Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: Arklow Marine Services

British boatbuilder Chartwell Marine has unveiled its bespoke 12m landing craft commissioned by a leading Dublin boat charter company to support large-scale offshore energy projects.

The aluminium vessel for Irish Commercial Charter Boats (ICCB) will be constructed at Arklow Marine Services, with a view to hitting the water this summer.

And according to Chartwell Marine, it sets the stage “for a rapid build-out of the Irish offshore fleet in the next few years, as new large-scale energy projects come online”.

The company says the “market-first” craft has been designed “to meet ICCB’s expanding operational requirements, including surveying, assisting with cable landing and transporting supplies and personnel to near-shore offshore installations”.

It will be powered by two OXE diesel outboard engines, plus room for a spare onboard, with the flexibility to replace these with electric outboard motors in future.

And its shallow draft, allowing it to operate in depts of just 0.8 metres, will ensure “maximum versatility in the shallow waters around the East Irish coast”.

ICCB director Eoin Grimes said: “We’re excited to help drive the development of the next generation of Irish offshore support vessels.

“Chartwell Marine’s vessel offers us unparalleled manoeuvrability and versatility, especially in the shallow waters around Ireland, which will be vital as we continue to diversify our offering to the offshore energy market.”

Published in Power From the Sea

#Newbuild - A mobile crane has lowered a new workboat into the River Avoca in Arklow this week for Ireland's largest producer of farmed Atlantic salmon, writes Jehan Ashmore.

The newbuild constructed by Arklow Marine Services is the Croi na Farraige (Heart of the Sea), a 17.5m salmon farm harvesting vessel for clients Marine Harvest Ireland.  Staff from the company were invited to name the new vessel though a competition. 

Croi na Farraige was transferred from the AMS building hall to the nearby North Quay of the Co. Wicklow port. It was from the quayside that the flat bottomed hull craft first made contact with the water.

The newbuild is equipped with a hydraulic crane mounted on the bow and a deckhouse is located aft. It is from the stern that can be seen in the above photo that the vessel has a twin rudder and propellor arrangement. Also clearly to be seen is that the vessel's port of registry is Sligo.

Marine Harvest have several sea farms along the western seaboard. They are located on Lough Swilly, Mulroy Bay, Inver Bay, Clew Bay, Kenmare Bay and Bantry Bay.  All of the fish from these farms are packed at the firms Co. Donegal factory in Rinmore on the Fanad peninsula.  

Croi na Farraige, will be used to support those sea-farms in Donegal waters from where Marine Harvest was founded by Irish investors in 1979.

MHI is part of the Marine Harvest Group with heaquarters in Norway, and is one of the world's leading seafood companies and the world's largest producer of Atlantic salmon. The global aquaculture operation employs 12,500 throughout 24 countries and servicing 70 markets.

 

 

 

 

Published in Fishing

#EntersService – The new custom-built car ferry Spirit of Rathlin has finally entered service with a first scheduled sailing today on the Rathlin Island link with Ballycastle on the Antrim mainland, writes Jehan Ashmore.

Spirit of Rathlin built by Arklow Marine Services at cost of £2.8m entered the route which caters for 6 vehicles and 140 passengers. The 28m long newbuild directly replaced the ageing Canna which performed a final crossing last night concluding two decades of loyal service.

The introduction of Spirit of Rathlin is based on a 10 year contract to Rathlin Ferry Co. This was awared to the ferry company following a tender process from Northern Ireland’s Department for Infrastructure (dfi) that funded the ferry. 

Spirit of Rathlin is a boost to islanders and tourists alike as the new ferry offers better accommodation in the form of a saloon lounge area (seating 42) on the main deck. On the above decks 1 and 2, there is additional seating outside to take in the scenic views across Rathlin Sound.

In terms of freight he ‘Spirit’ will have the ability to convey an articulated truck and the newcomer will not be alone as the is also the passenger-only fastcraft Rathlin Express.

Prior to today’s opening, as previously reported on Afloat the new ferry had undergone further works at Mooney Boats, Killybegs. The work involved the use of the Donegal yard's syncro-lift. 

In recent months, essential crew training was carried out before the Spirit of Rathlin was permitted a MCA certification. Also improvements to berthing infrastructure had to be completed in Ballycastle Harbour to accommodate the new ferry.

Published in Island News

#FerryCompleted - Spirit of Rathlin the new £2.8m car and passenger ferry is to be operated under a new ten year contract awarded to Rathlin Island Ferry Ltd, writes Jehan Ashmore.

The newbuild built by Arklow Marine Services undertook sea trials last year and is to replace an ageing ‘Island’ class ferry the Canna on the Ballycastle-Rathlin service. This former CalMac ferry dating to the 1970's has served alongside the passenger only catamaran Rathlin Express, also constructed at the Co. Wicklow shipyard owned by the Tyrrell family.

Spirit of Rathlin was contracted to AMS by Northern Ireland’s Infrastructure department, whose Minister Chris Hazzard welcomed this week the completion of the ferry.

The Minister said: “I am delighted to announce completion of the new car and passenger ferry for Rathlin Island. This is excellent news for the people of Rathlin and particularly for those who use this essential service to go about their daily business.

"The ‘Spirit of Rathlin’ ferry will ensure that passenger and vehicle services can continue to be provided on this important lifeline route between Rathlin Island and Ballycastle. This new ferry has been designed to modern standards and includes the latest technology for the service it will operate.”

Spirit of Rathlin will come into service once the new £1m harbour to accommodate the newbuild is completed. Following that stage a Passenger Certificate is to be obtained from the Maritime and Coastguard Agency (MCA) to enable the ferry to begin operating.

So what does the Spirit of Rathlin bring to the Co. Antrim route, firstly the stern-only loading vehicle ferry includes a modern passenger lounge. During good weather there is an upper passenger deck to take in this most scenic route of the north coast. 

Published in Ferry

#NewBuild - Arklow Marine Services are to launch a new car ferry which is to serve Rathlin Island off the Antrim coast, writes Jehan Ashmore.

Northern Ireland’s Department for Infrastructure (DFI) awarded the contract for the 6 vehicle /140 passenger ferry to the Co. Wicklow based boatbuilder, headed by Billy and John Tyrell.

Responding to Afloat.ie a DFI spokesperson said the Department is still in the process of evaluating the bids for tenderers to operate the new Rathlin ferry.

Following delivery of the new ferry to be named Spirit of Rathlin, the newbuild is to undertake trials for three to four weeks. In addition crew familiarisation is to take place, after which the vessel is expected to come into operation.

The Ballycastle-Rathlin route is operated by the Rathlin Island Ferry Ltd which currently uses three vessels, Canna, Rathlin Express and St. Sorney.

Canna is an ageing ‘Island’ class car ferry, which dates to 1976, having originally served the Scottish West Isles for CalMac. The 40 year-old ferry bow-loading vessel has the same vehicle and passenger capacity of the newbuild. 

In 1997, Canna was transferred to Rathlin with CalMac contracted to run the service. In the following year she was chartered by the Scottish publically funded ferry company to Rathlin Island Ferry Ltd who took over the operation of the service.

In 2009 the passenger-only, Rathlin Express, an aluminium catamaran craft, also built by Arklow Marine Services entered the route.

This leaves the third vessel, St. Sorney, also passenger-only and which serves as a reserve boat. The 40ft ‘Lochin’ cruiser was built by Ryan & Roberts of Limerick.

Published in Ferry

#ArklowMarine – Arklow Marine Services have completed Sally Ann, a newbuild which has been delivered to her owners Scottish Sea Farms.

Sally Ann is powered by twin Doosan V158TIH main engines and designed by consultant naval architects AG Salmon as a multi-role vessel. She  is to be used on the west coast of Scotland where Scottish Sea Farms have all their sites.

The vessel is 22.8m in length with an 8m beam and a lightship displacement of 120 tonnes. She has a service speed of 9 knots with a maximum speed of 10.5 knots. For more details, the Maritime Journal has a report here.

Published in Fishing

#Shipbuilding - Arklow Marine Services recently celebrated the completion of its third service vessel for the offshore wind farm sector in the shape of the Gardian 18.

And as the company's director Billy Tyrrell tells The Irish Times, it's the latest fruit of an important decision the fourth-generation boat builder made some time ago to adapt for the future.

"About five years ago we realised that we had to change tack," he says. "We had been looking after the fishing industry but the decline meant that industry was gone from us."

The solution for Arklow Marine Services was a redirection towards the growing offshore energy sector in the UK - and according to Tyrrell it now accounts for up to 50% of their turnover.

The Gardian 18 itself represents a €2.3 million order, the third for offshore specialist Gardine's subsidiary Alicat following two successful launches in early 2012.

Tyrrell says adapting to the industry's requirements has not been difficult, noting that "the basic principles are the same; we're just applying [our craft] to different markets."

But the firm hasn't abandoned its traditional shipbuilding business, and is even continuing to take on land-based fit-outs and maintenance on the side. As Tyrrell says, "you need the big contracts but you need the small stuff too."

The Irish Times has much more on this story HERE.

Published in Power From the Sea

#newships – Arklow Marine Services, the shipbuilding yard owned and managed by the Tyrrell family, is celebrating the successful completion of a €2.3m order with the launch of a vessel for use in the development of UK offshore wind farms. The Gardian 18, is the third such vessel which the Arklow business has delivered to Alicat a subsidiary of UK offshore wind specialists Gardline , in the last three years.

The Gardian 18 can carry 12 personnel & 2 crew and is fitted with twin MAN main engines each developing 1000 BHP and is coupled to Rolls Royce water jets that will give the vessel a sprint speed of 30 knots and a service speed 25 knots. Gardian 18 has a range of 800 nautical miles.

Arklow Marine Services carries on the proud tradition of shipbuilding in Arklow having commenced trading in 1864 and celebrates 150 years in existence next year in 2014. The Tyrrell name remains synonymous with shipbuilding in Arklow and today the company is led by Directors Billy – Naval Architect & John – Marine Engineer. The company currently employs 30 local people and supports employment with other contractors in the region.

The Gardian 18 was built on-schedule and on-budget over a 30 week period. Among the skills involved in the construction were design and draftsmanship, machining, aluminium fabrication, welding, hydraulic engineering, mechanical engineering, electrical engineering pipe fitting, engine alignment, plumbing, glazing, carpentry, painting, sign writing and cranage. The management of the company would like to acknowledge and thank their excellent workforce whose expertise and strong work ethic which allows them to deliver quality vessels on time every time.

Arklow Marine Services Director Billy Tyrell spoke of the potential for the company to benefit from the development of renewables on both sides of the Irish Sea;

"Over the last number of years Arklow Marine Services has developed a reputation for delivering high performance vessels for the renewable industry. Offshore wind is a rapidly growing sector in the UK and we are well positioned to take advantage of that market. Hopefully, we will see similar development in Irish offshore projects. This can deliver jobs for coastal towns like Arklow and businesses like Arklow Marine Services. We are delighted to continue our partnership with Gardline and look forward to working more closely with them as their business grows."

The United Kingdom is in the process of developing 33 GW of offshore wind energy over the next decade. That is an amount seven times the total electricity demand in Ireland. There is a further 2.5 GW of offshore wind in development on the Irish Side of the Irish Sea. The National Offshore Wind Association has estimated that a supply chain of up to €60bn exists in the Irish Sea Zone.

Brian Britton of the National Offshore Wind Association welcomed this latest contract win for Arklow Marine Services;

Arklow Marine Services is an example of how quality Irish companies can compete for supply chain opportunities that offshore wind development presents. They have already won a significant position in the UK market. We believe that with the development of Irish projects, companies like Arklow Marine Services will generate a significant employment boost for the Irish economy.

Gardline specialise in supporting the deployment, operation and maintenance of offshore wind farms. The Gardian 18 will enter service in late November. This vessel will principally be used to deliver service personnel to the offshore wind farms. The nature and design of offshore turbines necessitates vessels of high specification and unique design suitable for servicing them.

Gardline Managing Director, Steve Thacker explained the reason for partnering with Arklow Marine;
We are delighted to partner once more with Arklow Marine Services for the development of another bespoke vessel for our fleet. We operate in the toughest of conditions. Our customers demand reliability from us and we require vessels which deliver that and which meet the highest standards of safety. The Gardian 18 is the latest in a series of vessels from Arklow for Alicat and is currently for sale, which is an advantage of not having to fund the vessel whilst under construction and is ready to go straight to work

Published in Ports & Shipping

#WFSVlaunch- A third offshore Wind-Farm Service Vessel (WFSV) was launched in late September from Arklow Marine Services boatyard.

The 19m newbuild vessel is the first of a new design which is intended for the upcoming Round 3 offshore sites for the Renewable Offshore Industry in the U.K.

The WFSV has an overall length (LOA) of 20.75m and a beam of 7.36m. The vessel is powered by twin MAN main engines. Each engine develops 1,000 BHP and are coupled to twin Rolls Royce FF550 water jets.

A sprint speed of 30 knots and a service speed of 25 knots. Sea-trials were scheduled prior to the WFSV's introduction into operating at one of the UK's burgeoning new offshore wind -farm sites.

 

Published in Power From the Sea

#LighthouseTender- ILV Granuaile the aids to navigation tender is carrying out another trial run of systems at sea today in Dublin Bay and off Greystones, writes Jehan Ashmore.

As previously reported on Afloat.ie, the Commissioners of Irish Lights 79m tender had undergone work that has involved the installation of a new radar mast, calorifier units and modifications to the bridge.

Arklow Marine Services carried out the work while the vessel was berthed in the port along Sir John Rogersons Quay.

The 2,625 tonnes buoy-handling vessel is expected to return to her homeport of Dun Laoghaire Harbour tonight.

 

Published in Lighthouses
Page 1 of 2

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023