Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Griffith Bridge

#grandcanal – Waterways Ireland advises masters and owners that a small unidentified sailing vessel is sunk in Shannon Harbour approx. 500 metres East of Griffith Bridge on the south bank.

The vessel is an obstruction to navigation.

The mast is lying across the navigational channel, however, the vessel may be passed with due caution. It is planned to remove the vessel on Friday morning, 28th Feb 2014.

Published in Inland Waterways
Waterways Ireland has issued a notice tu users of the Grand Canal on the inland waterways that a section of the canal, extending from the 34th Lock to the 35th Lock inclusive, will be closed to navigation between 1st November 2010 and 14th March 2011 to facilitate the following improvement works to the Shannon Harbour area:

PROVISION OF HOUSE BOAT BERTHING AREA

The works site will extend from Griffith Bridge for approximately 350m eastwards of the bridge. Temporary dams will be constructed in the vicinity of this site. Due to low and/or possibly fluctuating water levels between the site and the 34th Lock, it is strongly advised that boats should not be moored between the site and the 34th Lock. Adequate berthage is available East of the 34th Lock. There will be no pedestrian or vehicular access through the work site. Pedestrian and vehicular entry/exit access will be via the south canal bank at L'Estrange Bridge for the duration of the works.

TRANS-SHIPMENT SHED CANOPY REMOVAL AND ASSOCIATED REMEDIAL WORKS
These works will extend for a period of approximately six weeks from November 1st 2010. Boats will not be permitted to moor in the vicinity of the work site during this period. The work site will extend from the 35th Lock for approximately 125m Eastwards, to a point approximately 15m beyond the Eastern gable of the trans-shipment shed. There will be no vessel mooring in the vicinity of the work site. There will be no pedestrian or vehicular access along the northerly canal bank from Griffith Bridge towards the 35th and 36th Locks for the site work duration.

Published in Inland Waterways

Waterways Ireland has issued a notice to users of the Grand Canal of its intention to carry out new inland waterways works by way of provision of house boat berths at Shannon Harbour, Co.Offaly.

The work site will be from Griffith Bridge to a point approximately 200m eastwards of the bridge. A temporary dam will be constructed in the vicinity of this site which will close the canal to navigation at this location.

The work is expected to commence in Oct 2010 and be completed by Mar 2011. Any owners planning to transit the canal at this time should take into account this closure, say the Waterways body.

 

Published in Inland Waterways

Featured Sailing School

INSS sidebutton

Featured Clubs

dbsc mainbutton
Howth Yacht Club
Kinsale Yacht Club
National Yacht Club
Royal Cork Yacht Club
Royal Irish Yacht club
Royal Saint George Yacht Club

Featured Brokers

leinster sidebutton

Featured Webcams

Featured Associations

ISA sidebutton
ICRA
isora sidebutton

Featured Marinas

dlmarina sidebutton

Featured Sailmakers

northsails sidebutton
uksails sidebutton
quantum sidebutton
watson sidebutton

Featured Chandleries

CHMarine Afloat logo
https://afloat.ie/resources/marine-industry-news/viking-marine

Featured Blogs

W M Nixon - Sailing on Saturday
podcast sidebutton
BSB sidebutton
wavelengths sidebutton
 

Please show your support for Afloat by donating