Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Royal Western Yacht Club of England

Thursday 11 July 2024 will see the welcome return of Plymouth Race Week.

There will be three great events happening simultaneously during the four-day regatta taking place over three racecourses in Plymouth Sound National Marine Park on the south-west coast of England.

Hosted by the Royal Western Yacht Club of England, the week is guaranteed to have a strong local turnout as the race committee will be regional and national race officers from a number of the local clubs.

Racecourse A will host the IRC Southwest Championships. As with all racing over the week, this is an open event which will run from committee boat starts and managed by the RWYC.

Within the IRC class will be breakout results for RC1000 and RC900, two local initiatives which have seen some great racing over the past two years.

Following a lunchtime briefing, IRC racing will begin on Thursday afternoon with two races, followed by a maximum of four races on Friday and Saturday and finally two on Sunday.

Racecourse B will be from the Plym Yacht Club start line on the Mount Batten Breakwater and will host the SW YTC Southwest Championships.

Map of the planned racecourses for Plymouth Race Week 2024Map of the planned racecourses for Plymouth Race Week 2024

Race 1 will be the traditional Chris Moyse Pursuit Race, followed by round-the-cans racing on Saturday and Sunday.

Racecourse C will be south of the Breakwater and the venue for the J24 National Championships. A large entry is expected for this competitive one-design class as their World Championships in 2025 are to be held here under the burgees of both the Saltash Sailing Club and Plym Yacht Club.

Known as “The Yachtsman’s Regatta”, Plymouth Race Week is unique. The Breakwater provides excellent shelter against big seas so the conditions will be the very best available anywhere. That coupled with the natural amphitheatre, being the Plymouth Sound National Marine Park, provides the best spectator vantage points in order to watch the action close up.

It is no surprise that Plymouth Sound has hosted both SailGP and America’s Cup World Series events in recent years. Now, Plymouth Race Week allows the opportunity for all visiting teams to experience racing in those same waters as seen on TV.

A full entertainment package is scheduled for the event, to include a roast, live music, barbecue, wet bar and of course a crew party — with the prize-giving on the Sunday afternoon where the J24 National Champion will be crowned along with the SW YTC and IRC Southwest champions.

For further details and entry forms, see the RWYC website. And for the latest chat and information, see the event’s official social media page.

Published in Racing

Plymouth’s Royal Western Yacht Club has confirmed that it will run its OSTAR and TWOSTAR transatlantic races in 2020 from Britain’s Ocean City as it has done every four years since the first race in 1960.

“These races from Plymouth to Newport, Rhode Island will continue to be sailed as originally envisaged by Cockleshell hero Blondie Hasler, a test of skipper and boat against the North Atlantic Ocean,” said the club, which will next year celebrate 60 years since it introduced short-handed oceanic racing.

The OSTAR and TWOSTAR events will also be supported by Plymouth City Council as part of next year’s Mayflower 400 celebrations.

“Unfortunately the French organisers of The Transat 2020 have now decided to start their race in Brest rather than Plymouth,” the Plymouth club added. “This deprives the skippers and public of the opportunity to meet and share in the 60th anniversary of the OSTAR.”

The RWYC explained that The Transat was first sailed in 2004 when it decided it could no longer afford the cost or responsibility of running a ‘Grand Prix’ type event for the larger, one-design, highly sponsored and professionally skippered boats.

“The RWYC selected a commercial events organisation to run this part of the race while they continued to run the OSTAR, for professional and experienced skippers alike sailing any class of boat, as the corinthian event envisaged by the original participants 60 years ago.”

Published in Offshore

#RB&I - The Royal Western Yacht Club of England is now taking entries for the latest Round Britain and Ireland two-handed race, which starts from Plymouth on Sunday 3 June.

This year marks the 14th running of the quadrennial yacht race, which was established in 1966 by the Cockershell hero Major Blondie Hasler.

The race comprises five legs totalling around 2,000 miles, sailed clockwise around the British Isles and Ireland leaving all islands and rocks to starboard.

The race is open to professional and amateur yachtsmen in mono and multi-hulls from 28ft to 55ft overall.

The Round Britain and Ireland race is essentially five races in one with the results decided on accumulated time (IRC corrected). The legs are relatively short stages of three or four days where time spent at the helm and minimum sleep has to be balanced with the need for solo watch keeping and precise navigation.

The race record stands at 15 days, 7 hours but sailors should allow about 23 days to complete the event, including the four 48-hour stopovers in Kinsale, Castle Bay, Lerwick and Lowestoft.

The first leg from Plymouth to Kinsale is 230 miles long, passing outside the Eddystone and Bishop Rock lights to finish at Bulman Rock. Kinsale Yacht Club is at the head of the accessible and safe harbour.

After the 48-hour stopover, competitors set sail on the second leg from Kinsale for Castle Bay on the island of Barra in the Outer Hebrides. The boats keep the Fastnet Rock to starboard at the beginning of the 440-mile second leg past the South and West coasts of Ireland. On arrival, the fleet moors or anchors in Castle Bay.

Leg three covers a distance of 420 miles. The yachts round Barra Head and sail north northwest 70 miles out into the Atlantic, aiming for the isolated volcanic archipelago of St Kilda, after which the competitors round Muckle Flugga and head to Lerwick, 61 degrees north latitude, on the island of Shetland. The Lerwick Boating Club is the host for two days of jollity and warm hospitality.

The longest leg four is 470 miles south from Lerwick to Lowestoft, which is the most easterly point of the British Isles. The Royal Norfolk and Suffolk Yacht Club provides a very hospitable stopover. Family and friends find this port the most convenient to visit being the most accessible by land.

The final leg five of 305 miles is along the South Coast to Plymouth. This leg often proves to be where the podium places are decided due to the many tidal gates. The finish line is in Plymouth Sound off the RWYC Club House.

The Notice of Race and Entry Form can be found at the RWYC website. For further details, contact the race director David Searle at [email protected] or the RWYC secretariat at [email protected].

As reported earlier today on Afloat.ie, entries are also open for the Volvo Round Ireland Yacht Race 2018, marking the 40th year of the biennial race run by Wicklow Sailing Club.

Meanwhile, the RORC has posted its Pre Notice of Race for the Sevenstar Round Britain and Ireland Race run from Cowes on Sunday 12 August. The previous edition in 2014 was won by Irish duo Liam Coyne and Brian Flahive and their First 36.7 Lula Belle.

Published in Rd Britain & Ireland

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020