Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: Ports & Shipping news

#CarImports - Afloat earlier this month reflected on Ireland-Bristol Channel routes past and present serving the UK motor industry and of Nissan that denied speculation it would move from its major plant in Sunderland to Cork following Britain's vote on Brexit. The Japanese car-giant writes The Guardian have confirmed they will remain manufacturing in the English north-east city. 

The importance of Nissan’s decision to make the new Qashqai and X-Trail models in Sunderland cannot be overstated. Since the referendum on 23 June, when 61.3% of the city’s voters opted for Brexit, a heavy air of anxiety has hung over the city, its economic future heavily tied to the car giant.

Few of the city’s politicians, voters or business leaders believed Nissan’s veiled threat that it could leave the city if it did not receive urgent guarantees from Theresa May.

After all, it is the most efficient car factory in Europe, producing 115 cars an hour – half a million a year – and is the home of Qashqais, Jukes, Notes, Leafs, Infiniti Q30s and now the new X-Trail.

Uprooting those finely-tuned production lines to Spain or Russia, where it has other factories, was almost unthinkable. “It is too big to leave,” was also a common view on the doorstep.

The Guardian has more on the story here  Also to read of Dublin Port's 9.8% rise in new vehicles imports on the same period (first nine months) last year, in which demand for this trade shows little sign of abating.

 

 

Published in Ports & Shipping

#IMDOappointments - The Irish Maritime Development Office (IMDO) announcement of two new appointments to key management positions has been welcomed here on Afloat.ie, which offers the only regular ports & shipping coverage.

Dr Edel O’Connor joins the IMDO as Business Development Manager and Kelli O’Malley as Marketing & Communications Manager. Their appointments to the organisations management team were made in recent weeks. The government agency is responsible in providing dedicated support to national and international maritime business sector in Ireland.

Dr Edel O'Connor, Business Development Manager, IMDO

Edel holds a doctorate in computer science from DCU and recently received a Diploma in Management from the Irish Management Institute. Over the past number of years, Edel has led the strategic development and implementation of the national marine technology programme and associated SmartOcean initiative. This programme has worked to ‘marinise’ Ireland’s existing strengths across ICT and engineering to drive innovation in new areas of the blue economy.

In this role, Edel spearheaded a number of highly successful events promoting Ireland's digital ocean opportunity and enabling technology companies to drive new forms of innovation in marine using Ireland as a test-bed. Edel also led the development of international partnerships across research and industry, supporting the growth of Ireland’s reputation as an attractive place to do business in this sector. Edel has also been closely involved with the strategic development of actions associated with Harnessing Our Ocean Wealth, and in particular supported the work of the Development Task Force.

Kelli O'Malley, Marketing & Communications Manager, IMDO

Kelli has responsibility for the planning and implementation of the IMDO’s marketing and communications activities both in Ireland and abroad.

Similar roles were held by Keli with the Institute of Directors in Ireland, Chambers Ireland and various PR agencies. Kelli holds an M.A. in Public Relations from Dublin Institute of Technology, a B.A. in English & Economics from UCD and a Certificate in Public Affairs from the Public Relations Institute of Ireland (PRII).

Commenting on the new appointments, Liam Lacey, Director of the IMDO, said: “I am delighted to welcome Dr Edel O’Connor and Kelli O’Malley to the IMDO team. The knowledge, experience and expertise that Edel and Kelli bring to the organisation further strengthens our position to provide top class support to national and international maritime businesses based in Ireland and those considering doing business here. I very much look forward to working with Edel and Kelli in continuing to achieve our aim of being the focal point for maritime business in Ireland.”

Published in Ports & Shipping

#Transfer - Minister for Transport has said in the Seanad the transfer of governance of Dún Laoghaire Harbour Company to the local council is imminent, writes The Irish Times.

Minister Shane Ross said he understood the company and Dún Laoghaire-Rathdown County Council had established transitional teams which were working on the practical issues associated with the transfer. (See: Regional Ports Transfer)

He said officials from his department had met both sides on a number of occasions to assist in the process. “I have also met with many local groups,’’ he added.

Mr Ross said the company faced a challenging financial and operating environment as it moved from commercial shipping activities towards a different operating model, with the focus on marine leisure and marine-related tourism.

Stena Line’s departure from Dún Laoghaire Harbour added to the future challenges to the company. “The financial impact on the port is significant and it is very clear that the company faces a very different operating environment than it faced in the past,’’ he said.

For more on the commercial future of the harbour, click here

As previously reported on Afloat.ie, a Public Meeting regarding the proposed giant cruise liner berth is scheduled today, Thursday 27 October at 7pm in the Royal Marine Hotel. Speakers including Richard Boyd Barrett TD and Cllr Melissa Halpin will outline the two main options for the Government as the SOS movement sees it.

#Ardmore - Ardmore Shipping operators of chemical and product tankers (25,000 to 50,000dwt) has selected the UK P&I Club as its second P&I club.

On the back of the steady growth in the size of the Ardmore fleet which now stands at 27 ships, Ardmore decided to select a second club to provide Protection and Indemnity cover.

Commenting on the decision, Georgina Alderman, Ardmore’s Marine and Insurance Manager, said: “We looked at a number of options, including other UK based clubs, but we felt that the UK Club represented the best fit with our requirements, as well as with our ethos as an owner and operator committed to the highest standards of commercial and operational practices.

She added "We are looking forward to working together with the UK Club as an important partner for Ardmore Shipping.”

The UK Club will provide cover for three ships in Ardmore’s fleet.

As previously reported on Afloat, Jorge Lavin was recently appointed as the company's Financial Controller.

Published in Ports & Shipping

#CapeLaunch – A cargoship was launched today for Irish owners as the second of 10 in a new series from a shipyard in the Netherlands, writes Jehan Ashmore.

Ferus Smit’s Dutch yard in Westerbroek, is where the single hold 5,054dwt cargoship, Arklow Cape (yard No. 435) slid into the canal. The 'C' class newbuild of 2,999grt is to be delivered next month to Arklow Shipping Ltd. Leadship, Arklow Cadet made her entry onto the same waterway in June. 

It is pleasing to see that ASL have the newbuild with an Irish port of registry, that been her owners homeport in Co. Wicklow. This is not the case for their subsidiary, Arklow Shipping Nederland B.V. as their vessels are registered in Rotterdam.

More newbuilds will join this Dutch fleet as 10 ‘V’ class cargoships are on order also in this country. A fifth sister of 5,100dwt is under completion, in which Afloat can reveal is named Arklow Valour.

The newbuild programme has also seen ASL make disposals, most recently the 2002 built Arklow Rose. She was sold to UK owners, Charles M. Willie & Co. (Shipping) Ltd of Cardiff, Wales.

As for bulker, Arklow Willow (which almost a year ago dry-docked in Dublin) has according to the Maritime Insitute of Ireland been disposed in recent months to Canadian interests. 

The South Korean built 14,000dwt bulker dating to 2004 made her delivery voyage to Lake Ontario, having been sold to McKeil Marine, Hamilton. The family owned firm are traditionally tug operators on the Lawrence Seaway.

She was renamed Florence Spirit and is operating out of Toronto to Newfoundland.

Published in Ports & Shipping

#IrishEXports - A total €9.5bn worth of goods were exported to the United Kingdom in the first eight months of this year, according to the Central Statistics Office (CSO).

As reported on Newstalk, this represented a €300m drop from the €9.8bn it exported to Great Britain and Northern Ireland in the same period in 2015. This suggests that the Brexit vote and weakening sterling are starting to have an impact.

The new CSO data also shows we were importing less from the UK, down to €10.59bn for the first eight months of the year compared to the €11.53bn spend for the same period in 2015.

Ireland is the UK’s fifth largest trading partner. However, the value of Ireland's seasonally-adjusted goods exports fell by 11.5% following the UK's decision to leave the EU.

The price of the sterling also continues to drop, as Irish exporters face an uncertain future due to Brexit.

For more statistics click here

Published in Ports & Shipping

#Lamentable – The decision to close the largest graving dock in the state in Dublin Port has been described as ‘lamentable’ by the Maritime Institute of Ireland, writes Jehan Ashmore.

According to the M.I.I.’s latest biannual newsletter, the Institute expresses concern that the closure could result in work being lost to Ireland “with the lamentable decision to close and in-fill the big Dublin Graving Dock No.2 which was in constant use by Arklow Shipping”.

It is almost exactly six months ago that Afloat.ie reported the closure of the country’s largest drydock, at 220m long. The ship-repairer and conversion firm, Dublin Graving Docks ceased operations officially on 29 April with the loss of a skilled labourforce of 26 marine engineering personnel. The business had been operated by DGD under license from the Dublin Port Company.

The Institute added “this valuable overhaul and survey work would be lost to the State. It is the biggest such facility in the Republic and was opened in 1957 in style by the then President Sean T.O’Kelly as befitted such an iconic State-funded enterprise”.

Furthermore, in the Autumn newsletter article, the Institute said hopefully, wise counsel will prevail and this valuable maritime facility will be retained on the east coast in the country’s major port.

The last ship, however to use the facility, was aptly an Irish flagged cargoship, Arklow Fame (pictured above) that occupied the graving dock before floated-out on 27 April.

Dublin Port Company are to incorporate the graving dock by infilling to make additional quay frontage and cargo space for the €227m Alexandra Basin Redevelopment.

The ABR project is to enable considerably larger deep drafted cargoships to enter the port. In addition to accommodate giant cruiseships by berthing much closer to the city-centre.

The newsletter also commented that Arklow Shipping has since seemed to be trying out Cork Dockyard. It the next largest such facility in this state which received former business of DGD through the Arklow Rose, which Afloat first highlighted in July.

This former Dutch flagged member of the ASL fleet however upon completion of drydocking emerged as Celtic Venture having been sold to UK based owners. 

Published in Ports & Shipping

#ShippingReview - Jehan Ashmore reviews the shipping scene from among the following stories over the last fortnight.

In the 'Top 150 Born in Ireland' report, according to the Irish Exporters Association (IEA) the leading largest indigenous companies in that sector generated around €140bn in turnover last year.

The UK Government proposed to transfer frontline immigration controls to Irish port and airports, in measures to avoid enforcing a Brexit ‘hard border’ between the North and the Republic.

Ardmore Shipping Corporation appoints new Financial Controller, Jorge Lavin. The company operates a fleet of chemical and product tankers.  

Published in Ports & Shipping

#UNship - Mainport Cedar, which carried out a UN World Food Program to war-torn Yemen is on her first visit to Cork City where her Irish owners are based, writes Jehan Ashmore.

It was during the 9 month contract to the UN that the seismic support vessel which also is a supply ship carried out the unusual role of making humanitarian transportation voyages. The charter of the ship to the Arab country ceased earlier this year. 

Mainport Cedar has accommodation for 50 (10 officers and 40 marine crew) and a 1-bed hospital unit. During its UN charter role, the vessel transported UN personnel to Yemen.

As previously reported the 1,659 gross tonnage ship is the leadship of a pair built in Malaysia as the first purpose built seismic support ships for the Mainport Group. The 2013 built ship is berthed at Cork along Albert Quay, adjacent to the Port of Cork’s City Centre Marina.

The reason for the first call of the 53m vessel is due to the completion of a project in the Bristol Channel.

As for the next project, it would appear that Mainport Cedar is next bound for Nassau, Bahamas, though Mainport declined to confirm that the Caribbean island is the next area of operation.

Operating much closer to home, Mainport have the contract to serve the Kinsale Gas Field. This is carried out by the multi-role support vessel Pearl out of Ringaskiddy, lower Cork Harbour. It was here that Celtic Fergus, the latest acquisition for subsidiary Celtic Tugs was delivered by cargoship earlier this year.

Published in Port of Cork

#GiantCranes - The last batch of giant cranes for the Irish Sea's newest container terminal, the £400m Liverpool2 deep-water port development arrived by sea from China onto the River Mersey in recent days.

In May, Afloat reported on the first delivery from China of the cantilever rail-mounted gantry (CRMG) cranes that will be used at the biggest container terminal on the Irish Sea. The facility will cater for larger capacity and deeper-draft containerships.

Mark Whitworth, chief executive of Peel Ports, said: “These cranes are the final major piece of the infrastructure jigsaw as we approach the formal opening next month".

“Liverpool2, supported by our wider logistics offering and the port’s strategic location, will provide many shippers with a route to UK and Irish markets that helps them to cut costs, congestion and carbon emissions.”

The Chinese manufacturer ZPMC, also supplied the five ship-to-shore cranes and other CRMGs already on site, these six complete the set of 12 required for phase 1 of the terminal. Ultimately the site will have eight STS and 22 CRMG cranes as part of a £100m equipment investment.

Each of the cranes will be capable of performing an average of 20 moves per hour, with semi-automated control linked to the port’s new Navis N4 terminal operating system. They have a 40 tonne under-spreader capacity and a maximum container lift height above quay level of 21m under spreader (6+1 containers).

In August the cranes originally set off from Nantong on board the Zhenhua 8, passing south-east Asia, India, the Arabian Peninsula and through the Suez canal en route to Liverpool in a 49 day journey of over 20,000km (13,730 m, 11,930nm).

Published in Ports & Shipping
Page 5 of 39

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023