Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: St Michael's

#Rowing: Cork clubs had a set of good results in the first session of Sunday finals at the Irish Rowing Championships at the National Rowing Centre.

Cork Boat Club's junior women's pair started the ball rolling, while Skibbereen then took their second title of Championships as Aodhan Burns proved a strong winner of the lightweight single sculls.

Margaret Cremen of UCC had a huge win in the lightweight single sculls, and Lee added the junior men's double to the junior quadruple title they had won on Saturday.

The tighest finish came in the men's club coxed four. NUIG made a tremendous effort to catch St Michael's of Limerick but they fell short by just .329 of a second.

Commercial of Dublin and Fermanagh's Enniskillen Royal Boat Club are having a good reatta. Enniskillen won the men's intermediate pair, while Commercial won the womens intermediate coxed four.

Published in Rowing

#Rowing: St Michael’s of Limerick had an excellent day at the National Schools Regatta at Dorney Lake. Their Girls’ Championship Four took silver behind Henley, pushing the elite English crew right to the finish.

 Ryan Spelman of St Michael’s also featured in one of the prestigious finals – he took fifth in the A Final of the Championship Single.

 Earlier, Enniskillen’s Peter Murphy and Sam Balcombe took bronze in the Championship Pair and Enniskillen were just one place outside the medals in the Boys Championship Four.

 Coleraine Grammar School finished fifth in the Junior 16 Girls Double.

Published in Rowing
Tagged under

#Rowing: Enniskillen’s Sam Balcombe and Peter Murphy took a fine third place in the men’s Championship Pair at the National Schools Regatta at Dorney Lake today.

 On Saturday, Enniskillen had won gold in the Junior 16 Girls coxed four by a big margin.

 Ryan Spelman of St Michael’s took his place in the A Final of the Championship Single Sculls, and finished well to challenge the leaders. He took fifth.

 Coleraine Grammar School also took fifth in the final of the Junior 16 Girls Double.

Published in Rowing

#Rowing: The St Michael’s Head of the River, scheduled for Saturday, March 16th, has been cancelled. The weather forecast for Limerick changed, and the organisers felt they could not be certain of running a safe event. Monday was considered for a rescheduled event, but some clubs could not change their plans.   

Published in Rowing

#Rowing: Rory O’Neill and James O’Donovan of Castleconnell shared top billing in the men’s junior 18 rankings after the concluding stage of the Dirty Dozen Challenge. Eabha Benson of St Michael’s won the women’s junior 18 series. There were four rounds, beginning in October (three kilometres) and running through November (5k) and December and January (6k).  

CategoryShellRower(-s)Bow #PlaceCourse time
W J161XC. Leahy112100:14:50
W J161XJ. O'Brien (CCBC)110200:14:51
W J161XR. Hickey (Shannon Rowing Club)114300:15:00
W J161XC. Kiely (Castleconnell)1094th00:15:02
W J161XG. Fitzgerald (CCBC)1135th00:15:29
W J161XC. Ni Dhonabhain (SRC)111DNF
W J181X�. Benson (SMRC)76100:28:45
W J181XN. Kiely (Castleconnell BC)74200:29:04
W J181XC. KIRWAN (SMRC)75300:29:58
W J181XS. Gilmore (CCBC)774th00:30:00
W J181XS. Fitzgerald (TRC)785th00:31:05
W J181XC. Storan (SMRC)826th00:31:42
W J181XC. Kelly (Castleconnell BC)797th00:33:37
W J181XA. King (SMRC)818th00:33:48
W J181XH. Bradshaw (CCBC)809th00:34:12
W J181XO. Murphy (St Michaels)8410th00:34:47
W J181X�. Phillips (SMRC)8311th00:37:41
W J181XL. O'Brien (Castleconnell Boat Club)73DNF
W OPEN1XE. Redlichova (SMRC)85DNF
W U211XC. O'Brien (Castleconnell boat club)86100:28:37
W U231XS. Murphy (SMRC)87100:32:03
W U23 Lt Wt1XN. Hartney (SMRC)88100:29:34
W J162-F. Gleeson (Shannon rowing club)
A. Curtin (shannon rowing club)116100:13:38
W J162-E. McMahon (CCBC)
T. Mulready (Ccbc)117200:14:04
W J162-C. Gleeson (Shannon rowing club)
A. Caffrey (Shannon)115DNF
W J182-S. Byrnes (CCBC)
N. Silke (Castleconnell boat club)92100:27:44
W J182-E. Mcinerney (Smrc)
E. Murphy (SMRC)89200:28:15
W J182-A. Mckeon (Smrc)
M. O'Byrne (SMRC)93300:29:10
W J182-N. Jones (SMRC)
K. McGann (SMRC)944th00:30:51
W J182-S. Broggy (Athlunkard Boat Club)
M. Malone (Athlunkard Boat Club)905th00:31:08
M J161XP. Mcinerney (Smrc)105100:13:11
M J161XD. Foley (SMRC)103200:13:12
M J161XG. O'Donoghue (Shannon Rowing Club)97300:13:21
M J161XJ. Cunningham (Castleconnell)964th00:13:41
M J161XT. Byrne995th00:13:44
M J161XI. Byrne Delimata (Castleconnell)986th00:13:49
M J161XD. De Brun (SMRC)1047th00:13:59
M J161XN. Larkin Damm (Tralee Rowing CLUB)1028th00:14:47
M J161XS. Cunningham (CCBC)100DNF
M J161XC. Oconnell (Waterville lake rowing cl...)101DNF
M J181XR. O'Neill (Castleconnell)59100:25:39
M J181XJ. O Donovan (CCBC)57100:25:39
M J181XM. English (St Michaels Rowing Club)58300:26:59
M J181XJ. Scanlon France (ABC)604th00:32:50
M J18 Lt Wt1XB. France (St. Michaels)61100:28:22
M J18 Lt Wt1XC. Bowen (Castleconnell boat club)62200:29:03
M Master B1XR. Egan (Ccbc)63100:27:01
M Master C1Xc. Byrne (CCBC)64100:28:32
M OPEN1XD. O'Connor (St. Michael's Rowing...)50100:24:45
M U211XR. Spelman (Smrc)51100:25:23
M U211XC. Mulready (Castleconnel)52200:26:53
M U211XJ. Desmond (Caslteconnell)53300:28:16
M U211XA. King (Athlunkard Boat Club)54DNF
M U231XA. Lennon (St Michaels Rowing Club)55DNF
M J152-R. Lyons (Castleconnell)
A. SWEENEY (Ccbc)106100:13:22
M J162-E. Gilmartin (CCBC)
J. McGrath (CCBC)107100:12:48
M J162-P. Mcinerney (Smrc)
D. Hartney (SMRC)108200:13:28
M J182-R. O Gorman (St.Michaels Rowing Club)
D. Hartney (SMRC)69100:25:36
M J18 Lt Wt2-S. Fitzgerald (CCBC)
C. Nolan (Castleconnell)70100:26:50
M J18 Lt Wt2-C. Foster (SMRC)
C. Kemp (SMRC)72200:27:46
M J18 Lt Wt2-A. McFerran (CCBC)
E. Healy (Castleconnell Boat Club)71300:28:09
M Master B2-P. Williams (CCBC)
E. Meskell (CCBC)65100:26:05
M Master C2-k. mc donald
M. O'Callaghan (Shannon rowing club)66DNF
M U212-J. O Brien (Castleconnel Boat Club)
C. Feely (Castleconnel rowing club)67DNF
M U232-T. McKeon (St. Michael's rowing...)
J. Cuddy (SMRC)68100:24:31
Published in Rowing

#Rowing: The Workmen’s junior women’s double took a silver at the National Schools’ Regatta at Dorney Lake in England today. In the Championship Doubles, Annie O’Donoghue and Ciara Browne finished one and a half lengths down on Latymer Upper School. Ciara Moynihan of Workmen’s finished seventh in the A Final of the Championship Singles, while Molly Curry of Coleraine Grammar School took control of the B Final and won.

 Enniskillen took silver in the Boys’ Non-Championship Eights, and their girls’ junior 16 coxed four matched them in their A Final. Ireland clubs placed second and third in the B Final of the Girls’ Championship/Non Championship Eights.

British National Schools’ Regatta, Dorney Lake (Selected Results; Irish interest)

 

Saturday

Boys

Championship/Non-Championship Eight – B Final: 3 Enniskillen RBC.

Girls

Championship/Non-Championship Eight – B Final: 2 Galway 7:35.72; 3 St Michael’s 7:45.46.

Junior 16 Four, coxed – A Final: 2 Enniskillen RBC 8:22.68.

Sculling, Double – Championship A Final: 2 Workmen’s (A O’Donoghue, C Browne) 8:06.37.

Single – Championship A Final: 7 Workmen’s (C Moynihan) 9:10.40. B Final: 1 Coleraine Grammar School (M Curry) 8:43.03.

Published in Rowing

#Rowing: Castleconnell Sprint Regatta had a huge entry and a good day for rowing. The host club, which had amassed a set of fine results at Ghent regatta, did so again at their home regatta. They won the junior 15 eights for boys and girls. St Michael’s won the girls’ junior 16 eight. Athlunkard won the final race of the day, beating St Michael’s in the final of the men’s club two coxed four.

Castleconnell Sprint Regatta, Saturday (Selected Results)

Men

Eight – Jun 15: Castleconnell. Masters: Castleconnell.

Four – Club Two, coxed: Athlunkard. Jun 16, coxed: Castleconnell.

Sculling, Quadruple – Club Two, coxed: St Michael’s. Jun 18B, coxed: Muckross.  

Double – Club Two: Workmen’s. Jun 18B: Workmen’s A.

Single – Club Two: Shandon (Diffley). Jun 18A: Castleconnell (D Martin).

Women

Eight – Masters: Univ of Limerick. Jun 16: St Michael’s. Jun 15: Castleconnell.

Four – Jun 18B, coxed: Shannon.

 Sculling, Quadruple – Jun 18B, coxed: CRCC. Jun 16, coxed: Workmans.

Double – Club Two: Waterford. Jun 18B: CRCC.

 Single – Club Two: Workmen’s (M Fleming). Novice: Cappoquin (B O’Rourke). Jun 18B: Muckross. Masters: Offaly (Nolan). 

Published in Rowing

#Rowing: The Tribesmen Head of the River, set for Lough Rynn on Saturday (February 10th) has had to be called off because of a forecast of rain and gale force gusts of wind. The organisers hope to hold a deferred event in March.

 The weather has caused a change in venue for another event. Flooding at O’Brien’s Bridge has forced the organisers of the St Michael’s Head of the River on February 24th to move it to the St Michael’s club on O’Callaghan’s Strand in Limerick.  

Published in Rowing

#Rowing: Neptune won the men’s junior 18 eight and Commercial were second at the Ghent International May Regatta in Belgium. Commercial’s Gillian Crowe and Hazel O’Neill won the women’s senior pair.

Commercial crews finished 1-2-3 of the eight crews which competed in the junior women’s pair.

Aaron Keogh of Three Castles won the junior 16 single sculls – first of 39 competitors and Jack Butler of Neptune was third of 28 in the junior 18 singles.

Cork took second in the women’s junior eight, while New Ross were third in the women’s junior quadruple.

Ghent International May Regatta, Belgium (Irish interest; selected results, finals)

Men

Eight: 1 Neptune 6:04.89, 2 Commercial 6:07.61.

Four, coxed – Jun 18: 1 Commercial 7:00.29 (two crews).

Pair – Sen: 2 Commercial (D Joyce, M Maher) 6:57.08. Under-23: 1 St Michael’s (T McKeon, D O’Byrne) 7:14.20, 3 St Michael’s (B McKeon, C Garvey) 7:15.78. Jun 18: 3 St Michael’s (T McKeon, D O’Byrne) 7:11.18.

Sculling

Quadruple – Jun 18: 2 Three Castles 6:21.19.

Double – Jun: 3 Three Castles (R Quinn, O Clune) 6:48.19.

Single: 3 S McKeown 7:25.96. Lightweight: 2 St Michael’s (D O’Connor) 7:21.71. Jun 18: 3 Neptune (J Butler) 7:42.19. Jun 16: 1 Three Castles (A Keogh) 7:38.98.

Women

Eight – Junior: 2 Cork 7:05.83, 3 Commercial 7:20.22.

Four – Jun: 2 Commercial 7:42.63.

Pair – Sen: 2 Commercial (G Crowe, H O’Neill) 7:50.48. Jun: 1 Commercial (A Keogh, S Maxwell) 8:14.43, 2 Commercial (G McNamara, K Dolan) 8:23.96, 3 Commercial (C Ryan, A O’Rourke) 8:39.88.

Sculling, Quadruple – Jun: 3 New Ross 7:22.57.

 

Published in Rowing

#Rowing: Irish clubs had some excellent placings on Saturday at the Ghent International May Regatta in Belgium. Commercial and Neptune finished first and second in the junior men’s eight and Commercial also finished second in the women’s junior eight and four, and second and third in the junior women’s pair. The Three Castles junior double of Rory Quinn and Oisin Clune took silver – second of 47 crews which competed. New Ross were the second-placed crew in the junior quadruple.

In the adult events, which generally had smaller entries, St Michael’s had wins through Declan O’Connor, Ben McKeon and Colm Garvey, while Skibbereen’s Orla Hayes won the lightweight women’s single. Sam McKeown of Queen’s University finished second to Dave Bell of Molesey in the senior single sculls.

Ghent International May Regatta, Belgium (Irish interest; selected results; Saturday)

Men

Eight – Junior: 1 Commercial 6:42.02, 2 Neptune 6:47.0.

Four – Junior: 2 Commercial 7:01.64. Four, coxed – Junior: 2 Neptune 7:13.78.

Pair – Senior: 1 Commercial (D Joyce, M Maher) 7:45.01 Under-23 (Two Crews): 1 St Michael’s (B McKeon, C Garvey) 8:22.06, 2 St Michael’s (T McKeon, D O’Byrne) 8:23.88. Lightweight Pair: 1 St Michael’s (B McKeon, C Garvey) 8:09.34. Junior: 2 St Michael’s (T McKeon, D O’Byrne) 7:36.89.

Quadruple – Junior: 2 Three Castles 6:48.14.

Double – Junior: 2 Three Castles (R Quinn, O Clune) 7:18.24.

Single – Senior: 2 Queen’s (S McKeown) 8:03.56. Lightweight: 1 St Michael’s (D O’Connor) 7:05.24. Under-23 Lightweight: 3 Queen’s (M Taylor) 8:13.94.

Women

Eight – Junior: 2 Commercial 7:52.67, 3 Cork BC 8:04.40.

Four – Junior: 2 Commercial 8:18.63, 3 New Ross 8:27.38.

Pair – Senior: 3 Commercial (H O’Neill, G Crowe) 9:06.60. Junior: 2 Commercial (A Keogh, S Maxwell) 8:57.17, 3 Commercial (G McNamara, K Dolan) 9:03.31.

Sculling – Quadruple – Junior: 2 New Ross 7:52.00.

Lightweight Single: 1 Skibbereen (O Hayes) 8:52.88.

Published in Rowing
Page 1 of 3

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020