Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: port of Cork

The Port of Cork has welcomed CLdN’s decision to add a second weekly call from Cork to Zeebrugge to cope with the increasing demand on the current route. Adding a second call will offer CLdN customers a quicker turnaround, as well as bypassing the UK land bridge and avoiding unnecessary border checks, ensuring cargo flows more effectively and in a cost-efficient manner from Ireland direct to the continent.

The Cork to Zeebrugge Ro-Con service which started in May, as Afloat reported here, has been very popular with customers, who now welcome the second service offering them even more flexibility.

Conor Mowlds, Port of Cork Chief Commercial Officer said: ‘This is very exciting news for Cork and indeed importers and exporters utilising the current service. Added frequency offers flexibility and with more and more cargo looking to avoid the UK land bridge, this second Cork to Zeebrugge service is another step forward in ensuring supply chains are maintained.’

The cargo supply vessel Evita moored in Cork Harbour this week. The Port of Cork is Ireland’s primary southern gatewayThe cargo supply vessel Evita moored in Cork Harbour this week. The Port of Cork is Ireland’s primary southern gateway Photo: Bob Bateman

He continued: ‘In these extraordinary times a second direct Ro-Con freight link with Europe from Cork, Ireland’s primary southern gateway reinforces our commitment to supporting businesses in the region and preparing for any eventuality Brexit may bring.’

A spokesperson from CLdN stated: ‘As we have shown and continue to deliver, we will deploy larger vessels or add more frequency to match demand to and from Ireland and will react immediately the market signals a requirement, as we see the Irish market as a core route in our portfolio.’

Published in Port of Cork
Tagged under

There are busy scenes at the Port of Cork this week where Liebherr cranes are being assembled before shipment at Cork Dockyard later this month.

Eight Liebherr 'Ready to Go' (RTGs) have been assembled and are being finalised for sea transport to DPWorld Somaliland, according to social media posts by Liebherr Maritime Ltd.

On Saturday, (17th October 2020) Cork Harbour also welcomed Independent Quest, her maiden visit to Cork as part of the new Trans Atlantic-Ireland shipping route.

Progress continues on the development of the new Port of Cork terminal with the two new Liebherr post-Panamax size ship-to-shore (STS) container gantry cranes (centre) and Pont Aven ferry in berth (right)Progress continues on the development of the new Port of Cork terminal with the two new Liebherr post-Panamax size ship-to-shore (STS) container gantry cranes (left) and Pont Aven ferry in berth (right) Photo: Bob Bateman.

As Afloat reported previously, progress also continues apace at the new Port of Cork Container terminal in Ringaskiddy with the new giant gantry cranes at work, a clear sign of headway at the Terminal. The cranes improve liners’ schedule reliability and reduce trade costs, and inventory holding outlays for shippers.

The Port is investing €80 million in the new terminal It offers a 360-metre quay with 13-metre depth alongside and enables larger ships to berth in the port.

Pont Aven ferry and Independent Quest cargo safely docked after a passage from USA Photo: Bob BatemanPont Aven ferry (left) and Independent Quest cargo ship (right) safely docked after passage from USA Photo: Bob Bateman

Published in Port of Cork
Tagged under

The two new Liebherr post-Panamax size ship-to-shore (STS) container gantry cranes make an impressive sight cutting the Cork Harbour skyline at the Cork Container Terminal (CCT) in the Republic of Ireland.

Port of Cork took delivery of the gantry cranes at the terminal in February this year and they were assembled on-site as Afloat reported here.

The cranes improve liners’ schedule reliability and reduce trade costs and inventory holding outlays for shippers.

Post Panamax Port of Cork CranesThe post-Panamax Port of Cork Cranes Photo: Bob Bateman

More Liebherr cranes are currently being assembled at Cork Dockyard in the harbour as Afloat reports here.

Construction on CCT began in June 2019 and will finish in 2020. The €80m project will initially offer a 360-metre-long quay with a 13-metre depth alongside.

The Cork Harbour development also includes the construction of a 13.5-hectare terminal and associated buildings.

Published in Port of Cork
Tagged under

The Port of Cork Company has appointed Eoin McGettigan to the role of Chief Executive of the company. Eoin replaces Brendan Keating who retired recently after 18 years of service as CEO.

The Chairman of the Port of Cork Company, John Mullins stated that ‘Brendan Keating made an outstanding contribution to the Port as Chief Executive since 2002. Brendan has seen the Port’s Strategic Development Plan fully recognised: the acquisition of Belvelly Port Facility (formerly Marino Point), the Inner Harbour Development at Bantry Bay Port Company, the marked increase in cruise business and the commencement of construction of the €86 million Cork Container Terminal in Ringaskiddy which will future proof the port. I have no doubt that Eoin will now take these projects and the business forward to further enable our growing economy.’

Eoin has spent the last decade providing strategic advice to a wide variety of companies. He has thirty years’ experience as a Senior Executive in Retail, Wholesale and Property businesses. He has held senior board positions in Musgrave PLC as Chief Executive of Supervalu Centra, Director of Dunnes Stores and Director of Reox Holdings PLC. Eoin and his family have lived in Cork for over 30 years.

John Mullins said: ‘Eoin brings with him a wealth of Senior Executive experience, excellent leadership skills and an integral knowledge of modern supply chains and logistics. He joins the Port at a strategic and exciting time for the company and the Southern region. The board and all in the Port company wish him every success.’

He added “Eoin will steward the company from the River to the Sea through the commissioning of key infrastructure in the lower harbour whilst making available former assets for critical residential and commercial development. Eoin’s property experience will be instrumental in ensuring that Tivoli will be one of the most exciting projects in the future for the company and for the City of Cork.’

Eoin McGettigan takes up the position as Chief Executive on 1st October 2020 for a term of five years.

Published in Port of Cork
Tagged under

As Afloat reported in July, the new public recreation area at Paddy's Point in Cork Harbour now has a new floating pontoon added to the existing marine leisure facilities at Ringaskiddy.

As it turns out, the new facilities were about to be put to championship use in August to handle a fleet at the Laser National Championships until the event had to be cancelled by Royal Cork Yacht Club due to COVID concerns. 

The pier and slipway, that opened in May 2019 is located adjacent to the Beaufort Building in Ringaskiddy and is managed and maintained by the Port of Cork.

The substantial new facilities replace the existing Ringaskiddy slipway and pier and were completed as part of the Cork container terminal development.

The 'Paddy's Point' Pontoon jetty in Cork HarbourThis new marine leisure facility is free for the public to use and includes a pontoon to launch leisure craft Photo: Bob Bateman

These latest photos of Paddy's Point further illustrate what a fine structure is now in situ and what a welcome addition it is to Cork Harbour's marine infrastructure. 

Published in Cork Harbour

The Port of Cork has announced the start of a new weekly direct service from Cork to USA, giving Ireland its first direct container service to the USA in many years.

The new Cork Harbour service is set to commence with the sailing of the ‘Independent Vision’ on June 6th. ICL will sail from the Port of Cork every Saturday arriving on the East Coast of the USA 10 days later, offering Irish exporters the most reliable and fastest delivery times for their supply chains.

CEO of the Port of Cork, Brendan Keating said: ‘The Port of Cork is delighted with this opportunity to work with ICL and support this new direct route to the US. The timing is perfect with the opening of our new €80 million Cork Container Terminal in Ringaskiddy on the horizon and has the potential to grow cargo volumes from and to Ireland. This is a fantastic strategic development for the Port of Cork as we look to develop Ringaskiddy as a modern logistics hub.’

CEO of ICL John Kirkland said: “Ireland is a market we have been keen to develop for a while and we sincerely hope the Irish trade support this commitment by ICL, to bring Ireland its first direct weekly service to the USA East Coast. We look forward to working with the Port of Cork with their exciting expansion plans”

ICL has been serving the North Atlantic trade for 35 years and is consistently named the most reliable carrier.

Published in Port of Cork
Tagged under

A survey by international transport engineering and consulting group SYSTRA, into the Port of Cork’s export and import facilities has yielded very positive results. Those surveyed, predominately LoLo HGV drivers, noted the Port’s desirable location, timesaving vehicle booking system, and efficient gate operations.

The forthcoming transfer of container operations from Tivoli to Ringaskiddy generated improved sentiment with positivity increasing by 42% since the initial 2015 survey. The redevelopment of Ringaskiddy and arrival of the new €80m Cork Container Terminal, Western Europe’s newest container terminal, garnered positive opinion as a “brilliant idea” with its “better location” from respondents. CCT will allow the port to handle larger vessels and facilitates the move from a river port to a deepwater port in order to future proof the Port of Cork.

The Vehicle Booking System (VBS), implemented in 2018 and a key component of the Port’s mobility management plan, was commended by 96% of respondents. Hauliers frequently highlighted the shorter turnaround times, and a substantial percentage observed reductions in queuing time. To date, the Port of Cork has invested over €1 million on trialling and implementing the traffic management plan with Cork County Council in order to minimise the impact of port-related traffic on local road networks.

The survey also highlighted what hauliers would like to see improved. Most notably, there was a strong desire to reduce traffic congestion and to see the upgrade of the N28 motorway become a reality. The Port of Cork fully recognises these concerns, and will continue to fully support the relevant agencies to do what’s needed to unlock Munster and Ireland’s latent economic growth.

Capt. Paul O'Regan, Harbour Master and Chief Operations Officer of Port of Cork, commented: “The 2015 survey offered some real insight into areas of growth for us. Although we are pleased that our hard work has paid off in many areas, we won’t be resting on our laurels. The insights we’ve gained from this report will further improve our resiliency, and we remain confident that we can continue to manage the disruption stemming from Covid-19 and keep Munster’s supply chain moving”.
Conor Mowlds, Chief Commercial Officer of the Port of Cork added: “We’re pleased with the positive responses from hauliers who use the port regularly. The VBS results were a particular highlight. It has consistently reduced queuing, lowered emissions, and improved turnaround times. Technological innovations, such as VBS, are ensuring that we can safely and efficiently maintain the flow of essential goods to southern Ireland in these unprecedented times.”

SYSTRA was commissioned by the Port of Cork to undertake the survey at Tivoli docks in order to develop a comprehensive understanding of the current container operations customer base, and to capture these customers’ views and opinions of Tivoli docks and the transfer of the container terminal from Tivoli to Ringaskiddy. A similar exercise was undertaken by SYSTRA in 2015.

Published in Port of Cork
Tagged under

Operators of Dublin and Cork ports have said imports of food and other essential items have increased since the Covid-19 outbreak here over a month ago.

According to RTE News, the ports said contingencies are in place to ensure ports stay open and supply chains remain intact.

Their trading figures indicate the Covid-19 outbreak has seen increased demand for food and other essential items.

This is backed up by evidence of panic buying and empty supermarket shelves.

The Port of Cork insists that trade is up and supply chains have been unaffected by the coronavirus outbreak.

At Cork's deep water terminal in Ringaskiddy, unloading of a Portuguese cargo ship, AS Petronia, began at 5am.

The ship left Costa Rica in Central America a fortnight ago, and tied up in Ringaskiddy in the early hours of this morning.

Ireland is its first port of call. The ship is carrying more than 2,000 shipping containers which are destined for ports all over Europe.

There were around 100 shipping containers for Ireland on board, carrying mangos, melons and pineapples, along with four million bananas - a mere week's supply to keep this country going.

More on this story by clicking here.

Published in Irish Ports

The Port of Cork have been informed by Brittany Ferries that the weekly Ro-Pax ferry service from Cork to Santander which includes a midweek Roscoff sailing is to cease operating. In a statement, the Port said: 'This surprising decision by Brittany Ferries is very disappointing, however, we will continue to pursue other options for linking Cork and Northern Spain".

As Afloat reported yesterday, Brittany Ferries is believed to be looking at moving the operation to Rosslare Harbour.

A Port spokesman added: "We remain supportive of Brittany Ferries who have operated out of Cork for over 40 years and we will continue to facilitate Brittany Ferries on their weekly service from Cork to Roscoff re-commencing in March 2020"

Published in Brittany Ferries
Tagged under

The Port of Cork has reported that the combined total traffic through both the Port of Cork and Bantry Bay Port Company took a dip of 5% from 10.6 million tonnes, to just over 10 million tonnes in 2019. The cause for this minor decline is attributed to less volumes of dry bulk cargo through the port. Overall total imports decreased by 7% while exports decreased by 3%.

A key area, particularly for the Port of Cork as they look to complete and open Cork Container Terminal in 2020, was the continued increase in container or LoLo traffic in 2019. Over 240,000 TEUS were handled in 2019, a 5% increase on the previous year.

Brendan Keating, Port of Cork Chief Executive said: ‘2020 will be a significant year for the Port of Cork as we prepare to complete and open the €86 million Cork Container Terminal development in Ringaskiddy, so seeing continued growth in container volumes through both Tivoli and Ringaskiddy is very encouraging.’

"2020 will be a significant year for the Port of Cork as we prepare to complete and open the €86 million Cork Container Terminal development in Ringaskiddy"

He continued: ‘Once operational the new terminal will enable the port to handle up to 450,000 TEU per annum. We already possess significant natural depth in Cork harbour, and our work in Ringaskiddy Port will enable us to accommodate vessels of 5500 to 6000 TEU, which will provide us with a great deal of additional potential for increasing container traffic.’

In 2019 oil traffic handled through Whitegate Oil Refinery owned by Canadian company Irving Oil, saw a decrease of 9% partially due to a planned maintenance shut down in August.

In 2019 the Port of Cork handled 100 cruise liners bringing over 243,000 passengers and crew to the region, while Bantry Bay Port Company welcomed 10 cruise liners to the harbour town. In 2020 a record 102 cruise ships are scheduled to call between March and December.

The Port of Cork jointly with Lanber Holdings purchased Marino Point in 2017 and following consultation with Belvelly Marino Development Company, stakeholders, residents and a design team, the Belvelly Port Facility Masterplan was developed. The masterplan sets out the strategic approach of Belvelly Marino Development Company and is a guide to the future development of Belvelly Port Facility. It is envisaged that Marino Point will be developed to accommodate a range of industrial and port related activities and could become a dynamic industrial hub for the area, thus creating employment.

Brendan Keating said: ‘As part of the Project Ireland 2040 National Planning Framework, one of the key future growth enablers for Cork is to deliver large scale regeneration projects for the provision of new employment and supporting infrastructure in Cork Docklands, as integrated, sustainable developments, including relocation of sites from the City Docks. Belvelly Port Facility has been identified to enable this type of growth.’

Published in Port of Cork
Tagged under
Page 5 of 30

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023