Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Normandy

#Fishing - Authorities in France and the UK have stepped into the ‘scallop wars’ that broke out between rival fishing fleets in the English Channel near Le Havre last week.

As the Guardian reports, some 35 French boats chased away five British vessels off the Normandy coast in a standoff over restrictions on the region’s scallop fishery.

Between March and October, French boats are barred from fishing for scallops in the 40 miles of international waters off Normandy called the Baie de Seine.

Smaller British boats dredging for scallops in the same waters are under no such prohibition, which has raised the ire of their French counterparts who claim their stocks are being poached.

The French navy has already pledged to intervene in the event of any further clashes — prompting Downing Street to push for further talks between the two sides.

The Guardian has much more on the story HERE.

Published in Fishing
Tagged under

100 yachts are expected in Le Havre from 3 to 9 June for the eighth running of Normandy Sailing Week. Around ten series will be racing during the week-long competition in Baie de Seine, North-East France. A number of events will be run within the context of Normandy Sailing Week, including the French J80 Cup, the European J111 Championship, the first leg of the French Elite Championship for crewed offshore M34 racing and the UNCL Trophée Manche and Normandie for the IRC category.

A fine vintage is scheduled to race in Le Havre for the eighth act of Normandy Sailing Week! Over 800 racers will be competing on a number of close-contact, coastal courses launched by race committees responsible for each of the three race zones.
Significantly, the French J80 Cup is making its comeback in Le Havre this year. As such, over 25 J80s will be on the race zone with a sizeable local delegation. Le Havre's Société des Régates (Racing Society) has helped to boost this move with the purchase of five boats from the "J Composites" yard.
This Norman sailing event will begin with action from the M34s, the craft used in the Tour de France à la Voile. Around a dozen 34-feet Archambaults will enter the fray from the morning of Tuesday 4 June, when they take the start of a 230-mile race. All the Class' powerhouses will be there. Daniel Souben "Courrier Dunkerque 3", Nicolas Troussel "Crédit Mutuel – Bretagne", Cédric Pouligny "Team Oman", Corentin Douguet "Nantes / Saint-Nazaire" will be doing battle with some of the series' 'newcomers', including "Groupama 34" skippered by Franck Cammas, the recent winner of the Grand Prix Guyader and the Volvo Ocean Race, as well as Thomas Coville aboard "Sodebo". Suffice to say then that this "Volvo Drive E Race" will be hotly contested, providing a perfect foretaste of the Tour de France, which sets sail from Dunkirk at the end of June. Following on from this, the M34s will complete a series of round-the-cans courses off Le Havre from Thursday.
They will be joined by the J111 racer-cruiser fleet, which will see no less than 14 boats competing for the European J111 Champion title. This prize will be awarded on Sunday as Normandy Sailing Week draws to a close.
On the second race zone, the IRCs will take centre stage from 7 June, with four separate rankings deciding between the IRC 1, IRC 2, IRC 3 and IRC 4 categories. The organisers are expecting large numbers with the confirmation that Franck-Yves Escoffier, of offshore fame, will be racing aboard an Archambault 35. The current IRC 2 title holder, "Dunkerque Plaisance", skippered by the formidable Philippe Bourgeois, will also be keen to score well. Other serious contenders include the JPK 10.10 "Foggy Dew" helmed by local sailor Noel Racine and the X41 "Orange Mecanix" skippered by Maxime de Mareuil.
Finally, on the third and final race zone, the sportsboats (which include the Seascape 18s), will put on a show amidst a frenzy of bowsprits and zippy hulls, fleshed out by the presence of some all new J70s. The stakes will be especially high for the First 7.5s, who will also be competing here in a challenge specific to the Ligue de Voile de Haute-Normandie (Upper Normandy Sailing League).

Published in Offshore
Tagged under
Diplomat, the original ferry that started operations for Celtic Link Ferries in 2005 has been sold to Indian ship-breakers after serving a spell on charter in the Caribbean, writes Jehan Ashmore.
Since leaving the Rosslare-Cherbourg port route in late 2009, the Diplomat has run between Santo Domingo (Dominican Republic) and San Juan (Peurto Rico) for Marine Express. For more click HERE. The freight-ferry was built by Hyundai Heavy Industries in Ulsan, South Korea in 1978 and she was the final 'Searunner' class of 11 ordered by the Stena Rederi.

Launched as the Stena Tranporter, the career of the 16,000 tonnes has spanned over three decades in which the 151m vessel changed through several owners and subsequent vessel renamings.

It was when she served under the name Baltic Ferry, that her most notable career took place in 1982 during her wartime deployment as part of the
Falklands Islands Task Force. The 151m vessel was requisitioned by the British Ministry of Defence which saw the ship engaged in military operations when RAF Harrier Jump-Jet aircraft transferred store supplies from the deck of the ship as part of the war-effort in the South Atlantic Ocean.

In 2001 the vessel undertook ferry operations to Ireland as the European Diplomat on the Dublin-Liverpool route for the P&O (Irish Sea) route network. The following year she was transferred on the direct route to France until P&O pulled the plug on the continental service in December 2004, leaving Irish Ferries as the sole operator.

It was not until February 2005 that the route resumed service but this time under new owners Celtic Link Ferries. The O'Flaherty brothers, owners of a large fishing fleet in Kilmore Quay purchased the vessel and renamed her Diplomat. See PHOTO.

For the next four years she built up a steady customer loyalty between freight-hauliers drivers and car-only accompanying passengers who were accommodated in the ship which had a limited passenger certificate for 114 passengers. In addition she had a license to transport livestock.

Currently Celtic Link Ferries operate the ferry Norman Voyager but the 800-passenger / 200-car ro-pax vessel will only remain on the route until an October debut of a larger sistership the Cartour Beta.

The vessel is running this season between Italy and Sicily and with an added deck the 27,552 tonnes vessel has an increased capacity for passengers, cars and enhanced range of facilities. Recently the company had run a competition to name the new vessel which is to begin a five-year charter on the service between Wexford and Normandy.

Published in Ferry

Details for next year's course of the La Solitaire du Figaro race were revealed at the Paris Boat Show yesterday. The race will comprise four French towns and Dun Laoghaire will be the only foreign port of call when the boats are expected to arrive on 10 August.

In spite of Dublin airport weather delays a National YC contingent headed by Commodore Peter Ryan made it to Paris in time for the announcement.

The single-handed sailors will face a 1,695 nautical mile race in a traditional format with four legs with a decidedly northern course, set between the 46th and 53rd parallels. The Breton town of Perros-Guirec will be host to the festivities on 23 July and up to the first race leg to Caen, some 320 nautical miles, on 31 July. The course will not follow a direct route as the competitors will follow the British coastline before sailing down into the Bay of Seine.

Following several days for rest, the fleet shall once again set sail on 7 August for the second leg, of 470 nautical miles, that will take the Figaro Bénéteau 2 towards Dún Laoghaire. After leaving the Bay of Seine, a 40-mile or so run, the first obstacle will be the passage of the Barfleur point. The course remains inshore, as the single-handed sailors will sail along the Cotentin to the cape of the Hague, before heading towards the Channel Islands.

It will be compulsory to leave the islands of Aurigny, Herm and Guernsey to starboard. The skippers will then take on a long crossing of the English Channel, 120 nautical miles to Land's End. The last third of the course is a sail up almost full north over 190 nautical miles to reach Dún Laoghaire.

The Dublin Bay harbour is set to be a discovery for the visiting sailors and where the National Yacht Club are to be the host venue. After a few days rest and recuperation, the fleet then will set sail on 14 August to The Vendée and Les Sables d'Olonne. This third leg is long at 475 nautical miles with boats expected on 17 August.

Four days later and the final leg departs on 21 August with the boats setting a course for Dieppe, to arrive on 24 August. On the following day the Normandy port will also be hosting a closing regatta. For more information www.lasolitaire.com

Preparing for La Solitaire du Figaro here

Latest news for La Solitaire du Figaro here
Published in Figaro

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020