Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: BG Freight Line

UK port operator Peel Ports Group which includes Clydeport has won the 'Green Champion' award at the 25th annual Glasgow Business Awards.

Announced at last week's gala ceremony on October 5th, hosted by the Glasgow Chamber of Commerce and attended by over 650 esteemed business figures, the Green Champion award celebrates businesses with a dedication to driving forward green initiatives.

Peel Ports Clydeport faced stiff competition within the category, nominated alongside Glasgow Caledonian University, Kabloom, Lead Powerful Impact and Scottish Sports Futures.

Clydeport’s win comes as recognition of its outstanding investment in sustainability and its industry leading mission to become a net-zero port operator by 2040, five years ahead of the Scottish government’s national decarbonisation targets.

Key developments made to reduce carbon emissions across the Clydeport operation include a £17million investment in installing two state-of-the-art electric cranes at Greenock Ocean Terminal (see photo caption), as well as changing lighting across all sites to LED.

The network of ports has also invested heavily in upgrading its equipment fleet to run on low emission alternatives to fossil fuels, with 88% of its fleet now running on Hydrogenated Vegetable Oil (HVO) and 90% on electric power.

David Wilson, deputy port director at Peel Ports Clydeport said: “We are ecstatic to be recognised for our efforts to dramatically reduce carbon emissions across our sites.

“Investment in sustainability has been key to future proofing our business, ensuring we can continue to offer innovative and cost-effective solutions that will stand the test of time.

“This award represents the dedication and focus of everyone at Clydeport, from senior management to those with boots on the ground, to delivering greener services across all our sites.”

Earlier this month the port operator announced it has significantly reduced its greenhouse gas emissions across its port facilities, cutting these by almost a third since 2020.

The reduction was announced in the group’s new 51-page ESG report - one of the most detailed reports of its kind to be produced by any UK port operator of similar size (see related Liverpool story)

The independently verified figures confirm the group has reduced Scope 1 & Scope 2 emissions across its port operations by a total of 32 per cent, against its 2020 baseline and using a market-based accounting approach.

The cluster of ports was also nominated for the Sustainable Development award on the night, recognising its capabilities to create value through innovative sustainability practices.

Clydeport’s potential to facilitate renewable energy developments was recognised earlier this year when its Hunterston Port and Resource Campus (PARC) was one of 18 sites to be granted national development status under the Scottish government’s National Planning Framework 4 (NPF4), designating it as a strategically important site with a key role in supporting the delivery of Scotland’s national development strategy and transition to net-zero by 2045. The designation has set in motion the redevelopment of the site, allowing for a slew of new renewable energy developments to come onstream.

Published in Ports & Shipping

Value Maritime is to have ship emissions-reducing Filtree Systems, including the Clean Loop 30% carbon capture systems, installed on a quartet of BG Freight Line newbuild container vessels.

Purus Marine and Nordic Hamburg have placed the order with Value Maritime. The contract is a milestone as this represents the first time the company’s revolutionary product has been ordered for installation on newbuild containerships.

The 12.5 MW systems will be delivered between September 2023 and February 2024 and will be installed at Value Maritime’s Dutch berth at the Port of Rotterdam.

The newbuild container vessels of BG Freight Line (which runs feeder services to Ireland, the UK and mainland Europe) follows a previous order in early 2022, when two Filtree Systems with carbon capture involved the containerships BG Onyx and BG Ruby.

Cleaning air and water

The Filtree System is based on innovative technology that filters sulphur, CO2 and 99% of ultra-fine particulate matter from vessels’ exhaust streams. This will enable BG Freight Line to significantly reduce emissions while continuing to sail on high sulphur fuel that is both more cost-efficient and helps to reduce maintenance requirements. In this manner, the Filtree System offers a quick return on investment.

With the Clean Loop mechanism, the system is also able to filter oil residues and particulate matter from its own washing water, giving the water a neutral pH value, which contributes to reducing acidification of seas and rivers.

Carbon circle

The Filtree Systems that will be installed on the newbuild container vessels will additionally feature a modular CO2 capture and storage system. This innovative technology captures CO2 from exhaust emissions and uses it to charge a “CO2 battery,” where it is stored and transported to shore. On shore, the CO2 is discharged for use, for example, in the agricultural industry, after which the battery is returned to the vessel to be recharged, thus representing a 100% circular solution.

Plug and play

The Filtree is a plug and play system. The nature of its design has ensured its straightforward retrofitting. This current order suggests a significant shift is taking place in the maritime industry, with more and more companies considering ways to reduce their emissions.

Laurens Visser, Container Vessels Specialist at Value Maritime: “We are pleased to receive this order, our first for Filtree systems to be installed on newbuild container vessels. This signifies the changes that are presently taking place in decision-making within the industry. Cleaner, more sustainable shipping has risen on the agenda of many maritime companies over the past years. We are now seeing companies proactively looking to reduce their emissions not only retrospectively but from the very outset of operations. This is a welcome development that shows the seriousness with which the industry is taking up the challenges of climate change and the energy transition.”

Published in Ports & Shipping

One of the UK’s largest port operators, Peel Ports Group which among its facilities includes a container terminal in Dublin Port, has announced major changes to its senior leadership team which is to take effect from 4 April 2022.

Having grown on average by 10% year-on-year for the last decade, and with over £1.2 billion being invested into its operations over the same period, the group’s announcement reinforces its ambition to future-proof the business whilst delivering the next phase of its long-term strategy.

⦁ Chairman Tom Allison is standing down but will remain on the board representing shareholder interests of Peel Group as a non-executive director.
⦁ Mark Whitworth will stand down as Chief Executive Officer but will assume the role of Chairman, overseeing the strategic development and governance of the group.
⦁ Claudio Veritiero will take over as new CEO as the group readies to commence a new investment programme across its primary assets

Mark Whitworth said: “For more than a decade we have consistently been at the forefront of the UK ports industry for the delivery of growth and investment. This has been a transformational period for the business and one that has enabled the group to create thousands of high value jobs within our existing and new facilities.”

“Given that stability in the company leadership has been a cornerstone of our success, the changes we are announcing today have been two years in the planning to ensure a smooth transition.”

“We have ambitious plans to maintain the growth trajectory, which in turn will continue to create positive results not only for our company, but also for the regions and communities we operate within, for many years to come.”

“The time is right for change and Claudio will be integral to making that change happen as he leads the business into an exciting new era.”

Mark Whitworth joined Peel Ports as Chief Executive in 2010 and over his tenure has led major transformations across the business, including the concept and launch of Liverpool2, a £400 million deep water container terminal, the £100m development of a custom-built biomass import terminal for Drax Group plc and the ongoing regeneration of major hubs such as Hunterston PARC and the Inchgreen Dry Dock in Scotland.

Significant acquisitions including the Port of Great Yarmouth and Quality Freight (now known as Peel Ports Logistics) are also included in Mark’s successful portfolio, all contributing to three-fold growth in profitability from when he joined the business.

Speaking about Tom Allison’s retirement as chairman, Mark added: “Tom has been an outstanding mentor throughout his time with our group and has overseen an unprecedented period of success. His business acumen and strategic counsel have been critical over the last 25 years and we are privileged to have him continuing to support the company as a non-executive director.”

Tom Allison was appointed Chief Executive of Clydeport PLC in 1997 and subsequently led the creation of Peel Ports Group in 2003. He then combined the role of CEO and Chairman, overseeing the acquisition of Mersey Docks and Harbour Company in 2005.

Claudio Veritiero joined Peel Ports in 2021 with over 25 years of experience working in the infrastructure, logistics, property development and financing markets. He was previously Chief Operating Officer of Kier Group Plc and has held roles as Chief Operating Officer of Speedy Hire and in the investment banking advisory division of Rothschild & Co.

Claudio said: “Since joining Peel Ports a year ago, I’ve been taken by the calibre of our people, our operations and our customer relationships. I’m delighted to be taking on the role of CEO and will look to build on the unprecedented success that Mark has led over 12 years. One of my priorities will be to take stock of the changing needs of our customers and the port communities in which we operate so that we can further enhance our offering and customer experience.”

“Ports are a vital catalyst for the whole economy, not just the supply chain, with a crucial role to play in creating jobs and enabling economic regeneration. I look forward to working closely with the leadership teams across the business, our customers and our commercial and community partners, as we deliver the next phase of our growth journey.”

Latest Department for Transport data confirms Peel Ports to be one of the fastest growing port groups in the UK, already handling 70 million tonnes of cargo per year and with 15% of the UK’s total port traffic traveling through its waters.

Peel Ports’ key facilities include Port of Liverpool, Manchester Ship Canal, Heysham Port, Clydeport, Great Yarmouth, London Medway and in Dublin Port, the Marine Terminals Ltd container terminal. (Afloat adds the MTL facility is located on the south quays, see photo above).

The ports group also owns BG Freight, the short-sea shipping operator that offers a range of freight and logistics services through Peel Ports Logistics. The group has seen significant growth, averaging 10% year on year across the last 10 years and outlaying over £1.2bn into projects over the same period.

Published in Ports & Shipping

Container operator BG Freight Line has taken a positive step by adding an additional weekly service call to meet the growing demands of traffic between Liverpool and the Irish Sea hub.

The newly announced service will call between Liverpool and Dublin Port on a tri-weekly basis, ensuring a regular facility to the meet the dynamic needs of each customer in the fast-paced environment of short-sea shipping.

BG Freight Line, part of the Peel Ports Group, provides a comprehensive range of logistics services to and from Ireland, the UK and continental Europe. These services include door-to-door shipping, feedering and quay-to-quay shipping for all types of containerised cargo.

Koert Luitwieler, CEO, BG Freight Line, said: “Our sailing schedule is amongst the best in the business and as part of the Peel Ports Group, we are able to offer the assurance to our customers that we are both an established and reliable partner.

“We are always looking for new growth opportunities and adding another service to the Dublin – Liverpool route will strengthen our excellent Irish Sea network even further. The extra call in Liverpool allows us to meet the demands of our customer, giving them greater flexibility to move last minute cargo closer to its end destination in an ever-changing landscape”.

David Huck, Managing Director, Peel Ports said: “We are delighted to welcome this extra weekly service as it reinforces the strategic importance of this route, as well as our ambition and commitment to provide the seamless movement of goods between Dublin and Liverpool.

“During these uncertain times, it’s imperative that we remain agile for our customers and remain customer-focussed to find a fast solution that ensures cargo, especially essential supplies reaches its destination on time”.

The Port of Liverpool is ideally positioned to be at the heart of a distribution network for UK and Irish markets. The Port is adept at offering innovative and sustainable solutions for warehousing, manufacturing and retail industries, connecting the UK’s major conurbations to both the Irish Sea Hub and beyond.

Published in Dublin Port

A shipping line based in the Netherlands, reports The Irish Times, will open up Waterford port to new international trade routes when it commences a weekly service on the Waterford to Rotterdam route which will act as a deep-sea feeder for Irish importers and exporters.

The Dutch operator BG Freight Line, in partnership with global shipping giant Maersk, is to commence the service on July 6th to support industry in the southeast. Effectively the move will allow goods travelling from Waterford to continue through Rotterdam to other ports such as Shanghai, whereas previously goods for destinations beyond Europe would typically have shipped from Dublin.

Part of the Peel Ports Group, BG Freight Line runs a fleet of 23 containerised vessels from its headquarters in the Netherlands. Maersk, meanwhile, is the largest container logistics organisation in the world, moving more than 12 million containers a year.

BG Freight Line chief executive Koert Luitwieler said the addition of Waterford to its network would strengthen the company’s Irish Sea network which encompassed routes from Dublin and Cork at present.

For more on this new additional Ireland-mainland Europe lo-lo service click here 

Published in Ports & Shipping

#IrelandMax - Containerships currently under construction in China of the 'Ireland' Max class for BG Freight Line, a subsidiary of the Peel Ports Group in the UK are due to enter service next year, writes Jehan Ashmore.

BG Diamond is the first of a quartet of named ships as identified by Afloat earlier this year that is to operate on their short-sea hub feeder services linking Ireland, the UK, Belgium and the Netherlands. 

Newbuild BG Diamond will along with sisterships be hired under long-term charter to the Dutch owned subsidiary. The other sisterships each with a 1004TEU capacity are the BG Emerald, BG Sapphire and BG Jade which was only christened last month at the Zhoushan Changhong International Shipyard.

As previously reported a new weekly container service between Liverpool and Cork has begun and this marked the first time the two ports have been connected directly through lo-lo operations. At the end of the each week, the current containerships on this route also offer services between Belfast, Greenock and Liverpool.

At the time of the route's announcement the ships to operate the service were Thea II (see TV presenter Paxman's Boxboat) along with RMS Veritas. However, from 2018, BG Freight will take delivery of the 'Ireland' Max quartet containerships on the short-sea feeder services of the company’s Irish Sea hub operations. 

Each newbuild of around 11,000 gross tonnage will have 'green' credentials and built to DNV GL standards and will be fitted with state-of-the-art features in order to comply with Emission Control Area (ECA) requirements. In addition to adhereing to BG Freight Line’s navigation and trading needs.

'Ireland' Max class containerships have been developed by BG Freight Line, in conjunction with designers CIMC ORIC and Arkon Shipping. 

Basic specifications of the new 'Ireland' Max containerships:

Containers: 1004 TEU (alternative 488 units 45ft)
Deadweight: 13,250 tonnes (on 8.0m draft)
Length overall: 153m
Reefer plugs: 253
Service Speed: 16 knots
Exhaust cleaning by WET-scrubber

 

Published in Ports & Shipping

#NewContainerships - Container operator, BG Freight Line, a subsidiary of UK based Peel Ports Group, is to receive new tailor-made short-sea 'feeder' containerships optimised for the company’s Irish Sea Hub services.

The new class of ‘green’ vessels has been developed by BG Freight Line operation with ARKON Shipping as project initiator/commercial manager, technical managers Jüngerhans Maritime Services, and designers CIMC ORIC.

BG Freight Line will take delivery of four sister vessels under long-term charter after delivery from Zhoushan Changhong International Shipyard, with them expected to enter service during 2018.

The vessels will be built to DNV GL standards and will be fitted with state-of-the-art features in order to comply with Emission Control Area (ECA) requirements and BG Freight Line’s navigation and trading needs.

They will be fitted with a modern wet scrubber system for exhaust cleaning in order to fulfil the requirements for trading within the ECA area. The vessels are also fully fitted for the loading of 45ft short-sea containers in all positions, with room in total for 488 units.

Additionally, a various number of odd-sized containers can be stowed fast and securely due to a new proprietary and innovative cargo stowage system. To minimise operational cost the vessel will be fitted with a modern two-stroke main engine with very low fuel consumption.

All parameters of the vessels have been optimised for the trade between the North Continent, Ireland and the UK.

Koert Luitwieler, Shipping Director at BG Freight Line said: “As well as helping us, and our customers, to reduce their carbon emissions and costs, these custom vessels have a number of innovations to help keep us at the forefront of feeder services in the Irish Sea. We are looking forward to seeing them in service very soon.”

Ole Gabs, Director of ARKON Shipping said: “We are proud to have developed and managed this project under the current difficult shipping market conditions. We believe that the future for vessel design and construction is to have close partnerships between owners and charterers, especially where there is as ambition to meet the highest environmental standards.”

New 'Ireland' Max Ship Specifications

Container capacity: 1004 TEU, alternative 488 units 45ft

Deadweight: 13,250 tonnes on 8.0m draft

Length overall: 153m

Reefer plugs: 253

Service Speed: 16 knots

Exhaust cleaning by WET-scrubber

Published in Ports & Shipping

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023