Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: news update

#TobaccoShipSeized – RTE reports that Customs officers at Drogheda Port have seized tobacco worth an estimated €14m.

Customs officers backed by gardaí boarded a ship in the early hours of yesterday morning and recovered 32 million cigarettes and 4,000kg of water pipe tobacco.
It is the biggest seizure of cigarettes in Europe this year.

The operation targeted an international crime gang led by Irish and UK nationals based in Europe.

The MV Shingle was loaded in Slovenia and arrived into Drogheda Port early this morning having sailed via Lisbon in Portugal.

The ship and its cargo were seized and a number of follow-up searches are under way both in Ireland and in mainland Europe.

A spokesperson for Revenue said the operation was the culmination of months of work by law enforcement agencies across the continent including Slovenia, Portugal and Ireland.

For more RTE has photos of the vessel departing Drogheda Port and arriving at Dublin Port plus TV news coverage by clicking HERE.

Afloat.ie adds the 669 tonnes built in 1982 was escorted from the Louth port to the capital by the Revenue Commissioners cutters RCC Suirbheir and RCC Faire.

 

Published in News Update

#D-Day70Anniversary- As reported yesterday, the Royal Navy joined by allied naval vessels formed an overnight flotilla from Portsmouth and are currently off the Normandy Beaches on this D-Day 70th anniversary, writes Jehan Ashmore.

Throughout today, major religious and commemorative services are been attended by the dwindling number of allied World War II veterans. This morning members of the British Royal Family headed by Queen Elizabeth attended a service inland at Bayeux Cathedral.

Also today the largest D-Day ceremonial commemorative event takes place in Quistreham near Caen, as allied nations will be joined by around 19 states marking the proceedings the most 'international' when held on 'Sword' beach. This beach is one of five code named beaches that are within a 50 mile stretch of the Normandy coast.

Joining the World War II veterans at Quistreham will be royalty, political leaders, heads of states and dignitaries in a mark of respect and recognition to all those who fought and lost their lives in this critical and momentous campaign on 6 June 1944.

The Royal Navy's 'flagship' HMS Bulwark (L15) which as previously reported took part in the overnight allied flotilla is anchored offshore of Arromanches, where on 'Gold' beach naval landing craft are beached presenting a mere semblance to the battle scene to liberate France. Thousands of visitors are thronging the beaches and mass-scale cemetaries.

The other two beaches to the west of Arromanches is where the US fought on 'Utah' and 'Omaha' and to the east Canada took part on 'Juno' beach. The final beach is 'Sword' at Quistreham which formed the second beach in which Britain took action as part of the allied forces. This is to be last occasion of the Normandy Veterans Association in attending D-Day commemorations due to the dwindling numbers and as such the association is to be disbanded.

Among the flotilla from Portsmouth is HMS Express (P163) a small patrol boat which visited Dun Laoghaire Harbour in April and also that month when HNLMS Johann de Witt (L801) a landing platform dockship of the Royal Netherlands Navy called to Dublin Port.

In addition to the English Channel crossing flotilla and other navies are several cruiseships making commemorative cruises and berthed in Caen are Silver Cloud and Sea Cloud II. The city quays is also where the Royal Norwegian yacht K/S Norge is paying a visit, the vessel in recent years has made two tours to Irish ports.

 

Published in News Update

#D-Day70anniversary -Major events are been held on both sides of the English Channel today in advance of the 70th Anniversary of the D-Day Allied Invasion, writes Jehan Ashmore.

To find further details commemorating the momentous D-Day (6th June 1944) they can be found from the D-Day Museum's events programme by visiting their website.

The busy UK ferryport of Portsmouth is synominous with the Royal Navy's homeport and main naval base from where commemorations and elsewhere in the city are taking palce this week to Sunday.

During World War II the Hampshire port was one of the key strategic locations across the south coast from where thousands of Allied troops departed for Normandy.

To mark the critical and momentous event, on the UK side of the English Channel there is to be an exodus from Portsmouth today of a flotilla which will set sail overnight for France for the international commemorations on D-Day.

A flotilla of Royal Navy vessels featuring HMS Bulwark will be accompanied by allied nation naval ships. On arrival they will be in position off those Normandy beaches from where the landings took place.

The eyes of the world will be focused on the five code-named beaches of Normandy as veterans will be joined by world leaders and figures to commemorate those who served. Among those gathering at the ceremonies will be Queen Elizabeth, President Barack Obama and French president François Hollande.

 

Published in News Update

#Philippines – According to the Royal Navy, HMS Illustrious (RO6) the helicopter-carrier as previously reported has arrived in the Philippines today to bring a further boost in the humanitarian relief effort.

The 22,500 tons 'Invincible' class carrier will take over from HMS Daring (D32) which has been distributing aid and assisting villagers in remote communities on islands to the north east of Panay for the past week.

Onboard the flight-deck of HMS Illustrious are seven helicopters which will play a pivotal role in carrying around 500 tonnes of UK Aid to communities.

The delivery of aid includes 12,500 blankets, 20,000 candles, 30,000 rice bags, 9,800 tins of sardines, 8100 tins of vegetables, 17,000 shelter kits, 1,000 jerry cans and 1900 water carriers.

The workload in transporting the aid quickly into remote areas will be carried out by three Sea King Mark 4s, one Merlin and three Army Lynx.

The carrier was around 6000 nautical miles away in the Horn of Africa on counter-piracy operations as part of the Royal Navy's Response Force Task Group when she was re-tasked with the humanitarian aid operation.

 

Published in News Update

#Philippines – The Royal Navy's helicopter-carrier HMS Illustrious (R06) which visited Dublin Port in April is heading for the Philippines to bolster efforts to help those in the wake of Typhoon Haiyan.

UK Prime Minister David Cameron yesterday ordered that the former aircraft-carrier which was on a counter-piracy patrol off Somalia to break-off and make the 4,500-mile journey to the Far East.

HMS Illustrious has around nine days to reach the stricken nations central islands. She follows destroyer HMS Daring which is just around a day away from the worst-affected area and ready to begin her relief mission.

In addition Mr. Cameron has pledged £10m in aid and dispatching two RAF C17 Globemaster transporter aircraft which will also support the relief operation, codenamed Operation Patwi.

HMS Darling had departed Singapore on a mercy dash across the South China Sea and Pacific. The 8,000 tons destroyer was five months into a nine-month global deployment that included an international naval exercise Bersama Lima.

The Portsmouth-based Type 45 destroyer has a large flight deck to accommodate helicopters (up to the size of a Chinook), which will be vital for this latest disaster relief role. The destroyer's multi-purpose role demonstrates the global capability in providing humanitarian aid after natural disasters.

She is the first of the six Type 45 destroyers, each costing £1bn and they are the most advanced warships the Royal Navy has ever had built. She was launched at BAE Systems Scotstoun shipyard on the Clyde, one of three Scottish facilities to remain as centres of naval shipbuilding in the UK, following widespread cut to jobs.

 

Published in News Update

#EmerNIGERIA – The former Naval Service OPV L.E. Emer took the short journey between the Naval Base on Haulbowline Island to Cork Dockyard Ltd today for upgrading work for her new owners, writes Jehan Ashmore.

The 65m vessel was brought at public auction last month for €320,000 by Nigerian based Uniglobe Group and is to be used for work in the Niger Delta.

For now she is likely to remain at the dockyard into next month before finally departing from the Rushbrooke facility. She was launched in 1978 from the same site when Verolme Cork Dockyard had run the shipbuilding business that saw five patrol vessels commissioned for the Naval Service.

Her new owner Mr. Imhobio who is a resident for parts of the year in London had said the ship may call to capital. The decision to make an en-route call to the capital though remains subject to the cost of the diversion in both time and miles as part of her repositioning voyage to Nigeria.

 

Published in News Update

#QEaircraftcarriers - On Armistice Day the massive hull of the Royal Navy's newbuild 65,000 tonnes aircraft-carrier HMS Queen Elizabeth, was finally completed with the 'ski-ramp' slotted into place at Rosyth Dockyard, writes Jehan Ashmore.

The facility on the Forth of Fife is one of three Scottish shipyards that despite job losses are to remain open in the UK and continue building warships for the Royal Navy, following recent plans to close the shipyard in Portsmouth in 2014.

The momentous occasion saw the installation of the 130-tonne section ski-ramp which is designed to assist the F35 Lightning IIs to get airborne off the expansive flight deck of the Royal Navy's future flagship.

Only the radar and lifts remain to be lifted into place by 'Goliath' not to be confused with the same namesake given to one of Harland & Wolff's giant yellow cranes. The Scottish 'Goliath' is superior in that the crane is the UK's largest, capable of boaring loads up to 1,000 tons.

The newbuild HMS Queen Elizabeth is the leadship of a pair "QE-Class" aircraft-carriers which is to be followed by HMS Prince of Wales. They will represent the biggest and most powerful surface warships ever constructed for the Royal Navy. HMS Queen Elizabeth after fitting-out and sea-trials is to scheduled to enter service in 2017.

The cost of new aircraft carriers is expected to be almost twice the original estimate in which the according to latest budget, the Ministry of Defence estimates the cost of the two ships at £6.2bn.

The QE –class replace the Invincible-class trio in which the 22,000 tonnes HMS Illustrious (RO6) remains the last in service albeit in the role as a converted helicopter carrier. As previously reported, HMS Illustrious paid a visit to Dublin Port in April and was illuminated in green for the Gathering.

To build the QE –class aircraft carriers which present complexity and challenges requires many skills and experience which led to the establishment of the Aircraft Carrier Alliance which is between BAE Systems, THALES and Babcock.

Of the 37 main sections that were constructed to assemble HMS Queen Elizabeth, yards including Babcock's Marine's north Devon shipyard in Appledore were involved in building sections. The sections were then transported by barge to the newbuild in Scotland.

Babcock won the €99m contract from the Irish Department of Defence to build a pair of OPV's currently under construction also in Devon for the Naval Service. The first of the enhanced 'Roisin' / OPV P90 class L.E. Samuel Beckett (P61) is due for delivery in early 2014.

Published in News Update

#UKyardClosure - Shipyard workers at BAE Systems, numbering 1,775 jobs are to lose their jobs in Scotland and England and end shipbuilding altogether at Portsmouth, writes BBC News.

The firm said 940 staff posts and 170 agency workers will go at the Portsmouth site, which will retain repairs and maintenance work.

Some 835 jobs will be lost at yards in Govan and Scotstoun, on the River Clyde in Glasgow, and Rosyth in Fife and at the firm's Filton office, near Bristol.
The cuts follow a drop in work after the end of aircraft carriers work.

BAE Systems employs a total of 4,400 people in shipbuilding in the UK, 1,200 in Portsmouth and 3,200 across Govan, Scotstoun, Rosyth and Filton.
The company said it had made the cuts because of a "significant" drop in demand.

The defence contractor and the Ministry of Defence (MoD) have together announced measures which they hope will offset the effect of the job cuts.

Among the plans are more than £100m of investment to expand the dockyard at Portsmouth.
Three new ocean-going Offshore Patrol Vessels for the Royal Navy will also be built at BAE's Govan and Scotstoun yards in Glasgow.
This could help sustain shipbuilding at the yards until work is due to begin on the Type 26 Global Combat ships.

BAE, which heads a consortium that includes Babcock and Thales UK, said it had agreed changes to the Queen Elizabeth-class aircraft carrier contract it signed with the MoD in 2009.
This would see the consortium's fee move to a 50-50 risk share arrangement which would provide greater cost performance incentives.

A statement released by BAE Systems said: "Under these proposals, shipbuilding operations at Portsmouth will cease in the second half of 2014.

For much more details on this major historic development in the British shipbuilding sector, BBC News Glasgow and West Scotland reports.

 

Published in News Update

#TrainForTrade- UNCTAD Candidates have successfully completed final dissertations last month for the TrainForTrade Port Training Programme in Ghana and which also includes Tanzania, as previously reported on Afloat.ie

The dissertations were defended before panels of experts that included representatives from UNCTAD and the Port of Cork, as well as senior managers from Ghana Ports and Harbours Authority (GPHA).

The graduates are middle-level managers from public and private entities operating at the ports of Tema and Takoradi.

UNCTAD's Port Training Programme supports port communities in developing countries in their efforts to provide efficient and competitive port management services.

The English-speaking network of the Port Training Programme is supported by Irish Aid, the Dublin Port Company, the Port of Cork, and the Belfast Harbour Commissioners.

 

Published in News Update

#UNCTADTanzania - Minister of State at the Department of Foreign Affairs and Trade, Joe Costello has completed a visit to the United Republic of Tanzania at which he reviewed the impact of the UNCTAD Port Training Programme.

Ireland has provided extensive support over the years for the Port Training Programme, which is part of UNCTAD's (United Nations Conference on Trade & Development) TrainForTrade technical assistance programme.

Financial support for the training is provided by Irish Aid - the Irish Government's programme of assistance to developing countries. Supporting the programme are the Dublin Port Company and the Port of Cork in addition to the Belfast Harbour Commissioners.

During his official visit to the East African nation, the Minister, met with representatives of Tanzania Ports Authority and toured the port of Dar es Salaam. He and his delegation were received by the Acting Director General of Tanzania Ports Authority, Mr. M. J. Kipande, and his management team.

Published in News Update
Page 4 of 7

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023