Energia intends to deploy marine acoustic monitoring equipment off the coasts of Co Waterford and Co Wexford between now and 24 February, subject to weather and operational constraints.
The deployments are part of works for Energia’s North Celtic Sea and South Irish Sea offshore wind projects in these respective areas.
The North Celtic Sea is a renewable energy project proposed to be located a minimum of 10km and up to 25km off the Co Waterford Coast. The South Irish Sea project, meanwhile, is proposed to be located a minimum of 10km and up to 25km off the coasts of Wexford and south Wicklow.
Acoustic monitoring equipment will remain on site for a period of three to four months, weather window permitting. After this period the devices will be retrieved and redeployed at new locations, that will continue to cover a 12-month period.
The equipment consists of four acoustic devices and their moorings, which will be used to monitor for marine mammal activity in the proposed wind park areas.
Deployments in both areas will be conducted by the MV Sharp Shooter (callsign EI5069). As this vessel will be deploying survey equipment, it will be restricted in its ability to manoeuvre. All other vessels are requested to leave a wide berth during the operations and pass at minimum speed to reduce vessel wash.
The MV Sharp Shooter will be monitoring VHF Channel 16 and Working on VHF Channel 6. All operations will be during the hours of daylight only. Throughout survey operations, the vessels will be displaying the appropriate lights and shapes.
For more on the acoustic devices, their planned locations, relevant maps and contact details, see Marine Notice No 5 of 2023 and Marine Notice No 6 of 2023, attached below.