Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: French Navy

#FrenchMineHunter - French Navy "tripartite" minehunter Andromède (M 643) is to be the third visitor by the nation to call to Dublin Port this year, writes Jehan Ashmore.

Unlike the Type A69 corvette FS Lieutenant de Vaisseau Lavallée (F 790) which berthed in the centre of Dublin Port last week, the minehunter is to dock closer to the city centre on the Liffey.

The design origins of the 51m minehunter stems from a commitment to construct a minehunter warfare vessel to meet the needs, share technologies and also reduce costs of building units for the French, Belgium and Dutch Navies.

Andromède has served globally among international operations in the Persian Gulf in 1991 having entered into commissioned service in 1984.

The 615 tonnes displacement minehunster was completed by la Direction des Constructions Navales (DCN) in Lorient, Brittany.

Published in Naval Visits

#FrenchCorvette – The French Navy are to return to Dublin Port as a Type A69 corvette FS Lieutenant de Vaisseau Lavallée (F 790) is to dock tomorrow, writes Jehan Ashmore.

Last month, the anti-submarine frigate FS Primauguet (D 644), made a four-day call to the capital having undertook exercises in the Norwegian fjords.

As for the FS Lieutenant de Vaisseau Lavallée she is also known as a D'Estienne d'Orves class corvette which entered service in 1980. The 1,250 tonnes corvette is armed with Excocet missiles and other defence attack systems. She is to berth at Ocean Pier, facing opposite the Poolbeg Yacht & Boat Club.

Her visit will also follow a German Navy Task Group which comprised of an oil replenishment, stores and equipment vessel and three frigates that called during the St. Patrick weekend.

 

Published in Naval Visits

#FrenchFrigate - FS Primauguet (D644), a French Navy 70 class anti-submarine frigate which last month undertook exercises in the Norwegian fjords, docked in Dublin Port for a four-day visit and is understood to be the first foreign caller this year, writes Jehan Ashmore.

The 139metres long vessel commissioned in 1986, has a crew of more than 500 who were deployed in Norwegian waters to operate with corvette Ravera as part of 'Operation Mangoose' .The 30-knot capable frigate's primary arsenal are excocet missiles and she carries up to 2 Lynx helicopters.

She berthed this morning at Ocean Pier, where the frigate is visible to motorists using the East-Link toll-lift bridge and notably can be seen from the Poolbeg Yacht Boat Club with its marina facilities facing the main channel of Dublin Port.

Published in Naval Visits

#FrenchFrigate - Dublin Port is to welcome La Motte-Picquet (D645) a French Navy frigate capable of 30 knots and a crew of more than 230 when she visits the capital next weekend, writes Jehan Ashmore.

Displaceming 4,010 tonnes the anti-submarine Type F70 frigate of the Georges Leygues class is to berth at Ocean Pier during her four-day call.

The 139m long frigate completed in 1985 at the Brest Naval Dockyard, has a comprehensive armament in addition to carrying 2x Lynx Mk 4 helicopters.

 

Published in Naval Visits

#FrenchNavy - The French Navy 'Tripartite' class mine warfare vessel Croix du Sud (M646) which has a hull constructed of composite polyester resin is to visit Dublin Port today, writes Jehan Ashmore.

The Tripartite class is a design collaboration of the French, Belgium and Dutch navy's. She displaces 615 tonnes and the vessel entered service in 1986.

Crew complement comprises of 5 senior officers, 32 officers and 12 trainee cadets.

She is scheduled to dock this morning and berth along Sir John Rogersons Quay and this evening be joined by a German Navy sail training vessel, the Asta.

 

Published in Naval Visits

#WW2schooner -A World War 2 schooner the Étoile (A649) now a French Navy Paimpolaise class cadet trainee vessel is due to make a call to Dublin Port on 'Bloomsday', writes Jehan Ashmore.

The near 81 year-old schooner or 'Goélettes' was launched in July 1932 at the Normandy shipyard of Chantiers Navals in Fécamp. She saw enemy action along with sister Belle-Poule (A650) having joined the Free French Forces.

In recognition of the pairs service during the war the schooners have the honour of flying the French flag with the cross of Lorraine.

The 275 tonnes schooner has a sail area of 450 m² and is also powered by a diesel motor. An officer has command of the 37m vessel and 15 crew.

 

Published in Naval Visits

#FrenchFrigate –French anti-submarine frigate De Grasse (D 612) is currently on a courtesy call to Dublin Port, having arrived yesterday for the St. Patrick's festival weekend, writes Jehan Ashmore.

A crew of more than 200 operate the 4,650 tonne displacement vessel which is based in Brest, where she is primarily deployed on operations along the Atlantic front.

The frigate was built in 1972 and entered service five years later. Among her armoury are 6 Exocet MM 38 missiles and there is a 155m² helicopter hanger, where she can carry up to two Lynx helicopters.

De Grasse is moored at Ocean Pier (berth 35) which is nearly opposite the Poolbeg Yacht & Boat Club Marina, Ringsend. She is scheduled to remain in port until Tuesday morning.

 

Published in Naval Visits

#FERRY SAILS – Ferry passengers perhaps on a mini-wine break cruise between Rosslare-Cherbourg may be taking a detour to the Cherbourg Nauting Boat Show which is been held this weekend, writes Jehan Ashmore.

Both Celtic Link Ferries and Irish Ferries operate on the continental route to the man-made Norman port originally constructed by Napoleon. The present day bustling town-centre of Cherbourg-Octeville to give its full name is close to the large 1500-plus berth marina at the Port Chantereyne which is hosting the show.

Those attending can buy and sell new and second-hand boats and where there will be exhibitors attending the three-day show which started yesterday. Activities include scuba-diving, dry surf, stand-up-paddle and model-boats on a dedicated pool.

In addition there is a guided-tour on a racing-boat commented by its skipper Eric D'Hooghe from the Figaro Race. Also making an appearance is the French rower Rémy Alnet who will be there to talk about his trans-Atlantic races.

Also on a related note is the La Cité de la Mer which is a museum situated in the former trans-Atlantic liner passenger terminal used during the so called golden era. The history of these liners is recalled in the museum and of course includes the RMS Titanic and the  French Line's famous France which as the Norway made a once off anchorage call outside Dun Laoghaire Harbour. 

In addition there are displays of submarines including the decomissioned French Navy nuclear-powered submarine Le Redoutable which is located in an adjoining dry-dock.

Published in Ferry

#NAVAL VISIT – A sistership of the French Naval patrol vessel that performed 'guardship' duties during last year's La Solitaire du Figaro Race to Dun Laoghaire (click HERE), is due to dock in Dublin Port in advance of St. Patrick's weekend, writes Jehan Ashmore.

PSP Pluvier (P678) is a 54m offshore patrol vessel (OPV) that belongs to a trio of the'Flamant' class, the remaining pair are the leadship PSP Flamant (P676) and PSP Cormoran (P677). The latter OPV escorted the race fleet on the second leg between Ouistreham (Caen) to Dun Laoghaire, the only international port of call of the prestigious race.

The naval visitor is the last of the sisters built and was constructed in Cherbourg at Chantier des Constructions Mécaniques de Normandie (CMN). She entered service in 1997 and carries out patrols in seas up to 200 nautical miles offshore of the French économique exclusive zone (ZEE).

She is scheduled to arrive on Thursday afternoon and berth at Sir John Rogersons Quay, downriver from the Samuel Beckett swing-bridge.

Published in Navy

#NAVAL VISITS - The first foreign naval visitors to Dublin Port in 2012 will be the French Navy, as five of an eight-strong class of school-training ships from Brest are due to dock on Friday, writes Jehan Ashmore.

The octet  belong to the Léopard class though the namesake leadship, Léopard (A 748) and Jaguar (A 750) will not be forming as part of the visiting flotilla.

Those that will be making the weekend port of call, berthing at Sir John Rogersons Quay will be Panthère (A 749) and Lynx (A 751) both commissioned in 1982 and the remaining quartet Guépard (A 752); Chacal (A 753); Tigre (A 754) and Lion (A 755) which entered service the following year. For a photo of the latter vessel and one of her sisters the Chacal click HERE.

Each of the 44 tonnes vessel's measure 17.5m long and have a beam of  6.40m and drawing a draft of 2.40m. To read more on the class characteristics click HERE.

The class follow in the wake of the last French Naval vessel to enter Dublin Bay, PSP Cormoran (P677). The OPV provided guard-ship duties when accompanying the Solitaire du Figaro race fleet during the stopover to Dun Laoghaire Harbour last August, as previously reported on Afloat.ie

Published in Navy
Page 3 of 4

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020