Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: Peel Ports

The UK's second largest port operator, Peel Ports Group, has today announced its Queen Elizabeth II Dock at Eastham, England, will utilise energy from hydropower.

It’s the latest move to drive forward Peel Ports’ ambition to become net-zero across its network and operations by 2040.

The port operator has partnered with Czech renewable energy specialist Hydropol to install a state-of-the-art twin Archimedean screw generator, at the site’s 30 foot lock. Now connected to the Dock’s electricity network, it will generate up to 1,500,000 kWh per year – enough energy to power an estimated 190,000 homes for a day.[i]

Under a pioneering private energy purchasing agreement, Peel Ports will procure this renewable energy from Hydropol, solidifying its commitment to sustainable energy production and sourcing.

As well as providing energy to the Dock, the generator will power the site’s Green Automotive Hub, which has been enabling sustainable vehicle manufacturing since its launch in late 2023. The use of the hydropower generator to operate the Hub makes it even greener and fully energy independent.

Lewis McIntyre, Managing Director – Port Services at Peel Ports Group, said: “The introduction of hydropower at Queen Elizabeth II Dock is another major achievement as we seek to make our operations greener and more sustainable for the future. The amount of renewable energy set to be produced is significant and builds on Eastham Dock’s sustainable credentials.”

The introduction of hydropower to Queen Elizabeth II Dock is the latest move by Peel Ports to improve the sustainability of its operations across the UK, and builds on the company’s strong track record, with the Group having already reduced Scope 1 & Scope 2 emissions across its ports by a total of 32 percent, against its 2020 baseline.

In 2021 Peel Ports announced its commitment to becoming a net zero port operator by 2040, ten years ahead of the UK Government’s target, making it the first UK port operator to declare such ambitious decarbonisation plans.

[i] An average 3 bedroom house uses 7.95kWh a day.

Archimedean screw generator produces 1,500,000 kWh

1,500,000kWh divided by 7.95 = 187,500

Published in Ports & Shipping

The UK’s second-largest port operator, Peel Ports Group is inviting contractors to submit bids for two new frameworks covering a major long-term programme of construction works across its UK and Ireland sites, worth a total of £750 million.

The port operator is seeking to appoint contractors to the two frameworks for a period of up to eight years, with one framework covering general construction and the other covering marine construction.

The frameworks cover construction projects across the Group’s entire portfolio of UK and Ireland ports, including the Port of Liverpool, Heysham Port, Manchester Ship Canal, London Medway, its Clydeport sites, Great Yarmouth, and Dublin Port.

The move underpins the delivery of Peel Ports’ long-term construction pipeline, with the scope of the frameworks covering both existing infrastructure improvements, and the development of new infrastructure.

Lewis McIntyre, Managing Director - Port Services at Peel Ports Group said: “Our ports form a network of busy logistics hubs servicing local, national and global supply chains, and this move represents a huge step in our efforts to futureproof that network, so we can keep responding and adapting to our port users’ needs in an agile way.

“The long-term nature of these framework agreements allows us to build meaningful, commercially sustainable partnerships with our construction contractors. It further allows us to appoint a collection of regional suppliers to give us breadth and depth of scope, skill, and responsiveness; the way the frameworks are structured provides invaluable opportunities for the successful partners to design and build sustainable solutions for our various projects, in what will be a truly collaborative approach as we aim for Net zero by 2040.”

The first framework’s scope covers general construction works including drainage; the construction and maintenance of new and existing roads and carparks; earthworks and ground remediation; foundations and piling; the construction, maintenance and refurbishment of new and existing warehouses; paving, surfacing and concrete works; rail construction; bridge construction and refurbishment; and demolition.

The second framework covers specialist marine construction works including piling; asset renewal and refurbishment; berthing furniture and bollards; quay walls; Lock and Sluice gate maintenance and replacement; and RoRo.

The call for tenders notes that bidders should be able to demonstrate first class delivery of health, safety, environmental and quality requirements, including local community engagement and supporting Peel Ports Group in the delivery of its ambition to become a net-zero port operator by 2040. It also emphasises the importance of the application of lean construction methodologies and managing change effectively and efficiently.

The procurement process is expected to take place throughout 2024, with contracts expected to be awarded towards the end of 2024.

The full notice is available to view here.

Published in Ports & Shipping

In south-west Scotland, Peel Ports Clydeport is set for a record year handling wind turbine components at the King George V Dock site in Glasgow as the operator continues to support the renewable energy sector.

The UK’s second largest port operator will process over a thousand components, weighing more than 60,000 tonnes, at the site throughout 2024.

Since 2005 Peel Ports Clydeport has handled over 1,200 wind turbines through King George V Dock, resulting in more than 35 percent of total capacity installed in Scotland – more than any other port across the country.

The expected tonnage for 2024 marks a bumper year ahead for the facility, located on the banks of the River Clyde, which has a strong track record in transporting components used for onshore based wind projects.

Representing a significant increase in tonnage from last year, some 1,050 components, 100 complete turbines, and 249 blades from North Kyle Windfarm in East Ayrshire are set to go through the port’s deep-sea dock facility this year. The group will further handle around 550 blades, 100 drivetrains, 100 nacelles and 300 tower sections.

King George V Dock’s deep-sea facility is uniquely equipped to accommodate the handling of large-scale wind turbine components, allowing efficient movement of vital equipment to and from wind farm sites.

With Clydeport anticipating a surge in wind components in the year ahead, the news reflects growing momentum across Scotland’s renewables sector, and will help drive the country towards meeting its sustainable energy targets.

Jim McSporran, port director at Peel Ports Clydeport, said: “We’re all proud to be a major player in driving Scotland’s renewable energy ambitions forward.

“The tonnage set to pass through King George V Dock in the year ahead is really impressive, but what’s more, it shows the confidence of those working across the renewables sector in our ability to open the door for the seamless, and vital, transportation of key components.

“As the world looks to rise to the most urgent environmental challenges, the need for renewable energy has never been greater. A key part of our strategy moving forward is to ensure we are ready to help the sector meet this demand.”

Published in Ports & Shipping

Across the Irish Sea, Peel Ports Group on Merseyside and Spanish shipping operator, Suardiaz Lines launched a UK-first Green Automotive manufacturing Hub, which will significantly reduce supply chain emissions in the north-west England. 

The £10 million facility which is the first of its kind in the UK, was officially opened in a ribbon cutting ceremony yesterday, as it welcomed a Suardiaz ro-ro vessel (Afloat has identified as Friedrich Russ which today is returning to Vigo in Spain) on which it will service a twice-weekly shipping route. 

Located on a 9.5-acre site at Queen Elizabeth II Dock at Eastham, within Peel Ports’ Mersey cluster, the Hub will power sustainable vehicle manufacturing and facilitate a greener end-to-end maritime logistics service in the North West.

Developed in partnership with global logistics firm Suardiaz for leading automaker Stellantis, the service will supply parts for Ellesmere Port’s vehicle manufacturing site, which is now the first of its plants to produce solely battery-electric models for commercial and passenger vehicles.

The maritime route servicing the plant is projected to reduce annual CO2 emissions by 30% and energy consumption by 37%, when compared to road travel. It is expected to take an estimated 14,700 lorry journeys off roads across the UK and continental Europe annually, saving approximately 17.5 million kilometres (c.11 million miles) in road trips.

Claudio Veritiero, CEO at Peel Ports said: "This new Green Automotive Hub is set to be a gamechanger in cutting supply chain emissions and road congestion in the UK. It’s a great example of the forward thinking cooperation that is needed to reduce the impact of the maritime and logistics sectors on the environment. We have consistently said that reducing road miles will be central to combating climate change, but we know that can only be achieved by providing sustainable alternatives utilising ports in close proximity to final destinations.

“An essential element of our sustainability drive is close collaboration with like-minded businesses, and we are delighted to partner with Suardiaz and Stellantis on this pioneering project.”

Juan Riva, President and CEO of Suardiaz, said: “This new Suardiaz Terminal is the result of the excellent collaboration between Peel Ports and Suardiaz, as well as the trust vested by Stellantis in Suardiaz to establish and execute the supply chain for Ellesmere Port Plant.

“The Intermodal solution we have implemented for the Ellesmere Port factory, which combines road and maritime transport, will significantly reduce CO2 emissions by eliminating over 14,000 trucks from European and British roads.

“Furthermore, we are actively engaged with Peel Ports, Freeports, and the Ellesmere Port Plant to facilitate the adoption of Cold Ironing and the electrification of the last mile by using electric trucks. The imminent introduction of biofuels to our ships will further strengthen our commitment to the decarbonisation and sustainability of our maritime-land corridors, in the same spirit under which Stellantis electric vehicles are manufactured.”

Diane Miller, Ellesmere Port Plant Director, Stellantis, said: “We’re thrilled to be marking the opening of the new Green Automotive Hub at Queen Elizabeth II Eastham dock. Following the start of electric vehicle production earlier this year, this is another important milestone for Ellesmere Port, enabling us to establish a sustainable supply chain through a new maritime shipping route with our sister plant in Vigo, Spain. I’d like to thank Peel Ports and Suardiaz for their collaboration on this groundbreaking project.”

Peel Ports and Suardíaz invested a combined £10 million in recommissioning an existing berth at the dock and installing the infrastructure needed to support the processing of the Roll-on Roll-off (RoRo) ships and their cargo to develop the Hub.

The launch of the Green Automotive Hub represents the latest move by Peel Ports to improve the sustainability of its operations. In 2021 the Group announced its commitment to becoming a net zero port operator by 2040, ten years ahead of the UK Government’s target.

Published in Ports & Shipping

The largest ferry operator on the Irish Sea, Stena Line has said it hopes to launch a route from Birkenhead, on the Wirral peninsula, to Dublin Port following news that a historic Liverpool route is set to be axed.

The announcement follows from rival, P&O Ferries which said it intends to close its (two-ropax operated central Irish Sea) Liverpool-Dublin service at the end of this year, in what was described as a "huge blow" to the two cities.

The Swedish owned Stena Line which already operates out of Merseyside with the Birkenhead-Belfast route, understands that Dublin Port is to initiate a selection process to identify a potential new operator on the Ireland-UK corridor linking the Liffey and Merseyside.

Stena Line which also operates Dublin-Holyhead on the central corridor, said it will participate fully in this process and will be "registering an interest in re-establishing a Dublin–Birkenhead service."

A spokesman for Peel Ports Group, the UK’s second largest port operator, confirmed that the P&O Ferries service would no longer be calling into Liverpool on expiration of their existing contract at the end of 2023. 

The ferry company which operate twin ropax's on the 8-hour route declined to say why the contract had not been renewed.

Liverpool Echo has more on this development. 

Published in Stena Line

The UK's second largest ports operator, Peel Ports Group is investing £28 million in a new facility at the Port of Liverpool, its biggest single investment in warehousing this year.

Construction of the 240,000 square foot warehouse at the port operator’s Alexandra Dock is to begin in the coming days.

The new facility, referred to as Alexandra Dock Multi-User Warehouse (MUW), will be the length of up to five football pitches (400 metres) and used for the handling and storage of cargo at the port.

It will be able to store a variety of commodities, both unitised and non-unitised requiring indoor storage.

The facility will also have 300 metres of dedicated quayside and state-of-the-art cranes to optimise vessel discharge as part of the new development.

David Huck, Chief Operating Officer at Peel Ports Group, said: “We’re very pleased to be announcing the construction for this major purpose-built space at the Port of Liverpool.

“We’ve seen a significant increase in demand for warehousing, and this huge new facility provides an opportunity for new customers looking for capacity to grow their business, as well as allowing existing customers the chance to expand their operational capacity at the port.

“This also represents a very important milestone for Peel Ports Group, enhancing both our warehousing and distribution offerings while enabling more sustainable port-centric solutions.

“We’ve long argued the benefits of the Port of Liverpool’s central location, and this new facility will also provide real cost, carbon and congestion supply chain benefits to the market.”

The new state-of-the-art, dynamic storage facility has been maximised for storage volumes, discharge performance and fast HGV turnaround times.

The project is expected to be completed in April 2024 and the work will be carried out by leading construction company Glencar.

Commenting on the project, Peter Goodman, Managing Director – Midlands & North, said: “Working with some of the UK’s leading asset managers, developers and occupiers, Glencar has developed a market leading reputation in the delivery of industrial and logistics facilities.

“We understand the commercial imperative to produce sustainable and high-quality structures, often at speed, creating lasting value for asset owners and are delighted to be working for leading UK Port Operator Peel Ports to construct this multi-user warehouse development.

“Ports serve as a critical part of the UK Supply Chain and multi-users facilities of this type contribute towards the continuation of the import and export of vital goods. We look forward to working with the full project team progressing the project to a successful end product.”

Published in Ports & Shipping

Svitzer's 22 strong fleet of tugs operating in Peel Ports locations in the UK have successfully been converted from Marine Gas Oil (MGO) to Hydrogenated Vegetable Oil (HVO).

Annual emission reductions of close to 15,000 tonnes of CO2 are expected in support of Peel Ports’ net zero by 2040 commitment.

Peel Ports, the second largest ports group in the UK, enabling businesses to benefit from innovative and sustainable port centric solutions, and Svitzer, the world’s leading provider of sustainable marine services and part of A.P. Moller-Maersk, are jointly taking important steps forward to become net zero by 2040.

Throughout 2022, Svitzer converted 55 of its UK-based tugs from Marine Gas Oil (MGO) onto hydrogenated vegetable oil-based fuels (HVO), sourced only from secondary feed stock (waste products), thereby dramatically reducing carbon emissions for its fleet.

At Peel Port locations, Svitzer’s MGO to HVO conversion was performed on 22 tugs starting in April 2022. With more than 8,000 tug jobs performed in Liverpool, Greenock/Grangemouth, and London-Medway, approximately 11,500 tonnes of CO2 were saved in 2022 alone. Going forward, this will result in annual emission reductions close to 15,000 tonnes of CO2.

At the same time, Svitzer’s implementation of its “Aim for 8!”behavioural change program, which focuses on keeping tug mobilisation and demobilisation speeds below 8 knots, has enabled an additional avoidance of 2,600 tonnes of CO2 emissions across Europe since 2020.

Lewis McIntyre, Managing Director of Port Services said: “Being a responsible business means taking an active role in protecting and enhancing the environments that we operate within, ensuring a more sustainable future for all. This commitment is reflected in the wide range of carbon saving initiatives we’ve already undertaken, from electrifying our vehicles to using HVO as an alternative to diesel in our plant and equipment. This focus was recognised in March when Peel Ports was named Clean Maritime Operator of the Year at the Maritime UK Awards 2023. Our partnership with Svitzer underlines the benefits of working closely with the Ports supply chain and ecosystems to achieve Net Zero.”

Certified scope 3 emission reductions

Peel Ports and Svitzer both share the ambition of reaching net zero by 2040. Within that context, Svitzer customers operating in and out of Peel Port locations can benefit from carbon-neutral towage services through certified scope 3 emission reductions (according to Roundtable on Sustainable Biomaterials standards) through its EcoTow solution.

Gareth Prowse, Head of Decarbonisation, says: “With an estimated 95 % of the world’s goods traded by sea, ports, as significant enablers of trade, play an instrumental role in helping to reduce climate change. At Svitzer, we’re excited to support Peel Ports in their efforts to decarbonise marine operations by offering ships operating in the port 100 % carbon neutral towage services[1] through our EcoTow solution. It’s another important step forward to reduce the CO2 intensity of our global fleet by 50 % by 2030 and to have 100% carbon neutral operations by 2040.”

He continues: ”We’re making a serious commitment towards decarbonisation, and based on our recent discussions with Peel Ports, there’s no doubt that they’re equally committed to decarbonisation. This applies through investments in sustainable infrastructure, by bringing sustainable solutions to customers and port user networks, through partnerships, and by constantly challenging the status quo. We look forward to continuing our close collaboration focusing on how to best support Peel Ports’ vision of becoming a net zero port operator.”

In the UK alone, Svitzer’s conversion of 55 tugs saved 22,000+ tonnes of CO2 last year and will result in a 38,000+ tonnes annual emissions reduction going forward, almost 14 % of the company’s total carbon emissions from MGO.

For more information about EcoTow, Svitzer’s carbon neutral towage service, click here.

[1] Measured based on a Tank to Wake perspective for fuel consumption.

Published in Ports & Shipping

One of the UK’s largest port operators, Peel Port Group has announces that it has completed the acquisition of HES Humber Bulk Terminal for an undisclosed sum.

The ports group has acquired the business from specialist bulk terminals operator, HES International (headquartered in Rotterdam), to expand its presence to the UK’s East Coast.

The acquisition means Peel Ports now operates across eight key locations in the UK and Ireland, with the ports of Liverpool, Heysham, Manchester Ship Canal, London Medway, Clydeport, Great Yarmouth and a container terminal in Dublin Port already within its portfolio.

The new bulk terminal, situated on the South Bank of the Humber Estuary, will be operated by Peel Ports Logistics, a division of Peel Ports Group that specialises in ‘One-Stop-Shop’ logistics solutions.

The acquisition marks Peel Ports Logistics’ third UK presence and its first on the East Coast. Its other operations are located in the North West, at Runcorn and Ellesmere Port respectively. The division is led by Managing Director, Sebastian Gardiner.

The terminal has an open storage capacity of 6,200 m2 and a covered storage facility of 275,000 m3. With an automated conveyor-fed import and export system, the terminal delivers safe and efficient handling and storage of a variety of dry bulk products.

Bulk customers in key industries including agriculture, construction and energy, will be able to benefit from the expertise, experience and streamlined operations with the expansion of Peel Ports Logistics’ ‘One-Stop-Shop’ solutions to the region.

The HES Humber Bulk Terminal currently employs 29 people, all of whom will be retained as part of the acquisition.

Claudio Veritiero, CEO of Peel Ports Group, said: “The acquisition of HES Humber Bulk Terminal is an important investment for Peel Ports Group, expanding our presence into the East of England and bringing Peel Ports Logistics’ ‘One-Stop-Shop’ service to the East Coast.“The modern facilities at HES Humber Bulk Terminal guarantee fast and efficient loading and unloading of vessels and trucks, while the excellent water and road connections enable quick and smooth operations. This, combined with trans-shipment and extensive storage capabilities, will make the site a key addition to Peel Ports Logistics, helping us to deliver efficient and cost-effective port services for our customers.”

Cees van Gent, CEO of HES International, said: “We would sincerely like to thank all HES Humber Bulk Terminal employees for their ongoing commitment and valuable contribution to the company. Peel Ports has a long and outstanding history in the safe handling of cargo from across the globe and plays an integral role in customer supply chains.

“They are a reputable market player in the UK and we are confident that they will support HES Humber Bulk Terminal to build on its successful history. Proceeds from the sale will be reinvested in energy transition related projects that are pivotal for the long-term, sustainable growth and transformation of HES.”

Published in Ports & Shipping

Peel Ports Group, one of the UK’s largest port operators, has won the Maritime UK award for seizing opportunities presented within the UK Government’s strategy for the sector - including its commitment to become a net zero port operator by 2040.

The leading port group emerged successful in the 2050 category after demonstrating its impressive focus on the core objectives of the Maritime strategy, which was created in partnership between the Government and industry.

The award, which was sponsored by the Department for Transport, acknowledges the steps the port operator has taken to deliver on the seven key strategic themes of the initiative, which are: Environment, Infrastructure, Technology, Security&Resilience, People, UK Competitive Advantage and Trade.

The win comes off the back of what was another game-changing year for Peel Ports, with the group demonstrating continued resilience in the face of the ongoing challenges posed by the pandemic and Brexit.

In 2021, the group announced its commitment to becoming net zero by 2040, ten years ahead of the Government’s national targets. It is the first major port group to make such an ambitious pledge.

In addition, last year, the port operator enabled the launch of several new services and trade opportunities, such as a freight-only ferry service connecting the Port of Sheerness and Calais with operator DFDS and the expansion of new multi-modal rail connections and crane capacity at the Port of Liverpool.

Major infrastructure investments over the last decade, to the tune of £1.2 billion, include the concept and launch of Liverpool2, a £400m deep water container terminal and the £100m development of a custom-built biomass import facility. It also includes the ongoing regeneration of Hunterston PARC, showcased by the government as one of the UK’s most exciting inward investment opportunities for the blue and green economy.

Speaking of the award, Mark Whitworth, CEO at Peel Ports said: “Being recognised for our efforts in the 2050 category is a fantastic, progressive achievement for our teams.

“We are proud to have worked tirelessly to support the key objectives of Maritime 2050, as well as facilitating continuous economic growth at a national and regional level.

“The recognition from our peers supports the resilience we have shown in the face of challenges posed by the pandemic, global port congestion and Brexit.

“Our teams continue to rise to every challenge and our success over the last 12 months has further positioned our ambitions for sustainable growth and the positive economic impact this has on the regions we operate within.”

The Maritime UK Awards ceremony took place on 10 March at the Glasgow Science Centre, with the awards presented by award-winning broadcaster Jennifer Reoch.

The event celebrates the work of the maritime sector, which is one of the UK’s biggest industries, adding £46.1bn to the economy every year and supporting 1.1 million jobs.

The Maritime UK Awards are open to all organisations from across the breadth of the maritime sector, including shipping, ports, services, engineering and leisure, and the award categories themselves are designed to reflect the themes of the Maritime 2050 strategy.

It is the third award Peel Ports Group has won in the last 12 months after being recognised as Greenfleet’s private sector commercial fleet of the year for its conversion to electric vehicles, as well as winning UK Ports Directory’s port operator of the year award.

Published in Ports & Shipping

One of the UK’s largest port operators, Peel Ports Group which among its facilities includes a container terminal in Dublin Port, has announced major changes to its senior leadership team which is to take effect from 4 April 2022.

Having grown on average by 10% year-on-year for the last decade, and with over £1.2 billion being invested into its operations over the same period, the group’s announcement reinforces its ambition to future-proof the business whilst delivering the next phase of its long-term strategy.

⦁ Chairman Tom Allison is standing down but will remain on the board representing shareholder interests of Peel Group as a non-executive director.
⦁ Mark Whitworth will stand down as Chief Executive Officer but will assume the role of Chairman, overseeing the strategic development and governance of the group.
⦁ Claudio Veritiero will take over as new CEO as the group readies to commence a new investment programme across its primary assets

Mark Whitworth said: “For more than a decade we have consistently been at the forefront of the UK ports industry for the delivery of growth and investment. This has been a transformational period for the business and one that has enabled the group to create thousands of high value jobs within our existing and new facilities.”

“Given that stability in the company leadership has been a cornerstone of our success, the changes we are announcing today have been two years in the planning to ensure a smooth transition.”

“We have ambitious plans to maintain the growth trajectory, which in turn will continue to create positive results not only for our company, but also for the regions and communities we operate within, for many years to come.”

“The time is right for change and Claudio will be integral to making that change happen as he leads the business into an exciting new era.”

Mark Whitworth joined Peel Ports as Chief Executive in 2010 and over his tenure has led major transformations across the business, including the concept and launch of Liverpool2, a £400 million deep water container terminal, the £100m development of a custom-built biomass import terminal for Drax Group plc and the ongoing regeneration of major hubs such as Hunterston PARC and the Inchgreen Dry Dock in Scotland.

Significant acquisitions including the Port of Great Yarmouth and Quality Freight (now known as Peel Ports Logistics) are also included in Mark’s successful portfolio, all contributing to three-fold growth in profitability from when he joined the business.

Speaking about Tom Allison’s retirement as chairman, Mark added: “Tom has been an outstanding mentor throughout his time with our group and has overseen an unprecedented period of success. His business acumen and strategic counsel have been critical over the last 25 years and we are privileged to have him continuing to support the company as a non-executive director.”

Tom Allison was appointed Chief Executive of Clydeport PLC in 1997 and subsequently led the creation of Peel Ports Group in 2003. He then combined the role of CEO and Chairman, overseeing the acquisition of Mersey Docks and Harbour Company in 2005.

Claudio Veritiero joined Peel Ports in 2021 with over 25 years of experience working in the infrastructure, logistics, property development and financing markets. He was previously Chief Operating Officer of Kier Group Plc and has held roles as Chief Operating Officer of Speedy Hire and in the investment banking advisory division of Rothschild & Co.

Claudio said: “Since joining Peel Ports a year ago, I’ve been taken by the calibre of our people, our operations and our customer relationships. I’m delighted to be taking on the role of CEO and will look to build on the unprecedented success that Mark has led over 12 years. One of my priorities will be to take stock of the changing needs of our customers and the port communities in which we operate so that we can further enhance our offering and customer experience.”

“Ports are a vital catalyst for the whole economy, not just the supply chain, with a crucial role to play in creating jobs and enabling economic regeneration. I look forward to working closely with the leadership teams across the business, our customers and our commercial and community partners, as we deliver the next phase of our growth journey.”

Latest Department for Transport data confirms Peel Ports to be one of the fastest growing port groups in the UK, already handling 70 million tonnes of cargo per year and with 15% of the UK’s total port traffic traveling through its waters.

Peel Ports’ key facilities include Port of Liverpool, Manchester Ship Canal, Heysham Port, Clydeport, Great Yarmouth, London Medway and in Dublin Port, the Marine Terminals Ltd container terminal. (Afloat adds the MTL facility is located on the south quays, see photo above).

The ports group also owns BG Freight, the short-sea shipping operator that offers a range of freight and logistics services through Peel Ports Logistics. The group has seen significant growth, averaging 10% year on year across the last 10 years and outlaying over £1.2bn into projects over the same period.

Published in Ports & Shipping
Page 1 of 2

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023