Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Silverseas Cruises

#CruiseLiners - Ultra-luxury expedition cruiseship, Silver Cloud anchored in Galway Bay recently as part of clockwise tour of Ireland and where today the ship is docked in Killybegs, writes Jehan Ashmore.

The call off the Port of Galway on Tuesday was the second Silverseas Cruises caller. The operator’s new flagship Silver Muse made a visit earlier this month to become the first caller this season.

A flotila of the cruiseships' zodiac tenders took guests ashore to the 'City of the Tribes'. They disembarked at the port's outer pier leading to the entrance of the Dun Aengus dock basin. 

Silver Cloud is a Bahamas flagged ship that at 17,014 gross registered tonnes is deemed small today in cruiseship terms, however the Monaco based operator offers luxury at the top end of the market. They have 9 cruiseships and last year the Silver Cloud was refurbished.

According to Silversea, they provide the highest space to guest and crew to guest ratios in expedition cruising. In the case of Silver Cloud there are 257 guests served by a crew 223.

Among the facilities is an explorers’ lounge, bar, boutiques, pool deck, spa, fitness centre and a photo-studio. In addition to the Connoisseur’s Corner offering cognacs and cigars for purchase.

Accommodation consists exclusively of luxurious suites where 80% of them feature verandas.

Prior to making the anchorage call off Mutton Island in Galway Bay, Afloat monitored the ice-class 157m Silver Cloud depart Pembroke Dock, south Wales having sailed from the English Channel.

The cruiseship's first destination following the call to Milford Haven estuary was in Irish waters at the spectacular backdrop of the Skelligs, Co. Kerry. This is where the cruiseship extended its role by offering guests access to 16 zodiacs.

Other water-based equipment includes 16 kayaks opening up opportunities when cruising globally to explore through greater independence.

During the cruise leg from Galway Bay to Killybegs, Silver Cloud yesterday called off the Aran Islands at Kilronan, Inishmore. The anchorage call was followed by another off Clare Island on the approaches to Clew Bay.

The 1994 built cruiseship has since docked in the Donegal port this morning.

Published in Cruise Liners

#CRUISE LINERS – In dense sea-fog conditions, three cruiseships arrived into Dublin Bay at dawn and proceeded to dock in Dublin Port, writes Jehan Ashmore.

Of the trio, Kristina Katarina (1982/12,668grt) today made her inaugural call to the port. As previously reported on Afloat.ie she is operated by Finnish owners Kristina Cruises based in Kotka, a city midway between Helsinki and sharing the border with the Russian Federation.

The other vessels, P&O Cruises Adonia (2001/30,277grt) and Silverseas Cruises Cloud (1994/16,927grt) are berthed within Alexandra Basin, nearby Kristina Katarina is moored on the river berth at Ocean Pier.

Reported last month another tree-some of cruiseships gathered in the port, which this year is scheduled to see around 90 such cruise callers during the season.

Published in Cruise Liners

#SHANNON SILVERSEAS - The mid-west port of Foynes is playing host to the ultra-luxurious Silver Whisper (2001/28,000grt) which docked along the Shannon Estuary this morning, writes Jehan Ashmore.

The vessel operated by Silverseas Cruises had sailed from Southampton and at least another call by another vessel is also scheduled this season. On average the Shannon Foynes Port Company handles four cruise calls each season.

One of the main visitor attractions along the Shannon is the local Foynes Flying Boat Museum, which retraces an altogether different era in transportation, yet also carried out travel in style when the B314 flying boats used the Co. Limerick terminal between1937-1945. Then the trans-Atlantic travellers spent time at the Foynes hub-terminal which also became home to the 'Irish Coffee'.

On board the 382 passenger capacity vessel she has a near equal number of crew at 302. This passenger to crew ratio is exceptionally high and reflects her status in the very top end of the cruise travel market. Silverseas have over the years won a whole string of globally recognised travel industry awards.

All accommodation on board the 186m / 610ft long vessel is based in suites cabins (available in seven grades) with each featuring a balcony of ocean views and countless destinations.

Facilities include boutique shopping; a wellness spa with beauty salon, fitness centre and sauna; full-scale productions in a multi-tiered show lounge; a casino, an internet café and Wi-Fi service. To read the full range of facilities and virtual tours click HERE.

In 2012 the Silver Whisper cruising schedules are to Brazil then to South Africa and the Indian Ocean landscapes. Beyond that she heads for the South China Sea, west to the Arabian Sea and Egypt.

During the summer she explores Europe before arriving in Canada for autumn's vibrant 'fall'. Silver Whisper's globetrotting culminates in the Caribbean with cruises through the year's end.

Published in Cruise Liners
Jewel of the Seas, one of four 90,000 tonnes Radiance Class cruise ships operated by Royal Caribbean Cruise Lines (RCCL) departed Dublin Port this evening bound for Cork Harbour, writes Jehan Ashmore.
During the cruisecall of the near 300 metre-long vessel, she took on bunkers from the 70m short-sea coastal tanker Keewhit (2,332dwt) which arrived from Liverpool this morning. The procedure to transfer fuel is relatively commonplace particularly with larger cruiseships calling the capital. To see photo of Keewhit transferring fuel in a similar operation which took place when the Grand Princess visited Dublin earlier this year, click HERE.

The 2,500 passenger Jewel of the Seas has a nine-deck centrum which has glass lifts which allows light to flow throughout the spacious and airy ship. Activities range from golf to climbing, a spa and sumptuous restaurants.

When the 2004 built cruiseship docks at the dedicated cruise berth at Cobh in the early hours of tomorrow she will also be sharing the deepwater berth with the 2001 built Silver Whisper. The ultra-luxury vessel accommodates only 388 passengers and is operated by SilverSeas Cruises. To read more about the vessel click HERE.

Both vessels are scheduled to depart Cobh around teatime tomorrow and this will be followed by preparations of the picturesque town which is to welcome the maiden call to Cobh of Queen Elizabeth on Saturday. To read more about the newest vessel of the Cunard Line fleet click HERE. The 2010 built vessel will firstly make an inaugural call to Dublin on Friday prior to the Cobh call which coincides with Cork Harbour Open Day, for event details visit www.corkharbour.ie

Published in Cruise Liners
Dublin Port welcomed a brand new cruiseship the 66,000 tonnes Marina which docked adjacent to the veteran cruiseship, Marco Polo today, writes Jehan Ashmore.
Marina is the first of a pair of mid-sized newbuilds for Oceania Cruises, her sister Riviera is to debut next year from the Fincantieri shipyard in Sestre Ponente, Italy. The 'Oceania' -class each accommodate 1,250 passengers and a crew of 800 and they are an evolution of the companies popular sisters Regatta, Insignia and Nautica.
Designer touches on board the Marina include the Lalique Grand Staircase and the Owner's Suites which are furnished from Ralph Lauren Home, showcasing the finest in residential design and furnishings. The 785-foot ship has a Bon Appétit Culinary Centre which according to her owners is the only hands-on cooking school based at sea.

The cruise started from Copenhagen and toured several ports in Norway from where the vessel continued to Lerwick, Torshavn,Iceland, Portree and her last port of call was Belfast. The vessel had berthed in Dublin's Alexandra Basin and departed this evening bound for Dover.

Following the Marina's departure out of Dublin Bay via the North Burford bouy, was the Marco Polo. The 1965 built vessel operates for Cruise and Maritime Voyages and she proceeded past the South Burford bouy bound for St. Mary's, the capital of the Scilly Isles.

There will be many more cruisecalls such as the ultra luxury six-star Silver Cloud which is due on Sunday. The 16,927 tonnes vessel operated by Italian owned SilverSeas Cruises, has only a capacity for 294 passengers. Following that visit P&O Cruises 115,000 tonnes Azura docks in the capital this day next week to disembark up to 3,500 passengers. To view a full list of cruise callers click HERE.

Published in Cruise Liners
As the summer draws closer to an end, particularly for land-based holiday-makers, those offshore onboard cruiseships continue to be drawn to our shores writes Jehan Ashmore. The cruise-ship season remains busy, stretching into September.

Azamara Journey, a cruiseship built a decade ago and weighing 30,277 gross tonnes (gt) is due tomorrow (21 August) to anchor off Dunmore East. The vessel will use tender-boats to transfer passengers to the fishing port which lies on the southern approches of the Waterford estuary leading into the River Suir .

Several days after Azamara Journey's call, a further three cruise-ships will be touring the south-east. On 2 September the Crystal Symphony (51,044gt) sails overnight from Holyhead and is scheduled to take anchorage off Dunmore East and two days later a similar call is expected by the Silver Whisper. The 2001-built vessel is operated by the six-star rated Silversea Cruises.

La Diamant is due on 5 September to berth at Belview, the main port of Waterford and then is bound for the Isles of Scilly. La Diamant is owned by the only French cruise operator, Compagnie du Ponant based in Marseilles. La Diamant (8,238gt) has 172 passengers and 144 crew.

The cruise-operator specialises in offering a fleet of small bijou ships which include sail-assisted vessels. Compagnie du Ponant are a subsidiary of CMA-CGM Group, one of the world's largest container shipping companies.

Another Silversea Cruises fleetmate, Silver Cloud is due to dock on 8 September at Belview or upstream in the city-centre quays, in the heart of the newly rejuvenated 'crystal' city. Silver Cloud is on a cruise from Iceland and after the Irish call, the vessel heads for Fowey with the cruise culminating in the Pool of London.

The location of where vessels berth throughout the estuary is subject to the draft of the ship, weather conditions, tides and occupancy status of berths.

Published in Ports & Shipping

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020