Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Erin Barry

#ROWING: Eimear Lambe and Jasmine English qualified directly for the semi-finals of the women’s double sculls at the European Junior Rowing Championships in Hazewinkel in Belgium today. The Ireland crew finished second to Romania and will compete next tomorrow morning.

Ireland’s three other crews must compete in repechages. The men’s double of Conor Carmody and David O’Malley finished fourth in their heat; while the junior men’s pair of David and Brian Keohane fifth and single sculler Erin Barry both finished fifth.

European Junior Rowing Championships, Hazewinkel, Belgium (Irish interest):

Men

Pair – Heat Two (First Two Directly to A/B Semi-Finals: 5 Ireland (D Keohane, B Keohane) 7:30.39.

Double Sculls – Heat Three (First directly to A/B semi-finals): 4 Ireland (C Carmody, D O’Malley) 6:56.91.

Women

Double Sculls – Heat One (First Two Directly to A/B Semi-Finals): 2 Ireland (J English, E Lambe) 7:54.10.

Single Sculls – Heat Three (First Two directly to A/B Semi-finals): 5 Ireland (E Barry) 8:38.33.

Published in Rowing

#BelfastIndoorRowing: Erin Barry, a junior 16 athlete, set an excellent time of seven minutes 2.1 seconds for the 2,000 metres at the Belfast Indoor Rowing Event today. Barry, from the Bann club in Coleraine, was over 30 seconds faster than her nearest rival. One of the top performers from the Irish Indoor Championships last week, Sam McKeown from Portadown, was entered but did not take part. The event served as part of the Ireland trialling system and a round of the British University indoor series.

 

UIR 2013 Nov 30
RESULTS INFO
2000m 1005 R1 W U16 Drag 120
Best from Limerick WU16 7:22.7 MANUAL SPLITS eg 00:03:55.4
LANE CODE RACE NAME 500 1000 1500 2000
1 1 Barry BANN W U16 07:02.1
2 2 DeSay NEPTUNE W U16 DNS
3 3 Clarke PORTORA W U16 07:39.2
4 4 Shirlow BANN W U16 07:36.0
5 5 McGrath CARLOW W U16 07:53.8
6 6 Walker P'DOWN W U16 08:21.9
7 0 7
8 0 8
9 0 9
10 0 10
11 0 11
12 0 12
2000m 1025 R2 W U16_Olwt Drag 120 LWW 125
Best from Limerick WOL 7:18.1 MANUAL SPLITS
LANE CODE RACE NAME 500 1000 1500 2000
1 1
2 2
3 3
4 4
5 8 McCann P'DOWN W U16 DNF
6 2 DeSay NEPTUNE W U16 08:40.9
7 7 mullan BANN W U16 07:45.5
8 8
9 9 chestnutt BANN W U16 07:54.5
10 10 scott BANN W U16 07:53.8
11 11 Watson QULBC W OLwt 08:15.5
12 12 Cunningham QULBC W OLwt 00:05.6
2000m 1045 R3 M U16 Drag 130
Best from Limerick 6:32.6 MANUAL SPLITS
LANE CODE RACE NAME 500 1000 1500 2000
1 13 MITCHELL BANN M U16 06:35.9
2 14 DAVIDSON BANN M U16 06:55.9
3 15 PARISH BANN M U16 06:48.8
4 16 CHRISTIE BANN M U16 06:56.5
5 0 5
6 0 6
7 0 7
8 0 8
9 0 9
10 0 10
11 0 11
12 0 12
UIR 2013 Nov 30
1000m 1105 R4 W U15_M50+ Drag free
Best from Limerick 3:45.8 MANUAL SPLITS
LANE CODE RACE NAME 500 1000
1 17 Coulter BELFAST RC W U15 04:09.5
2 18 Taylor BELFAST RC W U15 04:00.3
3 19 McIntyre LAGAN SC W U15 04:04.4
4 20 Hobson BELFAST RC W U15 04:02.8
5 21 White BELFAST RC W U15 DNF
6 22 Booth STRANMILLIS M 50+ DNS
7 0 7
8 0 8
9 0 9
10 0 10
11 0 11
12 0 12
2000m 1145 R5a W U18 Comb Drag 120
Best from Limerick 7:15.2 MANUAL SPLITS
LANE CODE RACE NAME 500 1000 1500 2000
1 23 English BBC-TALENT W U18 07:17.9
2 24 Connolly NEPTUNE W U18 07:37.9
3 25 morelli BANN W U18 07:49.4
4 26 Turner BBC-TALENT W U18 07:36.7
5 27 Coleman NEPTUNE W U18 07:49.2
6 28 Martin P'DOWN W U18 08:46.3
7 29 wray BANN W U18 07:40.2
8 30 Glover PORTORA W U18 07:45.9
9 31 Blundell BBC-TALENT W U18 08:01.7
10 32 Byrne NEPTUNE W U18 07:46.3
11 33 Flack P'DOWN W U18 08:40.5
12 35 Smylie P'DOWN W U18 08:09.2
2000m 1205 R7 W OLwt_U23Lwt Drag 120 BUCS 125 lanes 3,4,5
Best from Limerick WU23L 7:25.3 MANUAL SPLITS
LANE CODE RACE NAME 500 1000 1500 2000
1 36 Quinn BBC-TALENT W OLwt 07:18.1
2 37 Cameron BBC-TALENT W OLwt 07:33.5
3 38 Elliot QULBC W OLwt 08:11.8
4 39 Flynn QULBC W OLwt 08:44.7
5 40 Todd QULBC W OLwt 08:11.1
6 41 Morris DULBC W U23Lwt 07:27.2
7 42 Maguire QULBC W U23Lwt DNS
8 0 8
9 0 9
10 0 10
11 0 11
12 0 12
UIR 2013 Nov 30
2000m R8 M U18 Drag 130
Best from Limerick 6:25.2 MANUAL SPLITS
LANE CODE RACE NAME 500 1000 1500 2000
1 43 Meenagh CAI M U18 07:16.8
2 44 Murray BBC-TALENT M U18 06:33.6
3 45 Murray PORTORA M U18 06:38.2
4 46 Curran CARLOW M U18 DNS
5 47 Carroll COMMERCIAL M U18 07:08.2
6 48 McKillen QUBBC M U18 06:19.7
7 49 Chambers P'DOWN M U18 07:33.6
8 50 Doyle NEPTUNE M U18 DNS
9 51 Mullan CAI M U18 06:57.0
10 52 Rix PORTORA M U18 06:31.3
11 53 Nolan CARLOW M U18 DNS
12 0 12
2000m 1245 R9 M U18 Drag 130
Best from Limerick 6:25.2 MANUAL SPLITS
LANE CODE RACE NAME 500 1000 1500 2000
1 54 Keenan COMMERCIAL M U18 06:49.1
2 55 Ferguson P'DOWN M U18 07:45.7
3 56 Simpson CAI M U18 07:17.9
4 57 Taggart CAI M U18 DNS
5 58 Dunne COMMERCIAL M U18 06:58.0
6 59 Kerr P'DOWN M U18 08:07.0
7 60 McCaughtry BELFAST RC M U18 07:24.4
8 61 Bassett P'DOWN M U18 07:40.8
9 62 Kennedy CAI M U18 06:48.3
10 0 10
11 0 11
12 0 12
1000m 1305 R10 W Beginner Drag 130
MANUAL SPLITS
LANE CODE RACE NAME 500 1000
1 63 Murdoch QULBC begW 04:18.2
2 64 Chapman QULBC begW 03:46.0
3 65 McGaughey QULBC begW 04:35.3
4 66 Laverty QULBC begW 04:27.8
5 67 Mullen QULBC begW 04:04.4
6 68 Whittaker QULBC begW DNS
7 69 Hinds QULBC begW 04:31.4
8 70 Fordwar QULBC begW 04:19.4
9 71 Burnside QULBC begW 04:12.1
10 72 Victoria QULBC begW 04:17.9
11 73 Kelly QULBC begW 04:03.0
12 74 McBrien QULBC begW 04:08.6
UIR 2013 Nov 30
1000m R11 W Beginner Drag 130
MANUAL SPLITS
LANE CODE RACE NAME 500 1000
1 75 Fisher QULBC begW 04:13.7
2 76 Goodwin QULBC begW 04:28.8
3 77 Kelso QULBC begW 04:03.0
4 78 Copeland QULBC begW 04:33.3
5 79 Niamh QULBC begW 04:06.5
6 80 McI QULBC begW 04:10.8
7 81 Simpson QULBC begW 04:53.9
8 82 Kelly QULBC begW 04:05.7
9 83 Willis QULBC begW 04:06.5
10 84 Baxter QULBC begW DNS
11 85 Mary Claire QULBC begW DNS
12 86 Davis QULBC begW DNS
2000m 1335 R12 W O Drag 130 BUCS
Best from Limerick 6:53.2 MANUAL SPLITS
LANE CODE RACE NAME 500 1000 1500 2000
1 87 McPherson QULBC W O 08:16.1
2 88 Taylor QULBC W O 07:51.8
3 89 Maguire QULBC W O 07:49.2
4 90 Thornton QULBC W O 07:50.6
5 91 McGookin QULBC W O 07:47.7
6 92 Bossmann QULBC W O DNS
7 93 Abbott QULBC W O 08:25.1
8 94 Brown QULBC W O 08:01.0
9 95 Doran QULBC W O DNS
10 96 Alicia QULBC W O 08:15.8
11 97 Holmes QULBC W O 08:20.1
12 0 12
2000m 1355 R13a M 23Lwt_OL_MO_M23 Drag 130 (BUCS)
Best from Limerick 23L 6:28.3 OL 6:19.1 MANUAL SPLITS
LANE CODE RACE NAME 500 1000 1500 2000
1 98 mcafee BANN M U23Lwt 06:30.9
2 99 Hetherington ANGLIA RUSK M U23Lwt 06:42.4
3 100 McCann QUBBC M OLwt 06:46.2
4 101 McMullan QUBBC M OLwt 06:44.6
5
6 103 Armstrong QUBBC M OLwt 06:39.5
7 104 Evans QUBBC M OLwt 07:14.5
8
9 106 Moneypenney P'DOWN M O 06:51.4
10 109 Moran QUBBC M O 07:00.4
11 111 Magill QUBBC M U23 06:36.1
12 102 Abel QUBBC M OLwt 07:07.6
UIR 2013 Nov 30
1000m 1435 R15 M Beginner Drag 138
MANUAL SPLITS
LANE CODE RACE NAME 500 1000
1 113 Gallagher QUBBC begM 03:22.2
2 114 Gray QUBBC begM DNS
3 115 McClure QUBBC begM DNS
4 116 McCormack QUBBC begM 03:24.5
5 117 Murray QUBBC begM 03:15.8
6 118 Rice QUBBC begM 05:21.6
7 119 Leonard QUBBC begM 03:31.1
8 120 Sloan QUBBC begM DNS
9 121 Troughton QUBBC begM 03:34.5
10 122 Connolly QUBBC begM DNS
11 123 Doherty QUBBC begM DNS
12 124 Stevenson QUBBC begM DNS
1000m 1450 R16 M Beginner Drag 138
MANUAL SPLITS
LANE CODE RACE NAME 500 1000
1 125 Breslin QUBBC begM 03:37.6
2 126 Herron QUBBC begM 03:29.2
3 127 McClure QUBBC begM 03:45.2
4 128 Erskine QUBBC begM 03:19.4
5 129 Smith QUBBC begM 03:38.1
6 130 Sets QUBBC begM 03:19.4
7 131 Duffin QUBBC begM 03:50.1
8 132 Thompson QUBBC begM 03:38.3
9 133 Henry QUBBC begM 04:03.7
10 134 Vincent QUBBC begM 03:15.9
11 135 White QUBBC begM 03:21.2
12 136 Allen QUBBC begM 03:49.8
1000m 1520 R18 M Beginner Drag 138
MANUAL SPLITS
LANE CODE RACE NAME 500 1000
1 147 Graham QUBBC begM 03:16.6
2 148 McConnell QUBBC begM 03:57.7
3 149 Doyle QUBBC begM 03:07.7
4 150 Patton QUBBC begM 03:09.9
5 151 Lisowski QUBBC begM 03:19.3
6 152 Beatty QUBBC begM 03:23.2
7 153 Williamson QUBBC begM 03:23.8
8 154 J Kelly QUBBC begM 03:16.6
9 155 Brennan QUBBC begM 03:59.9
10 156 Machado QUBBC begM 03:37.4
11 0 Ruddy QUBBC begM 03:48.9
12 0 12
Published in Rowing

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020