Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Limerick Regatta

26th April 2019

Limerick Regatta Cancelled

#Rowing: Plans to hold Limerick Regatta on Sunday have been abandoned. The regatta was scheduled for O’Brien’s Bridge on Saturday, but the forecast predicted the arrival of Storm Hannah. The organisers have announced that a proposal to move to Sunday faltered because they could not source an ambulance and safety launch for the venue at such short notice. They thanked those who entered.

Published in Rowing

#Rowing: Limerick Regatta may be moved to Sunday. The weather conditions for Saturday (April 27th) at O’Brien’s Bridge could be very poor. The organisers will make an announcement later this evening.

 

Published in Rowing
Tagged under

#Rowing: Kealan Mannix won both the senior and intermediate single sculls at Limerick Regatta today. The Skibbereen man was competing for University of Limerick, who also won in the senior fours. Muckross were the top men’s club eight, while Galway won the women’s intermediate and junior eights. Castleconnell were the top men’s junior 18 eight.

Limerick Regatta, Saturday (Selected Results):

Men

Eight – Club: Muckross. Junior 18: Castleconnell. Jun 16: Col Iognaid.

Four – Sen: University of Limerick. Inter, coxed: Clonmel. Jun 18A, coxed: Castleconnell.

Pair – Sen: Portadown.

Sculling, Quadruple – Novice, coxed: Univ of Limerick. Jun 18A: CRCC.

Double – Inter: St Michael’s B.

Single – Sen: Univ of Limerick (K Mannix). Inter: University of Limerick (K Mannix). Jun 18A: St Michael’s (R Spelman).  

Women

Eight – Inter: Galway. Jun 18: Galway. Jun 16: Commercial. Masters: University of Limerick.

Four – Inter, coxed: Fermoy. Jun 18: Shandon.  

Pair – Jun 18: CRCC.

Sculling, Quadruple – Jun 18: Castleconnell. Jun 16, coxed: Commercial A.

Double – Inter: St Michael’s.

Single – Inter: Castleconnell (C O’Brien). Jun 18A: Castleconnell (O’Brien).

Published in Rowing

#Rowing: Cork Boat Club had a good day at Limerick Regatta at O’Brien’s Bridge today. They won the the men’s intermediate eight and senior pair and the women’s junior 18 eight. UCD won the women’s novice eight and Daire Lynch of Clonmel, who won the single sculls time trial in a very fast time (five minutes and nine seconds), went on to take the senior and intermediate singles titles.

Limerick Regatta, O’Brien’s Bridge (Selected Results)

Men

Eight – Intermediate: Cork. Club: Neptune. Jun 18: Neptune. Masters – Final One (b-c): St Michael’s A. Final Two (d-e): Athlone. Jun 16: Col Iognaid.

Four – Sen: St Michael’s. Inter, coxed: Cork. Jun 18A, coxed: St Michael’s.

Pair – Senior: Cork. Jun 18: Clonmel.

Sculling

Quad – Sen: Carlow. Nov, coxed: UCC. Jun 18A: Carlow. Jun 16, coxed: CRCC.

Double – Inter: Castleconnell B.

Single – Senior: Clonmel (D Lynch). Inter: Clonmel (D Lynch). Jun 18A: Clonmel (A Butler). Jun 16: Castleconnell (R O’Neill). Masters – Final One: Lady Elizabeth (B Smyth). Final Two: Cork (B Crean). Final Three: Galway (A McCallion).

Women

Eight – Nov: UCD. Jun 18: Cork. Jun 16: St Michael’s.

Four – Sen: Shannon. Inter, coxed: Shannon. Jun 18: Col Iognaid.

Pair – Sen: Fermoy. Jun 18: Fermoy.

Sculling

Quadruple Novice, coxed: Cappoquin. Jun 18: Cork. Jun 16, coxed: Killorglin. Masters, coxed: Univ of Limerick

Double – Inter: Carlow.

Single – Inter: Garda (B Larsen). Jun 18A: Carlow (C Nolan). Jun 16: Cork (C O’Sullivan). Masters: Offaly (C Nolan).

Published in Rowing

#ROWING: Skibbereen won the men’s senior four and the intermediate coxed four at Limerick regatta at O'Brien's Bridge. Sam McKeown won the senior single sculls, beating Justin Ryan of Skibbereen, who has international experience as a lightweight sculler. Damien Kelly of Garda, who had finished second to McKeown in the intermediate final, was third. Portora had a day of wins at junior level, including the men’s and women’s junior 18 eights, the men’s junior 16 eight and the men’s junior 18 coxed quad and the women’s junior four and pair.

Limerick Regatta, O’Brien’s Bridge, Selected Results:

Men

Eight – Intermediate: 1 St Joseph’s, 2 St Michael’s. Junior 18: 1 Portora, 2 St Joseph’s, 3 St Michael’s. Junior 15: 1 St Joseph’s, 2 Shandon, 3 Portora.

Junior 16: 1 Portora, 2 Col Iognáid, 3 St Joseph’s. Masters: St Michael’s.

Four – Senior: 1 Skibbereen, 2 St Michael’s. Inter, coxed: 1 Skibbereen, 2 Portora, 3 St Michael’s. Jun 18A, coxed: 1 Portora A, 2 Athlunkard, 3 St Michael’s A.

Pair – Senior: 1 St Michael’s, 2 Neptune, 3 Shannon. Junior 18: 1 Athlunkard A, 2 Athlunkard B, 3 CAI B.

Sculling – Quadruple – Club Two: 1 Cork B, 2 Shandon, 3 Cork A. Junior 18A: 1 Cork A, 2 Lee, 3 Commercial. Jun 16, coxed: 1 Lee, 2 St Michael’s C, 3 Cork A. Jun 15, coxed, Final One: 1 Shandon A, 2 St Michael’s, 3 Killorglin. Final Two: Castleconnell.

Double – Inter: 1 Skibbereen, 2 Garda, 3 St Michael’s. Jun 15: 1 St Michael’s B, 2 Lee A, 3 Workmens.

Single – Senior: 1 Portadown (S McKeown), 2 Skibbereen (J Ryan), 3 Garda (Kelly). Intermediate: 1 Portadown (S McKeown), 2 Garda (D Kelly), 3 St Michael’s (D O’Connor). Novice: 1 Castleconnell (A Mozdzer), 2 Waterford (S O’Brien), 3 Lee (H Sutton). Junior 18: 1 Athlone (P Munnelly), 2 Graiguenamanagh (A Lennon), 3 Castleconnell (N Meehan). Masters: 1 St Michael’s (S O’Donnell), 2 Lee Valley (T Corcoran), 3 Shandon (J O’Neill).

Women

Eight – Junior 18: 1 Portora, 2 St Michael’s, 3 Galway. Jun 16: 1 Shandon, 2 Commercial, 3 Portora. Jun 15: 1 Portora, 2 St Michael’s. Masters: 1 Shannon.

Four – Inter, coxed: 1 Garda, 2 Athlunkard. Junior 18: 1 Portora A, 2 Galway, 3 St Michael’s.

Pair – Junior: 1 Portora, 2 Lee, 3 St Michael’s A.

Sculling, Quadruple – Club Two: 1 Fermoy, 2 Athlunkard, 3 Sligo. Novice, coxed: 1 Fermoy, 2 Univ of Limerick, 3 Lee. Junior 18: 1 Lee, 2 Fermoy, 3 Offaly. Jun 15, coxed: 1 Cork A, 2 Fermoy A, 3 Workmens.

Double – Senior: 1 Castleconnell, 2 Sligo. Junior 15: 1 Workmens, 2 Fermoy, 3 Lee A.

Single – Inter: 1 St Michael’s (A O’Sullivan), 2 Garda (J Ryan), 3 Fermoy (S Bouanane). Novice: 1 Castleconnell (R Kilkenny), 2 Fermoy (A Collins), 3 Univ of Limerick. Jun 18A: 1 Lee (E Cummin), 2 Lee (C Maguire), 3 Fermoy (S Cotter). Jun 16: 1 Lee (C Synnott), 2 Workmens (S Burns), 3 Fermoy (A O’Sullivan).

Published in Rowing

#ROWING: Sam McKeown of Portadown won the intermediate single sculls, beating Damien Kelly of Garda, at Limerick Regatta today. The St Michael’s men’s senior pair came out on top and Portora won both the junior 18 and junior 16 men’s eights. Patrick Munnelly of Athlone won the final of the men’s junior 18 single sculls. The event had to be delayed for over an hour because of inclement weather and junior 14 events were cancelled. However, a meeting at the venue decided that the Irish Schools Regatta on Sunday will go ahead.

Limerick Regatta, O’Brien’s Bridge, Selected Results:

Men

Eight – Junior 18: 1 Portora, 2 St Joseph’s, 3 St Michael’s.

Junior 16: 1 Portora, 2 Col Iognáid, 3 St Joseph’s. Masters: St Michael’s.

Four – Senior: 1 Skibbereen, 2 St Michael’s.

Pair – Senior: 1 St Michael’s, 2 Neptune, 3 Shannon.

Sculling – Quadruple – Club Two: 1 Cork B, 2 Shandon, 3 Cork A. Junior 15, coxed, Final One: 1 Shandon A, 2 St Michael’s, 3 Killorglin. Final Two: Castleconnell.

Single – Intermediate: 1 Portadown (S McKeown), 2 Garda (D Kelly), 3 St Michael’s (D O’Connor). Junior 18: 1 Athlone (P Munnelly), 2 Graiguenamanagh (A Lennon), 3 Castleconnell (N Meehan).

Women

Eight – Junior 18: 1 Portora, 2 St Michael’s, 3 Galway.

Sculling, Quadruple – Junior 18: 1 Lee, 2 Fermoy, 3 Offaly.

Double – Junior 15: 1 Workmans, 2 Fermoy, 3 Lee A.

Published in Rowing

#ROWING: Tim Harnedy of Skibbereen claimed his first win since his return to rowing in Ireland at a wet and cool Limerick Regatta at O’Brien’s Bridge today. The 31-year-old, who took a World Championship silver medal with Ireland in 2005, put Eimantas Grigalius of Three Castles and Tiernan Oliver of Queen’s University behind him in today's racing.

Limerick Regatta, O’Brien’s Bridge (Selected Results)

Men, Eight – Junior 18: 1 St Joseph’s, 2 Col Iognaid, 3 Cork.

Junior 16: 1 Cork, 2 St Joseph’s, 3 St Michael’s. Masters: St Michael’s. Junior 15: 1 Cork, 2 St Michael’s, 3 Muckross.

Four – Senior: 1 Carlow, 2 St Michael’s. Intermediate, coxed: 1 Carlow, 2 Muckross, 3 Castleconnell. Novice, coxed: 1 Shandon A, 2 Univ of Limerick A, 3 Univ of Limerick B. Junior 18A, coxed: 1 Col Iognaid, 2 St Joseph’s, 3 St Michael’s.

Pair – Senior: 1 St Michael’s A, 2 Carlow, 3 St Michael’s B.

Sculling, Quadruple – Senior: 1 Queen’s, 2 Carlow/Three Castles, 3 Carlow. Club Two: 1 Skibbereen, 2 Carlow, 3 Clonmel. Junior 18: 1 Skibbereen, 2 Cork, 3 St Joseph’s. Junior 16, coxed: 1 Cork A, 2 Killorglin, 3 Cork C. Junior 15, coxed – A Final: Col Iognaid B. B Final: St Michael’s A.

Double – Intermediate: 1 St Michael’s A, 2 Shannon, 3 Queen’s D. Junior 15 – Final One: St Michael’s. Final Two: Lee C.

Single – Senior: 1 Skibbereen (T Harnedy), 2 Three Castles (E Grigalius), 3 Queen’s (T Oliver). Intermediate: 1 Portadown (S McKeown), 2 St Michael’s (O’Connor), 3 St Michael’s (O’Brien). Junior 18A: St Michael’s (D O’Malley). Junior 16: Graiguenamanagh (A Lennon). Masters:

Women

Eight – Junior 18: 1 Shannon, 2 St Michael’s, 3 Shandon. Junior 16: Cork. Junior 15: St Michael’s.

Four – Junior 18: 1 Muckross, 2 Shannon, 3 Shandon.

Pair: 1 Shannon/Univ of Limerick, 2 St Michael’s, 3 Muckross A.

Sculling, Quadruple – Club Two: 1 Shannon, 2 Athlunkard. Novice, coxed: 1 Clonmel, 2 St Michael’s, Athlunkard. Junior 18: 1 Cork, 2 Fermoy, 3 Portadown. Junior 16, coxed: 1 Galway, 2 Clonmel, 3 Athlone. Junior 15, coxed – A Final: Shandon A. B Final: Castleconnell.  

Double – Senior: 1 St Michael’s, 2 Castleconnell, 3 Cappoquin. Junior 15 – A Final: Fermoy A. B Final: Lee A.

Single – Intermediate: 1 Cork (A Bulman), 2 Shannon (Lane), 3 Killorglin (Joy). Novice: Clonmel (O’Loughlin). Junior 18A: 1 St Michael’s (Murphy), 2 Col Iognaid (Cushen), 3 Athlone (Curley). Junior 16: 1 Portadown (Walker), 2 Col Iognaid (Coyne) 3 St Michael’s (O’Riordan).

Published in Rowing

With the sculling championships coming up in September, there was great interest in the Division 1 and 2 competitions at the Limerick Regatta over the weekend with Skibbereen competing well to hold their Grand League top table position.

In Division 1 of the men's race, with 20 scullers declared, Sam Lynch of St Michael's, Limerick pipped  Richard Coakley of Skibbereen in the heats by 0.48 seconds . The two former lightweight internationals battled it out in the final with Coakley exacting revenge in fine style putting Lynch into third spot with Cian Pidgeon, an intermediate from Castleconnell, putting in a fine performance to clinch second place.

In the men's Division 1 4x- race Skibbereen again showed the strength of their junior squad as they beat their club seniors and St Michael's seniors into second and third spot respectively.   St Michael's took the Division 1 pairs from the aspiring intermediates from Cappoquin Rowing Club.

The double sculls competition was also keenly contested with several strong Skibbereen  doubles in the heats but is was  their juniors, fresh back from their silver medal at the European Junior Championships, who took first ahead of their club seniors with Clonmel and St Michaels taking second and third spot.

The Division 2 men's single sculls race, with 34 boats, was made up of novice, junior B and Junior 16 scullers. After the time trials it came down to the top four in Final A which was won by Prenderville from Muckross by 13 seconds from Lee RC, followed by Skibbereen and Workman's, who dead-heated for third place.

The women's Division 1 final was taken by Gillian Hosford of Skibbereen from a young Kate O'Brien from St Michaels.    In the Division 2 final Corcoran-O'Hare (Shandon) beat Marie Piggott (Bantry) by a mere 0.43 seconds in a close finish.

In the Junior 14 and 15 ranks there was a massive entry of enthusiastic young rowers with the honours spread fairly widely around the clubs of Galway, Carrick on Shannon, Cork, Carlow, and Athlone. It was good to see new club Colaiste Chairáin from Croom in County Limerick show that, with ambition and hard work, you can get a rowing programme off the ground.

While the regatta entries were mainly Munster based, clubs from all four provinces were represented, reflecting an appetite, despite the traditional holiday season, for a serious August regatta in preparation for the small boat National Championships in September.

Click this link for Irish Rowing details

Click this link for the Latest Rowing News

Published in Rowing

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020