Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: VOR

#MARINE JOBS – As the festivities of the Volvo Ocean Race gain further momentum following this morning's final offshore race leg to Galway Harbour, the Marine Institute and SmartOcean Ireland are also to be present during the prestigious event as they are to host 'Oceans of Opportunity'.

Oceans of Opportunity, is a marine careers and training event (held this Thursday 5th and Friday 6th July) which is part of the Ocean Wealth Showcase at the Volvo Ocean Race Global Village. More than 80 Irish-based marine jobs will be on offer at the event and over 140 international opportunities.

A wide variety of marine jobs will be on offer at the event with a number of organisations (across shipping, technology, research, energy, and cruise line hospitality) actively recruiting over the two days. Information on the current opportunities will also be available on www.marinejobs.ie which will be launched this Thursday.

Speaking ahead of the event Dr Peter Heffernan, CEO Marine Institute said "This event highlights the wide variety of job opportunities that are available right now in the marine sector. It will be a great opportunity for those looking for a position in this area to meet with recruiters at the event.

For those who are just thinking about a career in the marine sector, it will be a chance to get some insight into the wide variety of opportunities available, including in maritime education and training".

Among those recruiting at the event are DCU (MSc, PhD, PostDoc positions), IBM (technical and engineering), Marine Institute (graduate opportunities) and the Chamber of Shipping. Experienced HR specialists will be on hand to provide advice on preparing for a career in the marine sector.

The Marine Institute and the Irish Maritime Development Office (IMDO) will also be offering marine career advice, job opportunities, CV workshops and clinics to support and advise job seekers looking to work in the marine sector.

A series of short talks are also scheduled throughout this Thursday, giving 'a day in the life' insight into the variety of careers that are available in the marine sector. For information on the schedule visit www.marine.ie or www.marinejobs.ie

Companies who wish to promote job opportunities on www.marinejobs.ie should contact [email protected]

Published in Jobs

#VOR – The Volvo Ocean Race will have eight boats next time round and in a major departure from the current race a new design has been revealed. The idea is to reduce the cost of mounting a competitive campaign and stem dwindling entry numbers.  The new design was revealed as details of the Notice of Race and the race route for the 2014 VOR were discussed by Volvo Ocean Race CEO Knut Frostad at a presentation in Lorient, France this morning, the ninth host port of the race.

The first new boats 65 will launch in June 2013. One new boat will launch every seven weeks. The price of the VO 65 is €4.5m,  about a million less than the current box rule boats which will be obsolete when the fleet hits Galway next week. Finance of the new yacht design and the production of the boat will be underwritten by the race sponsor Volvo.

The new boats will be built by th UK's Greene Marine.

vormeeting

Knut Frostad reveals the new 65 footer this morning. Photo: Ian Roman/VOR

The one design will have eight crew plus a media man. The race is keen to attract female teams which will have 10 crew.

Renderings of the new Volvo Ocean Race boat design that will be used in the next two editions of the Volvo Ocean Race. The new boat design from Farr Yacht Design was unveiled today.

vor65upright

 

Published in Ocean Race
Tagged under

#islandnation – THIS WEEK : Smelly humans, the pace picks up in Galway, pirates in Baltimore, the response of fishermen to the condescending RNLI and a Cork beauty are amongst my topics this week, read on .....

GALWAY PACE PICKS UP

There is an increasing buzz of excitement in Galway where the pace has picked up notably this week with work well underway on constructing the Volvo Ocean Race Village and increasing hope that Damian Foxall could be representing Ireland on the overall Volvo winners' podium in the City of the Tribes. It is still disappointing that the general media is not focussing attention on Ireland's two top international sailors in the race - Damian from Kerry and a member of Kinsale Yacht Club who is aboard the French entry Groupama and Justin Slattery from Cork who is with Abu Dhabi Ocean Racing.

ACHILL LIFEBOAT WHITE POLE ON PORT SIDE

The boat hook on Achill lifeboat

FISHERMEN TELL OFF THE RNLI

Dick Robinson, former lifeboat crewman from Valentia Island and author of several books about the lifeboat service, has written to me about my visit to the Achill Island lifeboat when I said I had learned that the two boat hooks on modern lifeboats are the only items remains as a tradition from the past."

Dick confirms that this is a reminder of the rowing lifeboat days:

"The RNLI at that time issued a rather condescending circular that white oars were to be used to starboard and blue to port, as 'the orthodox terms, starboard and port are rarely used in lifeboat work since many lifeboatmen are unaccustomed to nautical phraseology.' The Penlee crew reversed the placings as a protest against the tone of that circular.

"The orders from the Coxswain would be 'Forward the white, Back the blue' or reverse as appropriate. The boats would have no steerage way working in close, so the rudder would not be effective and so oars had to be worked all the time. The oars were the subject of considerable research as oars breaking during beaching or launching operations could be fatal. In 1866 trials were carried out involving 38 different types of wood. The best oars were found to be made from young trees in Norwegian and Baltic Wood, followed by oars made from planks of the same woods. Oregon Pine was also good. A balance had to be struck between oars which would break under ordinary conditions and ones which would not break if the lifeboat struck bottom in shallow waters and thereby might capsize her. Later oars were balanced with lead inside."

Thanks Dick for this information on a fascinating topic.

PIRATES IN BALTIMORE

The sacking of Baltimore village, a very popular sailing destination in West Cork, is the topic of a 'PIRATE SEMINAR' – an unusual addition to the list of maritime events this summer. It will be held next weekend, starting on Friday night, June 29 and running until Sunday, July 1, including events for all the family.

schullferry

The Schull – Baltimore – Cape Clear ferry departs Baltimore

Des Ekin, Assistant Editor with the Sunday World and author of the book – 'The Stolen Village' will discuss the 'Sack of Baltimore' in 1631 when inhabitants were taken off to slavery in Algiers. Connie Kelleher, Underwater Archaeologist with the Dept. of the Arts, Heritage and the Gaeltacht's Underwater Unit will discuss piracy in southwest Ireland in the seventeenth century.

New to Baltimore is a permanent 'piratical exhibition' at Dún na Séad castle, with details of the raid on the village and copies of rare graphics from the seventeenth century depicting the story of the Baltimore captives who were taken into a life of slavery. Details are also shown of the activities of the O'Driscoll clan and their notorious involvement with the men of Waterford during the middle ages. A depiction of Thomas Crooke, the English 'pirate/planter' is also featured. An accompanying feature of the exhibition is a new book by Bernie McCarthy called 'Pirates of Baltimore,' containing images of lifestyles and events associated with the piratical history of the village. Did you ever imagine the respectable Baltimore of today to have such a history!

The exhibition is open daily 11am – 6 pm.

THE BEAUTY OF TRADITION

There is a great beauty in traditional boats and the one pictured here, the Peel Castle, was for me the star of this year's Crosshaven Traditional Boats Gathering. She is owned by Graham Bailey and deservedly won the top prize at the event. A fishing lugger she was built back in 1929 at Porthleven in Cornwall, carvel, pitch pine planking on oak frames and her original engine power was 2 x 25 hp Alphas - currently 120hp Ford D series.

peel castle sailing in cork harbour

The Peel Caslte racing off Crosshaven

She was registered PZ17 at Penzance, later BM17 Brixham, Devon. She also fished out of Fleetwood from1968 and finished fishing in 1977 when she was de-registered. Re-registered in Skibbereen in 2008, she has sailed extensively in European waters. Restoration work was done at Hegarty's Old Court Boatyard and is impressive. Graham, a shipwright, also restored her internally. Visitors aboard were very impressed.

GASSY HUMANS!

Human-produced gas emissions are a significant cause of ocean warming!

Average ocean temperatures have been rising by 0.045 degrees per decade for the past half-century and natural fluctuations alone "do not explain warming in the upper layers of the planet's oceans," according to the Lawrence Livermore National USA National Laboratory. "Human greenhouse gas emissions are an added ingredient and strengthen the conclusion that most of the global ocean warming over the past 50 years is attributable to human activities," according to Livermore climate scientist Peter Gleckler.

The Californian Laboratory which made these findings in a desktop computer modelling study of the Atlantic and Pacific Oceans also researches protection against weapons of mass destruction!

To Email your comments to THIS ISLAND NATION: [email protected]

Follow Tom MacSweeney on Twitter @TomMacSweeney and on Facebook

Published in Island Nation

#SAILING – Schull Youth Team from West Cork won the Under 21 Trophy at the Wilson Trophy in West Kirby in the UK yesterday and it represented a sweet revenge for the teenage three boat team.

Dublin's Ger Owens and Scott Flanigan final chance for Olympic selection at the 470 World Championships in Barcelona got off to a flying start yesterday with the double Olympian Owens finishing fifth in the opening race. It is an early boost for one of 7 remaining places left in the Summer Olympics.  Ross Hamilton is also trying to qualify in the Finn class, he lies

It may have been 'gutting' not to come away with a medal at the Star world championships where Peter O'Leary and and David Burrows finished fourth overall but it was nevertheless a fantastic performance for the London qualified pairing who were third overall for most of last week.

Ben Duncan continues his domination of the SB3 class with a win in the 2012 Eastern Championships yesterday at the National Yacht Club who celebrated its yacht club of the year award last Wednesday.

There was success for Class III champion Supernova plus results from all 19 DBSC classes on Saturday in Dublin Bay.

Cork Harbour's Patrick Crosbie and Grattan Roberts were 420 dinghy winners at Galway Bay Sailing Club.

Offshore American Kenny Read and Team Puma is in back in the USA, a Volvo Ocean Race Win on the home waters of Miami all the more satisfying. The race will finish in Galway at the end of next month.

Billed as one of Europe's major yacht racing events, the 2012 Round Ireland Race starts on June 24th and an international fleet has been announced with UK entries at an all time high for Ireland's top offshore fixture.

Offshore sailing is on a high thanks largely to the pioneeing work of Peter Ryan with the Irish Sea fleet and why shouldn't we be our exploiting our offshore assets, sure don't we own 220 million acres? The third ISORA Race this weekend will feature virtual marks on the way to the Howth finish.

The title holder's absence may be Hong Kong's opportunity at the 2012 Commodore's Cup. Where is Team Ireland as Hong Kong builds up for the cup in just two month's time?

And in two week's time Howth Yacht Club report they have reached the magic number of 100 for the ICRA Cruiser Nationals at the North Dublin venue.

Published in Racing
#SANYA–Team Sanya hit choppy waters this evening following a decision to announce an official retirement from Leg One of the 2011-12 Volvo Ocean Race but they vow to get back in the race as soon as possible. The team have been working non-stop for the last two days to assess both the damage to their boat and the alternative options to get the boat and team back into the race as soon as possible. The extent of the damage meant that they had no choice but to retire from this leg and focus 100% of their efforts into getting the repair processes underway and shipping the boat to Cape Town the fastest way possible.

Mike Sanderson, CEO/Skipper of Team Sanya, spent time today elaborating on the events at sea on the morning of Sunday 6th November, and the team's intention to get back in the race as quickly as possible,

"We were moving along nicely and very happy with our progress, managing the big breeze and waves very nicely, we were not pushing 100% and had decided to throttle back a knot or so given the conditions; we felt we were in a comfortable zone. I had just had a chat with the guys when we suddenly felt a very odd lurch, like dragging the keel through soft mud. The guys on deck saw a lot of water coming into the bow and we could also hear the noise of water coming into the bow. The watertight doors were already shut thankfully.

We got everyone up and into lifejackets. For sure if the watertight doors had not been shut, we would have been sunk. We avoided the bear away for a time, which was a pretty tense time, we got the pumps going but they were not really making much difference. After a time our situation stabilized, we were nursing the boat upwind at 4-5 knots and then we bore away, got the jib down and suspended sailing as we headed into port.

Initially we had no idea of the extent of the damage, whether it was a small puncture wound or something larger. We could then see some carbon shards coming off the bow, which we realized were the uni directional fibres peeling back and we then realized the severity of the situation. Once we were at the dock in Motril we could see we had a deal breaker on our hands in terms of not being able to carry on racing from here to Cape Town.

With regard to the injury of our bowman, Andy Meiklejohn, he had an unfortunate bad accident in a completely unrelated incident. We were going through a jib change with Andy on the bow in extremely rough conditions and we had reduced speed from 13 down to around 6/7 knots and were nursing her through the waves. We were then hit by a series of massive waves (most likely the same ones that brought down the Abu Dhabi rig). Andy came down badly on his ankle/foot and sustained an injury. We contacted Race Office but were not sure of the breakage at that time. One hour later we were headed for shore due to the bow damage and so thankfully we were able to get him to the local hospital to be assessed where they confirmed he had indeed broken his foot. Andy is now in the process of receiving medical advise and will be treated asap.

Andy is an extremely pivotal team member and will be sorely missed while he is off. We will asses his recovery time and look at our Plan B for a replacement should we need one.

We are now 100% focused on getting the boat to Cape Town as soon as possible that would leave us 8-9 days in Cape Town before the start. Our worst-case scenario is that we ship to Cape Town but then we don't have time to fix it in time so we are late starting from Cape Town and then miss the ship from our stop point during leg 2.

This is no small task, we have a chop out a 6m x 3m x 1m section of the boat and replace it – normally a 2-3 week job shoehorned into 7 days. But this is the Volvo Ocean Race and we will do what we have to do to make it happen.

One fact that gives me some peace is that damage was not caused by anything we did wrong. For sure I have to believe that we hit something that caused the initial puncture wound that then peeled backwards. We were performing well and in good shape, we have not incurred one other bit of damage in those 24 hours so that is good news.
We need to take the time to do some serious thinking and planning, assessing the logistical options and making the right choices that get us back in the race as soon as possible. We need to repair the hull perfectly; a rush job is not an option.

From a personal point of view I have never before retired from a Whitbread or Volvo leg and so it's a pretty sad moment. We were very comfortable with how we were sailing and so it's extremely disappointing for the guys. Looking back on it we wouldn't do anything differently than we did so it's a good feeling that we handled the situation well.

For us as a team, we can still absolutely achieve everything we have set out to do – win some podium positions and take a few scalps from the other teams – and we fully intend to do that still. It is tragic to be out of this leg for sure but perhaps it would have been more tragic for one of the teams focusing on the overall event win.

Accidents do happen and now its all about the tenacity and focus to get it right, we don't give up, we're all dying to get back into the race, it was gut wrenching getting off the boat in Motril and seeing a big part of the boat missing.

Nothing about this team is reckless, we're not quitters or unprofessional in any way, we have a great bunch of guys here and I have absolute confidence that we will get back on the race track as soon as we possibly can. For now it's a full frenzy of activity to get our Sanya Lan race boat on a ship this Friday and turn a boat building job of 2-3 weeks into 7 days!"

Team Sanya will confirm shipping route and dates of departure and arrival into Cape Town as soon as that information is confirmed to them.

Published in Ocean Race
Tagged under
Top Irish offshore sailor Damian Foxall, now sailing with team Groupama in the next Volvo Ocean Race is on this weeks podcast from the VOR team. He's talking about the Route de Rhum. Find him HERE
Published in Offshore
Page 24 of 24

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023