Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: Harland & Wolff

Scilly Ferries, a division of Harland & Wolff Group, is a new ferry operator that was due to start running in May between the Isles of Scilly and Penzance, Cornwall, but has been delayed.

The shipbuilder group announced on Friday that the new fast ferry, which is to be renamed Atlantic Wolff, has been chartered for its 90-minute service between the archipelago and mainland England and will not run until early June.

H&W’s Group’s chief executive officer, John Wood, apologized to customers who had made reservations with the operator to be marketed as Scilly Ferries, with sailings to start in May.

The CEO said the new (passenger-only) ferry Atlantic Wolff, would depart Spain for the UK in the coming days and would then need to go through a regulatory process.

He added that the process the 42-metre ferry had to go through before it could run was "significant and important," and the timescale was "a little out of our gift.".

BBC News has more on the delay of the new operator on the service off south-west England, from where Afloat adds it will operate sailings up to twice a day to and from St Mary’s, the largest of the five inhabited islands.

This week, Afloat identified the high-speed aluminium catamaran as the former Aquabus Jet 1, which departed Vilvanova, near Barcelona, on the western Mediterranean. The Damen-built 4212 design fast-ferry flagged in Tuvalu, yesterday called en route to Algeciras, has transited the Strait of Gibraltar and this morning is off Portugal, bound for Lisbon, with a final UK destination in Portsmouth.

Aside from the delayed start to the summer season, according to the Scilly Ferries website, they anticipate running the (catamaran-based) service as late into the autumn as the weather allows.

Its rival is the Isles of Scilly Steamship Group, whose origins date to 1920, operate the 2-hour, 45-minute island lifeline and popular tourist route using an aging ferry, Scillonian III, which is to be replaced by a newbuild along with a freighter.

Published in Ferry

Shipyard group Harland & Wolff has welcomed the announcement by the Scottish Offshore Wind Energy Council (SOWEC) regarding the company’s plans to transform its Arnish and Methil facilities into leading hubs for renewable infrastructure.

Proposals for Harland & Wolff’s Scottish sites have advanced to the second stage of SOWEC’s Strategic Investment Model (SIM). SOWEC, a partnership between the Scottish public sector and the offshore wind industry, aims through its SIM process to deliver the significant upgrades required for Scotland’s offshore wind developments.

Support through the SOWEC SIM would significantly enhance Harland’s & Wolff’s ability to service and maintain the burgeoning renewable energy sector through both its Scottish sites, with the investment transforming Arnish and Methil into state-of-the-art centres for the fabrication and assembly of turbines and other structures for the industry.

Investment allocated to Methil would greatly expand its capacity to build fixed and floating offshore foundations, capitalising on its status as one the most geographically advantageous areas to support Scotland’s offshore wind developments. Through investment of around £172 million and improvements such as a quay extension, the site would have the ability to construct approximately 750MW of installed capacity each installation season and enable Harland & Wolff to take on large-scale renewable projects.

Harland & Wolff submitted its application in partnership with Stornoway Port to enable the development of the Stornoway Offshore Wind Hub.

£99 million of investment would allow for the creation of a new quay and floating dry dock, increasing the site’s construction capacity to 255MW of installed capacity per installation season. The upgraded port at Stornoway would boast a laydown area of over 10 hectares, providing ample space for the assembly and storage of renewable energy components.

By increasing the capacity and capabilities of the Methil and Arnish sites, Harland & Wolff is positioning itself as a key player in the development of sustainable energy solutions for Scotland and beyond. At present more than 12 offshore wind developers have been engaged in discussions around the projects.

The proposed £270 million investment would have a profound impact on the local communities, creating numerous direct and indirect job opportunities. The project at Methil would result in an additional 400 jobs, with a minimum of 200 roles expected for the project at Arnish including an apprenticeship and graduate programme for around 30 people. Harland & Wolff will work closely with local suppliers and educational institutions to ensure that the benefits of any investment are felt throughout the Methil and Arnish communities.

Scotland has set ambitious renewable energy targets, and Harland & Wolff’s enhanced facilities would enable the construction and maintenance of cutting-edge renewable energy infrastructure, contributing to Scotland’s reputation as a global leader in green energy.

John Wood, CEO of Harland & Wolff, said: “The seas around Scotland are a rich resource for renewable energy and we feel the proposed investments into our sites would best maximise this opportunity and support growth in this increasingly vital sector. The plans we have submitted to SOWEC are indicative of our ambitious plans for Arnish and Methil and our desire to make Harland & Wolff a leading player in the renewables industry.

“With the investment outlined for Methil, we hope to build upon Energy Park Fife’s reputation as a offshore wind hub, whilst funding for Arnish is focused on providing critical capacity for projects on Scotland’s west coast. In each of their own way, proposals for both sites aim to greatly enhance Harland & Wolff’s manufacturing facilities to best ensure a quality service for our offshore wind clients.

“Our proposals would support the creation of hundreds of jobs and we are committed to nurturing a skilled workforce that will both contribute to local economies and reinforce Scotland’s reputation as a global leader in sustainable infrastructure.”

Humza Yousaf, First Minister of Scotland, who recently visited Harland & Wolff’s Arnish site said: “It was a pleasure to join Alasdair Allan MSP and Cllr Susan Thomson at Arnish and meet the brilliant team earlier this month. There is clearly a wealth of important work taking place and it was fantastic to see the opportunities that Arnish is offering to local people – including through its apprenticeship programme.

“Harland & Wolff’s ability to service and maintain the renewable energy sector through both of its Scottish sites was clear to see and I look forward to hearing more about the continued progress in Arnish and Methil throughout the ongoing SOWEC process.”

Published in Power From the Sea

The south-west England operator running between Cornwall and the Isles of Scilly has “unequivocally rejected” a takeover bid from the Belfast based shipbuilder Harland and Wolff (H&W), reports Business Live.

Bosses at the Isles of Scilly Steamship Group (ISSG), which runs the passenger ferry Scillonian III and two freight vessels, said the approach from the H&W group which in 2020 acquired Devon’s Appledore shipyard, was not in the best interests of shareholders.

In August as Afloat reported, H&W outlined a plan to build new vessels, a passenger ferry, cargo-ship and an inter-island vessel in order to launch its own service on the 37 nautical mile route of Penzance Harbour-St. Mary’s, the largest of the Isles of Scilly.

The Aim-listed firm had previously said it was seeking an operating licence and would work with local councils to apply for ‘Levelling Up’ funding amounting of £48m, in which the UK Government has already allocated for the construction of newbuilds to serve the route.

On Friday (24 Nov.) the board of H&W said it was “disappointed” that an indicative and preliminary cash offer for the entire share capital of the ISSG had been rebuffed. H&W added that they would “consider their options”. At this stage, H&W now has until 21 December, to formally announce whether or not it has a firm intention to make an offer for the Penzance based ISSG, in accordance with the Takeover Code.

The origins of the ISSG can be traced to 1920 when the Isles of Scilly Steamship was established, and the Group continues to be the only operator of passenger and freight services along the route. In April, ISSG announced it had secured a £33.6m loan from private asset finance provider Lombard to fund its own plans for a new 600 passenger ferry and two new freight vessels, to be built by a French shipbuilder’s facility overseas and scheduled for delivery by March 2026.

Published in Shipyards

Shipbuilder, Harland & Wolff Group Holdings is in the running to build and operate two new ferries to serve the remote Isles of Scilly, 24 nautical miles off Cornwall in south-west England.

The shipbuilding group which has facilities on both sides of the Irish Sea, is reaching the conclusion of a full technical, operational and financial business case on the newbuild ferries on the Penzance Harbour-Hugh Town, St. Mary’s route.

According to The Irish News, H&W will join partners, including local councils, to make an application for the UK government's levelling up funding. In addition, to seeking a licence to operate the two vessels on the 37 nautical mile route and be based initially over a five-year period.

Harland & Wolff however, warns that "there is no certainty at this point that this opportunity will proceed to financial close".

In the event that if H&W’s project proceeds, it is not known whether any of the workload for the newbuilds, would be carried out at the shipbuilder group’s main Belfast shipyard.

More on the story here and as BBC News reported, H&W's proposal would put it in competition with the established Isles of Scilly Steamship Company which celebrated its centenary in 2020.

The shipyard at Queens Island, Afloat adds is one of Harland & Wolff’s four facilities. Two are located in Scotland and the fourth in England, at Appledore, Devon is where the current Scilly ferry, Scillonian III was built in 1977.

In recent years, the shipyard in 2019 was acquired by Infrastrata, owners of H&W and the facility with 300 years of shipbuilding was renamed Harland & Wolff (Appledore).

Published in Shipyards

The UK Prime Minister Rishi Sunak will visit Belfast this Thursday evening to mark the return of naval ship building in Northern Ireland, Downing Street has announced.

Last month it was confirmed that Harland & Wolff Group as part of the Team Resolute bid was awarded a £1.6bn Ministry of Defence (MoD) contract to develop and build the next generation of Fleet Solid Support Ships for the Royal Fleet Auxiliary (RFA). .

The RFA newbuild trio will provide global logistics and operational support to the Royal Navy. In addition the role of these replenishment vessels will include the essential QE aircraft carrier-led Maritime Strike Group when on deployment.

The Prime Minister's two day visit to NI, is expected to highlight “the UK-wide nature of the project” and that it “demonstrates how intertwined Northern Ireland’s economy is with the rest of the UK.”

The visit of Mr Sunak represents the first official visit to Northern Ireland since he took office in October.

More from Belfast Telegraph of the PM's visit that will emphasise in the boosting of the UK’s naval shipbuilding capabilities for the future and secure job creation at the famous H&W shipyard. 

Published in Shipyards

The UK quoted company, InfraStrata plc which focuses on strategic infrastructure projects and physical asset lifecycle management, is pleased to announce it has applied to Companies House to trade under the name Harland & Wolff Group Holdings plc.

The parent company has over the past 18 months, proceeded through various phases which have included, the acquisition of assets, significant upgrades to all its facilities, the introduction of state-of-the-art technology. While simultaneously establishing a substantial sales pipeline which now stands at £7.8bn (on an unweighted) and £1.8bn (on a weighted).

The company is now at its final stage of full reactivation (incl. apprenticeships) of all its yards, which involves building a multi-year backlog for its facilities across its five key markets: defence, cruise and ferry, commercial, renewables and energy. The company believes that this change of name will better reflect its ambition in expanding its core business and the significant development of its shipbuilding and fabrication activities.

The organisation’s flagship Islandmagee gas storage project will retain its name, with management remaining focused on obtaining the Marine Construction Licence and Final Investment Decision (FID) thereafter. Whilst the project now has substantially more life expectancy with the need for major volumes of hydrogen storage (subject to regulatory approvals) it is a relatively straightforward technical change to make in a phased approach as the project transitions from gas to hydrogen over time.

Trading in the company's shares on the AIM market of the London Stock Exchange under the new name of Harland & Wolff Group Holdings plc is expected to take effect as soon as a new stock ticker name has been issued by the AIM team.

An application for the stock ticker “HARL” has been made and will be confirmed as soon as the company’s name has been formally changed at Companies House. A further announcement will be made as soon as regulatory permissions have been secured and the new Company stock ticker has been issued.

In order to reflect the change of name, the company's corporate website will change to www.harland-wolff.com. The information required pursuant to AIM Rule 26 will be available at this address.

John Wood, CEO of InfraStrata plc commented: “We are delighted to make this announcement today, signalling the end of upgrade and reactivation phases. With the new national shipbuilding strategy due to be released in the autumn and the government’s ten point plan for a Green Industrial Revolution, we have confidence that the shipbuilding and fabrication business will deliver substantial value to all our stakeholders as we enter this exciting new stage of building our multiyear backlog of projects.

Since acquiring Harland & Wolff in December 2019, we have seen the organisation grow significantly; in August 2020 we reopened what is now known as Harland & Wolff (Appledore) and in February 2021, we acquired two ex-BiFab sites based in Scotland - now renamed Harland & Wolff (Arnish) and Harland & Wolff (Methil) respectively giving us one of the largest fabrication footprints dedicated to our core markets, in addition to two of the largest drydocks in Europe at Harland & Wolff (Belfast) which at 80% capacity could give sales of in excess of £500m per annum when operational efficiencies have been achieved.

This is a natural progression in building and further developing the Harland & Wolff brand, our commitments to high-quality jobs across our five markets including the 34 apprenticeships recently announced as well as providing socio-economic investment into local, regional, and national communities.”

Published in Shipyards

Parent company of Harland & Wolff, InfraStrata plc, is delighted to announce that former First Sea Lord & Chief of Naval Staff of the Royal Navy, Sir Jonathon Band, will be joining its Board of Directors.

Sir Jonathon is expected to formally join the Board by the end of August 2021.

Sir Jonathon Band is a former First Sea Lord & Chief of Naval Staff of the Royal Navy during which period he created a new innovative Command Structure in addition to promoting the need for maritime investment and security. Sir Jonathon has also worked very closely with the industry to promote and implement the Defence Industrial Strategy, a UK government policy focused on the efficient allocation of military equipment and resources to the UK armed forces.

Prior to his role as First Sea Lord, Sir Jonathon served as Commander in Chief Fleet during which time, as Chief Operating Officer, he was responsible for the operational capability and deployment of the Navy’s front line. Sir Jonathon is highly respected for his time spent in supporting foreign and defence policies and for his crucial role in negotiating and building coalitions across NATO allies and Middle Eastern partners.

Following his retirement from the Royal Navy, Sir Jonathon has held numerous non-executive positions at Lockheed Martin UK, Babcock International Group, National Museum of the Royal Navy and Survitec Group Ltd.

Sir Jonathon is currently a Non-Executive Director of Carnival Corporation, the NYSE & LSE listed global cruise operator.

Clive Richardson, Chairman of InfraStrata plc, commented: “I am very pleased that Sir Jonathon has agreed to join the InfraStrata board. With this appointment, the Board of InfraStrata will now consist of three non-executive directors and two executive directors, each one with significant experience in our key growth sectors. Sir Jonathon brings with him several decades of experience in the defence and wider marine markets. I look forward to working very closely with Sir Jonathon and for him to become an integral part of our Board as we move the business forward.”

Harland & Wolff is a multisite fabrication company, operating in the maritime and offshore industry through five sectors: commercial, cruise and ferry, defence, oil & gas and renewables and six services: technical services, fabrication and construction, decommissioning, repair and maintenance, in-service support and conversion.

Its Belfast yard is one of Europe’s largest heavy engineering facilities, with deep water access, two of Europe’s largest drydocks, ample quayside and vast fabrication halls. As a result of the acquisition of Harland & Wolff (Appledore) in August 2020, the company has been able to capitalise on opportunities at both ends of the ship-repair and shipbuilding markets where this will be significant demand.

In February 2021, the company acquired the assets of two Scottish based yards along the east and west coasts. Now known as Harland & Wolff (Methil) and Harland & Wolff (Arnish), these facilities will focus on fabrication work within the renewable, oil and gas and defence sectors.

Harland & Wolff is a wholly-owned subsidiary of InfraStrata plc (AIM: INFA), a London Stock Exchange-listed firm focused on strategic infrastructure projects and physical asset life-cycle management.

In addition to Harland & Wolff, it owns the Islandmagee gas storage project, which is expected to provide 25% of the UK’s natural gas storage capacity and to benefit the Northern Irish economy as a whole when completed.

Published in Shipyards
Tagged under

Harland & Wolff, the iconic shipyard on Belfast Lough with over 160 years of maritime and offshore engineering pedigree, welcomed The Prince of Wales on 18 May 2021 to mark its 160th anniversary.

Arriving at Harland & Wolff (Belfast), His Royal Highness toured the yard, met with workers and signed the company Visitors’ Book. During this ceremony, The Prince was then presented with a framed photo of his late father, The Duke of Edinburgh, on a visit to the shipyard in 1977 along with an original copy of the ‘H&W News’ which featured The Duke of Edinburgh’s visit.

The Prince finished the visit by unveiling a celebratory plaque marking the 160th anniversary of Harland & Wolff.

Addressing staff, The Prince commented:

“I’m so pleased to hear that there is all sorts of potential new activity here and new fabrication opportunities, that could be really encouraging, and I hope you could encourage a lot more of the young to become apprentices and understand the importance of manufacturing and to also understand how this country has led the way in so many of these areas.”

“We owe all of you an enormous debt of gratitude for your skills and ingenuity, which are so remarkable. Well done all of you and thank you for all the hard work you put in.”

Founded on April 11 1861 by Sir Edward James Harland and Gustav Wilhelm Wolff, Harland & Wolff’s heritage includes work on some of the most iconic ships, including the famous RMS Titanic, RMS Olympic and HMHS Britannic, right through to the SS Canberra for P&O and the Myrina tanker – the first supertanker built in the UK.

John Wood, Group CEO commented: “It has been a pleasure to welcome His Royal Highness onto site to commemorate our 160th anniversary. As one of the most iconic names in shipbuilding, this visit marks an incredible moment in our history. We have a great past, and now we’re proud to be building a great future. Through our newly launched apprenticeship scheme, we will continue to pass on those skills and traditions and in doing so, put British shipbuilding back on the map. This is no mean feat but as one team, we will return Harland & Wolff to its former glory.”

Harland & Wolff is a multisite fabrication company, operating in the maritime and offshore industry. Its Belfast yard is one of Europe’s largest heavy engineering facilities, with deep water access, two of Europe’s largest drydocks, ample quayside and vast fabrication halls. As a result of the acquisition of Harland & Wolff (Appledore) in August 2020, the company has been able to capitalise on opportunities at both ends of the ship-repair and shipbuilding markets where this will be significant demand.

In February 2021, the company acquired the assets of two Scottish based yards along the east and west coasts. Now known as Harland & Wolff (Methil) and Harland & Wolff (Arnish), these facilities will focus on fabrication work within the renewable, oil and gas and defence sectors.

In addition to Harland & Wolff, it owns the Islandmagee gas storage project, which is expected to provide 25% of the UK’s natural gas storage capacity and to benefit the Northern Irish economy as a whole when completed.

Published in Shipyards
Tagged under

Harland & Wolff, the iconic shipyard with over 160 years of maritime and offshore engineering pedigree has announced it has been awarded a contract by Saipem Limited for the fabrication and load-out of eight wind turbine generator (WTG) jacket foundations.

The jacket foundations will service the EDF Renewables and ESB owned Neart na Gaoithe Offshore Wind Farm project located in the outer Firth of Forth in Scotland. The contract schedule is due to commence from 1 July 2021 and is anticipated to create around 290 direct and indirect jobs.

The works for fabrication, consolidation and load-out of the eight WTG jacket foundations will principally be conducted at Harland and Wolff’s newly acquired Methil facilities in Scotland. Should there be an opportunity to further optimise the works programme and make the contract more cost-effective, Harland & Wolff and Saipem will work jointly to spread additional workstreams within the contract across its three other sites in Belfast, Arnish and Appledore.

With its unrivalled UK fabrication facilities, Harland & Wolff’s multi-site approach can reduced fabrication timelines by as much as 30% - offering project developers a faster route to project monetisation and de-risking fabrication projects by spreading work across three distinct but close-proximity geographies.

Harland & Wolff’s four sites offer a combined footprint of over 334.6 hectares, with well over 72,000m² of undercover fabrication capacity. Belfast comprises two of the largest drydocks in the UK, second largest in Europe, each at 356 metres and 556 metres in length whilst Arnish boasts the largest fabrication hall in Europe. Both the Arnish and Methil sites offer 580,000m² of total site area and 24,000 tonnes of quayside load-out capabilities, boasting an annual throughput tonnage estimated at over 100,000 tonnes.

John Wood, CEO of InfraStrata, commented: “We are delighted to have entered into this contract with Saipem and I believe that this contract paves the way for the execution and delivery of future fabrication contracts, a significant number of which are currently in advanced negotiations.

The geographical proximity of our Methil facility to the North Sea makes it an ideal site for fabrication and load-out to wind farm projects such as this. More importantly, it validates our strategic vision of expanding the Group’s fabrication footprint into regions that are strategically located within proximity to major wind farm projects. This will enable us to spread workstreams across our facilities to drive down costs, deliver against tight schedules and, crucially, align ourselves to the government’s goal of providing wind generated power to all homes in the UK by 2030.

I am confident that this is only the beginning of a stream of projects in our pipeline that we expect to come to fruition. We are hugely excited about the massive potential that this first contract has unlocked, and we look forward to working with Saipem to successfully deliver under it.”

Harland & Wolff is a wholly-owned subsidiary of InfraStrata plc (AIM: INFA), a London Stock Exchange-listed firm focused on strategic infrastructure projects and physical asset life-cycle management.

Harland & Wolff is a multisite fabrication company, operating in the maritime and offshore industry. Its Belfast yard is one of Europe’s largest heavy engineering facilities, with deep water access, two of Europe’s largest drydocks, ample quayside and vast fabrication halls. As a result of the acquisition of Harland & Wolff (Appledore) in August 2020, the company has been able to capitalise on opportunities at both ends of the ship-repair and shipbuilding markets where this will be significant demand.

In addition to Harland & Wolff, it owns the Islandmagee gas storage project, which is expected to provide 25% of the UK’s natural gas storage capacity and to benefit the Northern Irish economy as a whole when completed.

Published in Shipyards
Tagged under

Harland & Wolff, the national strategic asset, with four leading shipyards and fabrication facilities based in Belfast, Appledore, and Scotland is proud to be celebrating its 160th anniversary.

Founded on April 11 1861 by Sir Edward James Harland and Gustav Wilhelm Wolff, its heritage includes work on some of the most iconic ships, including the famous RMS Titanic, RMS Olympic and HMHS Britannic, right through to the SS Canberra for P&O and the Myrina tanker – the first supertanker built in the UK.

John Wood, Group CEO commented: “It is a great privilege to celebrate 160 years of Harland & Wolff. It is a brand that is steeped in history and is now going through a pivotal change that will see it industry-leading once again.

We have already started to invest in all our facilities, from Wilma the robotic welder in Belfast to the complete restoration of the Appledore dock gates. As technology advances, we are keen to adopt new and better ways of doing things across all of our facilities to ensure we are internationally competitive.

As we recruit the next generation of shipbuilder and fabricators through our apprenticeship scheme, you will not just see ships being built under Samson and Goliath, you’ll see work from across all our five markets from wind farm jackets to bridges, and warships.”

Pioneering twenty-first century offshore and maritime engineering, Harland & Wolff operates throughout five markets, offering six key services. Its Belfast yard is one of Europe’s largest heavy engineering facilities, with deep water access, two of Europe’s largest drydocks, ample quayside and vast fabrication halls. As a result of the acquisition of Harland & Wolff (Appledore) in August 2020, the company has been able to capitalise on opportunities at both ends of the ship-repair and shipbuilding markets where there is significant demand.

In February 2021, the company acquired the assets of two Scottish based yards along the east and west coasts. Now known as Harland & Wolff (Methil) and Harland & Wolff (Arnish), these facilities will focus on fabrication work within the renewable, oil and gas and defence sectors.

Harland & Wolff is a wholly-owned subsidiary of InfraStrata plc (AIM: INFA), a London Stock Exchange-listed firm focused on strategic infrastructure projects and physical asset life-cycle management.

In addition to Harland & Wolff, it owns the Islandmagee gas storage project, which is expected to provide 25% of the UK’s natural gas storage capacity and to benefit the Northern Irish economy as a whole when completed.

Published in Shipyards
Page 1 of 7

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023