson’s claim about a blockade between Britain and Northern Ireland.

Further reading from the Irish Times here.

Published in Irish Ports

Metocean devices will be deployed in the Irish Sea off the Wicklow coast) in the coming days, weather permitting, to provide environmental data for the development of the Arklow Bank Wind Park.

Similar to last autumn’s deployment, four separate devices to monitor waves and currents will be deployed, which will include a seabed frame with the sensors mounted on it, an anchoring system, and a surface marker buoy.

The devices will be deployed using either the AMS Retriever (Callsign MEHI8) or Husky (Callsign 2EQI7), both versatile multi-purpose shallow draft tugs. The devices will remain in place for approximately six months, serviced on a three-monthly basis.

During deployment and recovery operations, the AMS vessel will be restricted in its ability to manoeuvre. The devices will be located using yellow special mark buoys which will have the relevant markers and ATON characters.

The location of the devices will be off the Wicklow coastline as detailed in Marine Notice No 31 of 2020, which is available to download below.

Published in Marine Warning

Stena Nordica continues in nomadic mode as Afloat tracked the ropax ferry on a repositioning passage to Fishguard, having relieved duties of former engine troubled newbuild Stena Estrid which returned to the Holyhead-Dublin route today, writes Jehan Ashmore.

The leadship of Stena's E-Flexer class Chinese newbuilds, had problems with the ship's German built engines, which led to repairs following arrival in early May at Cairnryan (Loch Ryan Port). From Scotland, the Stena Estrid made last night a repositioning passage through the Irish Sea to Wales so to resume service from Holyhead with this morning's sailing.

Among measures from today, face coverings are recommended for all passengers and crew on Stena Line vessels (etc), in terminals, and on the company's routes on the Irish Sea and the North Channel where social distancing is difficult to achieve, such as in stairwells, lifts and in corridors.

The final sailings on the Dublin-Holyhead route undertaken by Stena Nordica involved sailings last night before returning to Wales this morning and off again on a repositioning passage from Anglesey to Fishguard. But before more on the Stena Nordica's departure, it should be recalled that the Japanese built ropax was also a routine ferry working on the central Irish Sea route in tandem with existing ferry Stena Adventurer, until replaced by Stena Superfast X in 2015 (see: below DFDS Malo Seaways) and Stena Estrid entering earlier this year.

As for the 'Superfast' series ship is to embark on a new career with Corsica Linea sailing in the Meditteranean Sea but not between France and Algeria in north Africa as originally planned. Due to Covid19, the renamed A Nepita will aptly first serve Corsica on the Marseille-Bastia and Marseille-Ajaccio routes.

Returning to Fishguard where once again Stena Nordica will be on relief duties at the Pembrokeshire port so to enable the routine ferry to Rosslare, Stena Europe head for annual dry-docking at Harland & Wolff, Belfast. After Afloat tracked Stena Nordica this morning the ropax was later caught up at the south Wales port with a lunchtime arrival, however the first relief sailing won't be until tomorrow and at the same time.

These deployments are no way novel, as Stena Nordica has served the Swedish based operator on many a route across the Stena Line network. Mostly involving such duties over the years on the Irish Sea, following a debut for Stena but beginning in Scandinavia. This was in a more settled role when the ferry was a routine  ship on the Karlscrona, Sweden-Gdynia, Poland route.

Prior to the debut on the Baltic route, the ropax had been named European Ambassador for client, P&O Irish Sea which also placed an order for a pair of smaller half-sisters likewise built in Japan to serve the Irish Sea. The pair European Causeway and European Highlander, whose names aptly reflect the geographically locations either side of the North Channel route of Larne-Cairnryan remain in service. With competing Stena Line based at their nearby custom built terminal officially named Loch Ryan Port when opened in 2011 following closure of Stranraer. 

As for the suffix of 'Ambassador' perhaps something to do with operating on the Irish Sea, given the ferry first served between Dublin and Liverpool, in north-west England. So when P&O introduced the ropax the famous ferry brand then was split under various company names to reflect the region of operations, hence P&O (Irish Sea) Ltd. Due to the 'Nordica's extensive nomadic career, Afloat has concentrated just on Irish related highlights, though in between times at Holyhead, the ropax in 2015 was chartered to DFDS Dover-Calais service as renamed Malo Seaways (See: Deal or No Deal /Ferry & Irish Cargoship).

As for the European Ambassador's service linking the Liffey and Merseyside this did not last long, as P&O also briefly relocated from the UK port to Mostyn in north Wales, where earlier this year, Norbank undertook berthing trials due to the backdrop of a dispute of port fees in Liverpool (Peel Ports Group). This was resolved with the service still in place on the central Irish Sea route connecting the Irish capital with the city of Liverpool.

It was during the use of Mostyn on the Dee estuary shared with the Wirral Peninsula in England, that P&O (Irish Sea) also ran European Ambassador on another route after calling to Dublin but this involved beyond the Irish Sea. This other route connected the Irish capital with Cherbourg, France, though the weekend only summer service linking to mainland Europe only lasted two seasons before Mostyn in 2003 was abandoned with P&O returning to Liverpool.

P&O (Irish Sea) where the first ferry operator to launch the direct Dublin-France service by calling to Cherbourg, the Normandy port is particularly familar with various routes and operators to and from Ireland over the decades. The latest example been the reopening of the Dublin-Cherbourg route which Irish Ferries launched in 2014 using the chartered ropax Epsilon which recently returned to their Dublin-Holyhead service in competition with Stena.

Taking place of the ropax on the Ireland-France route is W.B. Yeats, which resumed 'cruiseferry' operated sailings for the summer months. Due to Covid19, these sailings were delayed severly by almost three months.

From the onset W.B. Yeats was built to operate the Dublin-Cherbourg route (and Holyhead in winter), though ultimately at the expense of abandoning Rosslare Europort where Irish Ferries operated Oscar Wilde to Cherbourg. In addition the summer high-season Roscoff route with shorter sailing times.

The operator faced criticism yet cited the reason for the withdrawal from Rosslare was because that what customers wanted given the convenience of Dublin Port and demand of freight hauliers. However, this was not the case for those residing or operating business in the south-east and from the neighbouring region of Munster.

As Afloat reported yesterday, ferry bosses ruled out increasing Ireland-France summer sailings, despite pressures of Covid19 social distancing measures impacting ferry capacities. In addition to speculation of a boost as people avoid aviation travel and instead take to the seas.

The absence of Irish Ferries was keenly felt in Rosslare albeit with Stena operating to Cherbourg. Things were to change earlier this year when Brittany Ferries strategically filled the void by abandoning the Cork-Santander route and replaced with the Rosslare-Bilbao link. This is the 'Europort's first 'direct' service to Spain. Unlike the longer operating LD Lines, which among its network had an 'in-direct' link from Rosslare to Spain via St. Nazaire, France and onward sailing across the Bay of Biscay to Gijon in northern Iberia.

Also Brittany Ferries first use of Rosslare will see the resumption of the Roscoff route which the operator will run on an économie' branded basis. 

When Stena Nordica takes over the roster of Stena Europe in Fishguard, with a scheduled afternoon crossing to Rosslare, the ropax's arrival will be far from been a stranger but a familiar sight in the Wexford ferryport.

As last year Stena Nordica spent some six months on the southern corridor while Stena Europe went to Asia when dry-docking in Turkey. An extensive mid-life refit was however delayed on the veteran vessel dating to 1981. However despite been the oldest ferry on the Irish Sea, Stena's investment and commitment of the ship is to see the ferry remain for more years on the St. Georges Channel link.

It was during previous P&O (Irish Sea) times when European Ambassador sailing on the Dublin-Cherbourg route would make en-route calls to Rosslare but only occasionally as such stopovers was dictated by freight demand. This made the route all the more fascinating but also a boost for the south-eastern 'Europort' the closest Irish port to our nearest continent.

In the final year of the Dublin-Cherbourg seasonal service that ended in 2003, P&O decided to open up the Ireland-France route to 'foot' passengers, an opportunity that was personally seized upon. The inaugural sailing of this type took place over a St. Patrick's Day bank holiday weekend, with the ferry departing notably from within Alexandra Basin and passing at close quarters the lighthouse at the end of the North Wall Quay Extension. All this making it novel compared to the other terminals in the port downriver.

An another added bonus on board European Ambassador in P&O's famous livery of the funnel's flowing flag, was to sail along Leinster's eastern seaboard. This is where among the coastal sights is scenic Dublin Bay and the Wicklow Mountains. Such scenery no doubt welcomed by those also travelling from mainland Europe.

Such a vista is now available with W.B. Yeats and in cruiseferry comfort plus with the knowledge and benefit of the ship's emission 'scrubbers', following an EU Sulphur Directive to cut down on harmful pollutants. The directive to have scrubbers installed came into effect on and after 1st January this year. 

Published in Ferry

UK government rules out any new customs infrastructure at ports on either side of the Irish Sea to implement the post-Brexit Northern Ireland protocol.

In a paper outlining how it will implement the protocol, which was agreed alongside the withdrawal agreement last year, the government also said there would be no requirement for export declarations for goods moving from the North to Great Britain.

“At the heart of our proposals is a consensual, pragmatic approach that will protect the Belfast (Good Friday) Agreement and the huge gains from the peace process. Implementing the protocol in this way will ensure we can support businesses and citizens, and protect Northern Ireland’s place in the UK’s customs territory, while upholding our commitments to the EU’s Single Market.

“Northern Ireland will benefit fully from its access to the UK and EU markets. The whole of the United Kingdom will be able to capitalise on the opportunities that will come from forging our own path and striking new free trade agreements with countries around the world,” cabinet office minister Michael Gove said.

For further details of the protocol The Irish Times reports here.

Published in Ferry

Three wildlife trusts in the north-east of England have been boosted with a £300,000 (€345,000) award from a major grantmaking charity for efforts to protect marine wildlife and habitats in the Irish Sea.

As the Chester Standard reports, the Esmée Fairbairn Foundation has given the five-year grant to fund staff carrying out marine policy work and promotion in the north-west region and the wider Irish Sea.

“The funding will enable us to continue our work to protect and lobby for Marine Protected Areas as well as raise awareness about issues affecting our marine life and champion the sustainable management of our seas,” said Martin Varley, operations director with the Cheshire Wildlife Trust.

The grant will also support collaborative work with fellow wildlife trusts in Lancashire and Cumbria, which have already secured public and political support for the designation of 10 Marine Conservation Zones in the Irish Sea.

The Cheshire Standard has much more on the story HERE.

Published in Marine Wildlife

RNLI fishing safety manager Frankie Horne has urged the fishing community to avail of safety training that is on offer for their crews and to ensure that their safety equipment is up to date.

It comes after the skipper of a fishing vessel that sank late last year off the Isle of Man has attributed their rescue to the safety training the crew had undertaken previously and to their lifejackets, which were fitted with personal locator beacons (PLBs).

On the evening of 23 November last year, the fishing vessel Polaris suffered a catastrophic hull failure in the Irish Sea off the west coast of the Isle of Man.

The vessel sank so rapidly that the skipper only had time to send out a Mayday to the coastguard and other surrounding fishing boats before the vessel became submerged.

The coastguard immediately launched two RNLI lifeboats, from Port St Mary and Port Erin, and a rescue helicopter. However, it was a local fishing vessel, Lynn Marie, which arrived first on scene.

The skipper and a crew member from Polaris had been in the water for at least 15-20 minutes before help arrived.

The skipper of the Lynn Marie feared the worst on arriving at the scene as the Polaris had already gone below the water. The skipper stopped his engine to listen for the crew of the Polaris, which proved a wise decision as he heard two men in the water shouting. The Lynn Marie crew located them with a search light and recovered them from the water.

‘I can tell you that there is no doubt that the lifejackets saved our lives’

Commenting on the rescue, Horne said: “After speaking with Gordon Mills, the skipper of the Polaris, and the crew of Lynn Marie on their arrival at Peel, it was quite clear that this could have been a very different story had the crew of both vessels not acted so professionally.

“The crew had attended safety training and wore lifejackets fitted with personal locator beacons which had increased their chances of survival.”

Gordon Mills, skipper of Polaris, added: “At no time did I feel our lives were in danger due to our training and equipment.

“We had a policy of wearing lifejackets on the working deck since attending refresher training, where I was shown a film involving fishermen wearing their normal working clothes, being put through their paces in the RNLI Survival Centre Environmental Pool, both with and without lifejackets in cold water with wave movement whilst attempting to recover themselves.”

Mills added: “To see fishermen struggling in a controlled environment and only lasting a few minutes or in some cases a few seconds without the lifejacket makes you think about your own safety.

“I can tell you that there is no doubt that the lifejackets saved our lives. We wouldn’t have even been afloat for the crew of fishing vessel Lynn Marie to recover us from the water had we not been wearing them.

“I would encourage all fishermen to start wearing their lifejackets while on deck — you just never know when you might need it.”

Published in Fishing

On the Irish Sea the biggest ferry operator in this market area has confirmed that there will be checks, inspections and some new infrastructure for trade, and it wants to know what the UK government will pay for.

The plans, according to BBC News, will affect both trade with the Republic of Ireland and within the UK between Great Britain and Northern Ireland, as a result of Brexit.

Stena Line said that its working assumption was that new checks would be carried out in British ports.

Stena boss Ian Hampton told the BBC that though a managed exit was "positive" and the extent of new procedures could be lessened with a strong deal, "there's a border, and the border requires checks".

The border will be down the Irish sea, he said. And while his company won't be doing them, it will have to provide room for officials to do the checks, he said.

As well as operating a fleet of ferries connecting Great Britain to the island of Ireland, Stena also owns three ports on the route, and wants to know the physical changes required on what has, until now, been seamless trade.

The industry's assumption is that the checks will be done in Great Britain on exit rather than in Ireland or Northern Ireland.

For much more on trading relationships including those on the North Channel routes click here

Published in Ferry

An angler from Blackpool learned he was the subject of a nine-hour search and rescue operation only after being told about the incident by an employee at a bait shop in the Lancashire town, as the Blackpool Gazette reports.

It’s understood that the man gave a statement to police after his discussion with shop workers at Blackpool Angling Centre revealed he was likely the person at the centre of a major emergency operation launched two days previously, on Thursday 2 January.

The man — who had been angling at Blackpool’s South Pier when he says he got into difficulty with his fishing gear — is believed to be new to the area and “genuinely didn’t know there was a full scale search for him”, according to a spokesperson for the shop.

The Blackpool Gazette has more on the story HERE.

Published in Angling
Tagged under

Searches for a light aircraft that went missing between the Irish Sea and the Menai Strait off North Wales yesterday afternoon (Monday 25 November) were suspended overnight.

The aircraft, with one person on board, reportedly disappeared from radar near Puffin Island off Anglesey at lunchtime yesterday.

This prompted a major search operation that involved HM Coastguard teams from Penmon and Bangor, the coastguard helicopter from Caernarfon and RNLI lifeboats from Beaumaris, Moelfre and Llandudno.

Searches were set to resume this morning in an area around Penmon, on the opposite side of Anglesey from Holyhead.

Published in News Update
Page 4 of 22

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023