Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: IOM Steam Packet

Once the new £70m ferry terminal in Liverpool Docks is in operation, it is hoped the Isle of Man Steam Packet can put on a year-round operated service between Douglas and Merseyside.

The Steam packet’s fast-ferry Manannan currently does not take passengers to Merseyside during the winter months. However, the 865 capacity craft did receive some modifications to allow it to berth at the new site when trails took place last month at the Princes’ Half-Tide Dock facility.

In the meantime, the latest business plan of the IOMSP shows it doesn't expect the 1998 built / 200 car capacity fastcraft, will be replaced before 2030.

As ManxRadio reports, there are questions that still hang over as to when the new terminal in the northwest of England port will be in operation, with a number of recent deadlines for opening missed.

A committee was told by the IOMSP’s Managing Director, Brian Thomson on what's expected once the new terminal is ready to welcomes passengers (to listen, click station's audio link).

The MD said that the operation of a high-speed catamaran is perhaps not the best option going forward.

Noting, last week the Packet Company confirmed that the Manannan had been damaged during a very rough crossing from Liverpool to the Isle of Man, for more the radio station also has the story here.

Published in Ferry

The ferry operator, the Isle of Man Steam Packet Company, has confirmed that final 2023 passenger statistics show the highest number of passengers and vehicles carried since 2007, TT’s 100th anniversary.

In 2023, the Company transported 623,037 passengers and 196,430 vehicles. In comparison, in 2007 the Company transported 632,942 passengers and 197,745 vehicles.

The numbers show growth over 2022’s figures which saw the Company’s vessels carrying a total of 595,390 passengers and 192,928 vehicles. The statistics show continued growth in passenger figures post-Covid-19 Pandemic and reflect a positive trend for the Company to build on going forward.

Brian Thomson, Managing Director, commented: "We are delighted to share the Company's 2023 statistics. The high volume of passengers and vehicles carried is a testament to the ongoing commitment to improving services across the Company. In 2023, we refurbished Manannan and brought Manxman into service.

Looking ahead to 2024 we have further improvements currently underway on Manannan including improved children’s play area, a larger retail space and other facilities to improve the passenger experience. We’re also looking forward to bringing the Isle of Man Government’s new Liverpool terminal online. As a Company we’re not resting on our laurels, we’re determined to grow passenger numbers even further."

Published in Ferry

The chairman of the Isle of Man Steam Packet has said a "clear government statement" is needed on whether the firm can sell its current backup ferry.

The Steam Packet outlined plans to sell the 26-year-old ropax Ben-My-Chree in its last annual report, which was published last summer.

At a Tynwald (Manx parliament) select committee on the regulation of the island, a government-owned firm heard that the company's strategy was to retain the ro-ro freight-only MV Arrow as a backup vessel instead because the costs of retaining the Ben-my-Chree were "twice as much.".

The chairman, Lars Ugland, said a year after delivering its report, the company was still waiting for a reply on whether it could sell the Dutch-built ferry that served the main Douglas-Heysham route.

At the same committee, held earlier this month, Treasury Minister Alex Allinson said that the future role of Ben-My-Chree should be considered as part of a review of the company's service contract.

More BBC News reports on the Sea Services Agreement.

Published in Ferry

An agreement has been reached says the Isle of Man Steam Packet, with the union representing its officers, in resolving the issue regarding terms which the ferry operator said they must live aboard the fleet at times.

According to Manx Radio, the company hasn't said what the agreement with the union, Nautilus International is, and whether officers will live aboard at times or not.

The Steam Packet’s Managing Director, Brian Thomson said: "We are pleased that our Officers and Nautilus brought solutions to our negotiations that have enabled us to reach a positive and fair agreement that ensures that we can continue to deliver a high-quality service to our customers."

He added, "We would like to thank our employees for their hard work and dedication during this period. We can now focus on delivering the reliable and quality service that our passengers expect and deserve on board our vessels which are the envy of the Irish Sea."

The Government owned company says the flagship Manxman, introduced last year, was designed for live aboard, and the practice allows for more flexibility and resilience to the sailing schedule.

Union members in December, had objected to the proposals and subsequent industrial action, coupled with poor weather, caused disruption over the busy Christmas and New Year periods.

The radio station has contacted the Steam Packet and Nautilus to find out more about the agreement, following the dispute of recent years.

Published in Ferry

Observed entering Dublin Bay this morning was the Isle of Man Steam Packet’s Manannan, having departed Douglas Harbour, but the fast-ferry was not in service, writes Jehan Ashmore.

The reason for the call by the 98m catamaran craft to Dublin Port was to enable a safety inspection carried out by the Irish Marine Administration (IMA) at the Department of Transport. The examination is to asses the fitness of the fast-ferry to operate to and from Ireland, prior to resuming the seasonal route between these ports, starting in two week's time on 4 April. 

A total of 18 sailings are scheduled for the 2024 timetable, as Afloat previously reported on the crossing taking 2 hours 55 minutes. Facilities of the fastferry include standard seating areas, two cinema lounges, a large bar area at the stern and a cafe, a shop in addition to reserved and premium lounges.

The 1998 built Manannan initially spent some time off the Dublin Bay Buoy before entering the port this afternoon. Likewise of previous such occasions, the fast ferry did not berth at its routine link-span at Dublin Ferryport (Terminal 1) but instead headed upriver to Alexandra Basin (East). It was at the basin's Ocean Pier linkspan where less shipping activity enabled an inspection to be carried out on the fast ferry.

The 865 passenger/200 vehicle capacity fast-ferry will also operate other Irish Sea routes leading up to and during the summer months. This involves the Manx capital’s connection to Belfast and the link to Liverpool; see a related story on the new £70m ferry terminal where a lease agreement has yet to be reached.

In the meantime, Manannan is to remain in Dublin Port until a departure of 18:00.

Published in Dublin Port

The Isle of Man Steam Packet’s fast-ferry Manannan made its first berthing trials on Merseyside’s new £70 million ferry terminal at Liverpool, from where they will connect Douglas.

The 1998 built Manannan, which operates seasonal services, undertook the exercise yesterday as part of the commissioning trial for the Irish Sea’s newest terminal. The trials are to enable major infrastructure marine works to be tested, with the 96m catamaran craft coming alongside the quay and link span.

Berthing trials are necessary as they are a mandatory safety procedure that are required during a project of this type as they enable each of the Steam Packet’s captains to become accustomed to the new berth at all tide levels.

The flagship of the company, Manxman, introduced last August, is to undertake berthing trials too, but the 133m ferry will take place later this year, prior to the start of the winter weekend sailing schedule.

As previously reported, Manxman had carried out 'virtual' berthing at the terminal.

More from Manx Radio on this development for the operator.

Published in Ferry

A Manx Parliament (Tynwald) select committee is looking into the Isle of Man Steam Packet Company, which will involve evidence sessions this month.

The Tynwald reports 3FM, will host the two evidence sessions as the select committee is investigating the sea services agreement and the government's shareholder status with the IOMSPCo.

The ferry company operates a year-round Douglas-Heysham route in addition to three seasonal routes linking Belfast, Dublin, and Liverpool, and where a new terminal is to open. Operating these routes involves two ferries (one in reserve), a fast ferry (seasonal-only), and a freight-only ferry, which is called upon during busy periods and relief duties.

The select committee’s session today is to take evidence from Treasury Minister Alex Allinson, Chief Financial Officer at the Treasury, Caldric Randall, and Interim Executive Officer for Financial Governance, Sarah De-Yoxall.

This morning at 10.30 a.m., the committee will sit in the Legislative Chambers.

Published in Ferry

During this winter the number of cancelled ferry sailings operated by the Isle of Man Steam Packet Company have increased for the third consecutive year.

The new figures for the final there months of last year show that 46 sailings on the Douglas-Heysham route were cancelled which is up 45 percent on the previous year. In that year of 2022, there were 29 cancellations and for the year before there were 26.

The Isle of Man government owned ferry operator- puts the increased disruption last year due to an 'unprecedented number of storms', familiarisation with the newbuild flagship Manxman's handling in extreme weather conditions and ongoing training programmes.

Manxman was introduced onto the Douglas-Heysham route in August last year having replaced Ben-My-Chree which had served the main IOM-England link for the past 25 years.  

For more, Manx Radio reports.

Published in Ferry

Ferry operator, the Isle of Man Steam Packet Company have put forward several options to resolve an ongoing row over crew contract changes, the firm's boss has said.

Managing Director, Brian Thomson said "different" proposals had been made at discussions with the seafarers’ trade union Nautilus International and the Manx Industrial Relations Service.

Mr. Thomson commented that it was "too early a stage" to discuss details but he was "hopeful" a resolution could be found.

It follows cuts to services as union members work-to-rule.

A rostered officer who had taken compassionate leave, was not replaced as no cover could be found, leading to Douglas-Heysham passenger crossings having to be reduced. This according to the Steam Packet involves one daytime sailing of the newbuild flagship, Manxman each day for a fortnight, which began yesterday as Afloat reported.

The company’s freight-only vessel, MV Arrow will also carry out overnight services for the Manx government-owned ferry firm over the same period on the Isle of Man-England route.

Since the introduction of the £76m Manxman in August, the dispute has deteriorated and centres around the live aboard arrangements for crew on the flagship during rest periods.

More from BBC News on the dispute. 

Published in Ferry

Trade union, Nautilus International has said that industrial action is "increasingly likely" for the ferry crew working for the Isle of Man Steam Packet, as they have criticised the operator’s latest move over 'fire and rehire' of seafarers.

According to ITV News, the Douglas based ferry company have been in dispute with union, since they set out on new working conditions, which would see the crew live on-board, rather than going ashore to their homes after working hours.

In response to the new conditions, Garry Elliot, Head of Governance and Compliance at Nautilus International, called for the Manx government to "condemn the use of fire and rehire tactics".

A statement was issued to ferry workers by the Steam Packet, whose Managing Director, from Brian Thomson, commented: "If agreement to the LOB arrangements cannot be reached, we will need to then consider giving notice to terminate your current employment contract and offer re-engagement on new contracts that incorporate the LOB arrangements as set out in the FAQ.”

At this stage, the crew members have until next Tuesday, 22 December to accept changes to their employment contracts.

More here on the ongoing dispute facing the Manx Government owned ferry company.

Published in Ferry
Page 1 of 8

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023