Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: shipman

John Masterson's Curraglas of the National Yacht Club is 2021 Shipman Irish National Championship winner after a four-race series at Dun Laoghaire Harbour this weekend.

RStGYC's Viking (Fergus Mason and Colm Duggan) was second overall. Third was clubmate Alain Deladiennee's in Poppy. 

Masterson won by a one-point margin in the eight boat fleet after four races sailed at the DMYC hosted championships. 

Results are here

Published in DMYC
Tagged under

#shipman – Christine Heath's Shipman Gusto was the winner of the 13-boat Shipman National Championships at Howth Yacht Club on Saturday.  Full results are available to download below as a jpeg.

Heath's Royal St. George entry was just one entry from the four Dun Laoghaire clubs, RStGYC, NYC, RIYC and DMYC who competed in the four race event.

Published in Racing
Tagged under

Howth Yacht Club's Lambay Race is renowned for providing a real mix of conditions to test the skills - and patience - of the hundreds of crews participating.... and the 2011 event was certainly no different!

Light to moderate westerlies which greeted the fleets at their respective starts veered and died, veered some more and gained in strength, faded along the back of the island and eventually veered to the south-east by the finish in a steadily increasing wind!

The effects were reflected in a number of the class results where pre-race favourites became victims of tidal flows and wind fluctuations, although there would be no complaints about shortening both courses after three and a half hours and more on the water.

Class 1 was led home by Crazy Horse (Reilly/Chambers) on the water but it was Makutu (Doyle & Others) who took the IRC honours by three minutes corrected ahead of the fleet leader while Trinculo (M/Fleming) was comfortably the ECHO winner.

MiniMumm (Cobbe/McDonald) got the gun and the IRC award in Class 2 ahead of Impetuous (Noonan/Chambers) and was runner-up to Superhero (Byrne/Banahan) on ECHO by a narrow margin.

Royal Irish YC visitor Supernova (Lawless & Others) were clearly not fazed by the conditions, romping home in Class 3 by a massive 25 minutes on the water, corrected to over 15 minutes on IRC ahead of Holly (B.McMahon). Unsurprisingly, the margin was also good enough to win ECHO too, from Lee na Mara (R.O’Malley).

The White Sail ‘A’ Division saw On the Rox (C&J Boyle) get the better of Bite the Bullet (C.Bermingham) on both IRC and ECHO while Alphida (H.Byrne) topped the ‘B’ Division on IRC and was runner-up to Bandersnatch (K.O’Grady) on ECHO.

Five First 31.7s travelled from Dun Laoghaire to compete with Howth’s C’Est la Vie in a scratch event and it was magic (O’Sullivan/Espey) of the Royal Irish which came home first by just under two minutes. An importation of six Shipman from the southside saw Joslim (Clarke/Maher, RSt.GYC) beat second-placed Just Good Friends (M.Carroll, DMYC) by over three minutes.

 

The other one-design classes started on the Inshore Course with the Squibs and Howth 17s given a head-start before a 3-class start of Etchells, SB3s and J24s gave chase, followed by E-Boats, Ruffians and Puppeteers.

Fetching (Quinn/O’Flaherty) had just 23 seconds to spare over second-placed Glance (Dix/O’Reilly) in the Etchells, Shockwave (E.Quinlan) had the better of Sin a Bhuifl (G.Guinness) in the SB3 match-race and former All-Ireland Sailing Champion Stefan Hyde (RCYC) on Kilcullen headed home the J24s by a little over a minutes from Hard on Port (F.O’Driscoll).

The regular fleet leader in the Puppeteers, Harlequin (Clarke/Egan), didn’t disappoint and headed the 17-strong fleet home by 15 minutes on scratch from Yellow Peril (N.Murphy), with the result the same on handicap.

Ten Ruffians travelled from Dublin Bay and it was the National Y.C.’s Ruff N Ready (Kirwan & Others) who took the honours from Ruffles (M.Cutliffe, DMYC) while Puffin (E.Harte) topped the Squib rankings by two minutes from Wasabi (C&N Penlerick) on scratch and was runner-up to Pegasus (T&K Smyth) on handicap.

The Howth 17s, almost as old as the Lambay Race itself, were led home after almost 4 hours racing by Aura (I.Malcolm) from Rita (Lynch/Curley) with the latter taking the handicap honours from Leila (R.Cooper).

HOWTH YACHT CLUB.  LAMBAY REGATTA (RACE) 11/06/2011   Class 1  IRC:  1, Makutu Doyle/Others HYC;  2, Crazy Horse Reilly/Chambers HYC;  3, Storm P Kelly HYC;  Class 1  ECHO:  1, Trinculo M Fleming HYC;  2, Makutu Doyle/Others HYC;  3, Gringo T Fox NYC;  Class 2  IRC:  1, MiniMumm Cobbe/McDonald HYC;  2, Impetuous Noonan/Chambers HYC;  3, King One D Cullen HYC;  Class 2  ECHO:  1, Superhero Byrne/Banahan HYC;  2, MiniMumm Cobbe/McDonald HYC;  3, Impetuous Noonan/Chambers HYC;  Class 3  IRC:  1, Supernova Lawless/Others RIYC;  2, Holly B MacMahon HYC;  3, Goyave Camier/Fitzpatrick MYC;  Class 3  ECHO:  1, Supernova Lawless/Others RIYC;  2, Lee na Mara R O'Malley HYC;  3, Taiscealai Richardson/Lindberg RIYC;  First 31.7  SCRATCH:  1, Magic O'Sullivan/Espey RIYC;  2, Bluefin Two M & B Bryson NYC;  3, C'est la Vie Flannelly/Others HYC;  Puppeteer  SCRATCH:  1, Harlequin Clarke/Egan HYC;  2, Yellow Peril N Murphy HYC;  3, Blue Velvet C & K Kavanagh HYC;  Puppeteer  HPH:  1, Harlequin Clarke/Egan HYC;  2, Yellow Peril N Murphy HYC;  3, Blue Velvet C & K Kavanagh HYC;  Squib  SCRATCH: 1, Puffin E Harte HYC;  2, Wasabi C & N Penlerick HYC;  3, Pot Black I & R McMurtry HYC;  Squib  HPH:  1, Pegasus T & K Smyth HYC;  2, Puffin E Harte HYC;  3, Wasabi C & N Penlerick HYC;  17 Footer  SCRATCH:  1, Aura I Malcolm HYC;  2, Rita Lynch/Curley HYC;  3, Leila R Cooper HYC;  17 Footer HPH:  1, Echo B & H Lynch HYC;  2, Leila R Cooper HYC;  3, Pauline O'Doherty/Ryan HYC;  Etchells  SCRATCH:  1, Fetching Quinn/O'Flaherty HYC;  2, Glance Dix/O'Reilly HYC;  3, Northside Dragon D Cagney HYC;  Shipman  SCRATCH: 1, Joslim Clarke/Maher RStGYC;  2, Just Good Friends M Carroll DMYC;  3, Whiterock H Robinson RIYC;  E Boat  SCRATCH:  1, OctupussE P O'Neill CY&BC;  Ruffian 23  SCRATCH:  1, Ruff N Ready Kirwan/Others NYC;  2, Ruffles M Cutliffe DMYC;  3, Ripples F Bradley DMYC;  SB 3  SCRATCH:  1, Shockwave E Quinlan HYC;  2, Sin a Bhuifl Guinness/Costigan HYC;  White Sail A IRC:  1, On the Rox C & J Boyle HYC;  2, Bite the Bullet C Bermingham HYC; 3, Flashback Hogg/Others HYC;  White Sail A  ECHO:  1, On the Rox C & J Boyle HYC;  2, Bite the Bullet C Bermingham HYC;  3, Changeling K Jameson HYC; J 24  SCRATCH:  1, Kilcullen S Hyde RCYC;  2, Hard on Port F O'Driscoll HYC; 3, Jibberish Wormold/Others HYC;  White Sail B  IRC:  1, Alphida H Byrne HYC; 2, Voyager J Carton HYC;  3, Demelza Laudan/Ennis HYC;  White Sail B  ECHO:  1, Bandersnatch K O'Grady HYC;  2, Alphida H Byrne HYC;  3, Demelza Laudan/Ennis HYC;  White Sail B  HPH:  1, Voyager J Carton HYC;  2, Sandpiper A Knowles HYC;  3, Alphida H Byrne HYC;  White Sail A  HPH:  1, On the Rox C & J Boyle HYC;  2, Sojourn Blandford/Lacy HYC;  3, Bite the Bullet C Bermingham HYC

Published in Howth YC

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020