Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Navy

#NavalService - More than 60 years of overseas service by the Defence Forces are to be honoured in a set of stamps launched today. The four-stamp set depicts the four branches of the forces – the Army, Naval Service, Air Corps and Reserve Defence Force.

Speaking at the stamps launch, Lieut Gen Conor O'Boyle, chief of staff of the Defence Forces, said: "I am very appreciative to An Post for their work in issuing this special commemorative set of stamps as a salute to the modern Irish Defence Forces. For more on the launch, The Irish Times reports.

Afloat.ie adds that among the quartet of stamps appropriately sold at 60 cents each, is the Naval Service represented by the OPV L.E. Niamh (P52). Astern of the 'Roisin' class vessel is the former Royal Navy Peacock class CPV HMS Swift now L.E. Orla (P41).

As previously reported, the sell-listed L.E. Emer made an historic first as she became the first ever Naval Service vessel to re-supply troops serving with the UN in The Lebanon during 1979, the year in which she was commissioned.

Published in Navy

#FarewellEMER – Dublin Port is to bid farewell to L.E. Emer (P21) on her final visit to the capital today.  Under command of Lt. Cdr. Alan O'Regan she is to resume her last patrol prior to de-commissioning on 20 September, writes Jehan Ashmore.

The sell-listed offshore patrol vessel (OPV) of 1,019 displacement tonnes has served the Naval Service dutifully for nearly 35 years.

Since her launch from the V.C.D. shipyard in 1977, the vessel which entered service two years later, has carried out numerous patrols. Not  just fishery monitoring patrols but varied tasks among them the interdiction of illegal drugs and contraband to search and rescue (SAR).

Naval Service vessels are not restricted to domestic waters but also re-supply missions to Irish Army troops serving the United Nations (UN) overseas.

A notable historic first role was undertaken by L.É. Emer, as she became the first ever Naval Service vessel to re-supply troops serving with the UN in The Lebanon during 1979, the year in which she was commissioned.

The 65m vessel is fitted with the following weaponary where the main armament consists of a Bofors 40mm L70 Canon, secondary armament is 2 X 20mm Rheinmetall RH202 Canon. In addition to small various arms ranging from 9mm Pistol to 7.62mm General Purpose Machine Guns mounted amidships.

Another significant operation by the L.E. Emer was the apprehension of the trawler, Marita Ann in 1984, which was stopped after warning shots were fired, having found to be carrying a significant quantity of arms and ammunition.

 

Published in Navy

#FarewellEMER – L.E. Emer (P21) has completed a four-hour farewell patrol 'cruise' in Dublin Bay today for former crew members of the 1978 built vessel, writes Jehan Ashmore.

The Naval Service offshore patrol vessel (OPV) had on board both members of the The Naval Association and Merchant Navy and where no doubt numerous naval career stories were recalled down through the years.

She slipped her moorings this morning and departed Dun Laoghaire Harbour and made a clockwise circuit of Dublin Bay, passing the Baily Lighthouse, rounding the North Burford bouy and then proceeded south before reaching off Killiney Bay.

In calm sunlight seas she stayed in these waters before slipping through Dalkey Sound to Scotsman's Bay and off Sanycove Point, she also momentarily took some time there before she headed to dock in Dublin Port just after lunchtime.

At the next berth is the French Navy's mine-warfare vessel Croix du Sud which arrived this morning.

Yesterday, L.E. Emer made the short passage from an anchorage call off Skerries to Dun Laoghaire Harbour where tours of the vessel were made to the public while berthed at Carlisle Pier.

As previously reported, L.E. Emer is to be de-commissioned on 20 September and in the following month a pubic auction is to take place to sell the 35 year veteran unless previously sold.

 

Published in Navy

#FishingDetention – A British registered fishing vessel was detained yesterday by the Naval Service OPV L.É. Aoife (P22) approximately 90 nautical miles south west off Mizen Head, Co Cork.

The detention was in relation to an alleged technical breach of fishing regulations. The vessel was escorted by the L.É. Aoife to Castletownbere earlier today, and handed over to An Gardaí Síochána.

According to the Naval Service, this brings to a total of 730 vessels boarded in 2013. There have been 24 warnings issued and this is the 7th vessel detained by the Naval Service so far this year.

 

Published in Navy

#navy – Cork Auctioneer Dominic Daly is to sell the Navy Vessel LE Emer (P21) in early October. The Auctioneer, who recently handled the public auction of the Clipper Faith Cargo vessel for the Admiralty Marshall, confirmed arrangements are now in place with the Department of Defence to dispose of the ship this Autumn. Interest could come from a variety of sources including the conversion of the ships for the superyacht market or use as an offshore energy supply boat or a research vessel. 

A year later the sister ship LE Aoife (P22) will also go on the market. Both ships are being replaced with new builds for the Irish Naval Service.

As Afloat.ie reported in May, the two Irish-built navy patrol ships launched at Verolme Cork Dockyard, are to be sold off after 40 years of service.

LE Emer (P21) and a sister ship LE Aoife (P22) were built between 1978 and 1980 at the Rushbrooke shipyard near in Cobh, Co Cork.

The first ship of four in the Offshore Patrol Vessel (OPV) class built in Cork in 1972, the LE Deirdre (P20) , was decommissioned in 2001 and sold for €190,000. She was later converted into a luxury yacht.

The two ships will be replaced by two new OPVs currently under construction in the UK.

Published in Navy

#FemaleCaptains -For the first time the command handover ceremony between female captains of the Naval Service took place in Waterford City quays on Friday.

The ceremony held on board L.É. Aoife (P22) saw outgoing Captain, Lieutenant Commander Erika Downing hand over to Lieutenant Commander Marie Gleeson.

Waterford was approriately the location for the historic occasion as L.É. Aoife's adopted home-port is the south-eastern city. All Naval Vessels are individually associated with ports around the coastline.

Female personnel first joined the Irish Naval Service in 1995. Eighteen years later female personnel are fully operationally deployed and integrated, making significant contributions to the Naval Service whilst advancing their careers in line with their male colleagues.

Currently one in four of serving Naval Officers are female and earlier this year the Navy promoted two female Non Commissioned Officers (NCOs) to the senior enlisted rank of Petty Officer.

 

Published in Navy

#NavalNewNames – According to The Irish Times, the Government has decided to name the two new OPV patrol vessels after Nobel prize-winning Irish writers. The move is a departure from the policy of naming vessels after female mythical figures.

The newbuilds are to be named L.E. Samuel Beckett and L.E. James Joyce, the first of the pair is due for delivery in early 2014 and the second in 2015 respectively.

As previously reported on Afloat.ie, the keel-laying ceremony of the first of two PV90 OPV's took place more than a year ago at Babcock Marine's shipyard in north Devon. They are an enhanced version of the 'Roisin' (PV80) class and are to be 10m longer.

 

Published in Navy

#TrawlerDetained – According to The Irish Times, the Naval Service CPV LÉ Orla (P41) detained an Irish-registered fishing vessel yesterday about 50 nautical miles off Hook Head, Co Wexford.

The detention was in relation to an alleged breach of fishing regulations. The vessel was escorted last evening by the LE Orla to Dunmore East, Co Waterford and handed over to the Garda for further investigation.

This latest detention brings to 507 the total number of vessels boarded by the Naval Service in 2013, with 713 warnings issued and is the 6th vessel detained by the navy so far this year.

 

Published in Navy

#JFKennedy50th- The Eternal Flame taken from the grave of former US President John F. Kennedy in Washington has arrived to Dublin Airport this morning and is to be transferred to the Naval Service in Dublin Port and carried by sea to New Ross, writes Jehan Ashmore.

This is the first time that the flame has been given permission to be taken from the Kennedy grave at Arlington National Cemetery, since the assassination of President Kennedy in June 1963.

A ceremony will be held later today when the flame is passed over from the Defence Forces to the Naval Service CPV coastal patrol vessel L.E. Orla (P41) which is berthed along Sir John Rogerson's Quay.

L.E. Orla is scheduled to depart Dublin Port mid-afternoon with the flame on board the CPV and taken to New Ross where the Wexford town is marking his 50th anniversary visit.

On Saturday, John F. Kennedy's daughters Caroline Kennedy and Jean Kennedy Smith will be guests of honour along the Quayside in New Ross accompanied by An Taoiseach Enda Kenny and where they are to use the Eternal Flame to light the Emigrant Memorial beside the replica Dunbrody famine tallship.

The flame will also be brought to the Kennedy Monument in his ancestral homeland as a final act to mark the half-century anniversary.

 

Published in Navy

#TrawlerDetention - Naval Service OPV L.É. Niamh (P42) has detained an Irish registered fishing vessel approximately 50 nautical miles west of the Blasket Islands yesterday evening.

The detention was in relation to an alleged breach of fishing regulations. The vessel was escorted by the 'Roisin' class OPV to Castletownbere, Co Cork and arrived at 5 am this morning. The vessel is currently in the process of being handed over to An Gardaí Síochána.

This brings to 452 total vessels boarded by the Naval Service in 2013, 17 warnings issued and this is the fifth vessel detained by the Naval Service so far this year.

 

Published in Navy
Tagged under
Page 23 of 26

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020