Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Star Class

Royal Cork Yacht Club brothers Peter and Rob O'Leary were second overall in the Star class Eastern Hemisphere Championships in Viareggio, Italy yesterday. The O'Leary's were runners–up to, Andrew MacDonald and Brad Nichol USA Diego Negri and Sergio Lambertenghi of Italy were third. Participation at the event brought double Olympian Peter O'Leary back to his days at London 2012, the last time the 22–foot keelboat sailed as an Olympic class.

70 teams from 15 countries were represented at the Tuscany event.

The next big event for the Star class is the Western Hemisphere in Cleveland, Ohio in June and the Star World Championship in Denmark in July.

Published in Star

#bacardicup – Now fifth overall in the standings at the 2013 Bacardi Cup in Miami is Irish Olympian Peter O'Leary and Rodney Hagebols who have 13.5 points after finishes of 2.5-36-11.

Breeze just into the double digits made the second day of racing for the Cup a test of experience and persistence for the 56 Star teams racing on Biscayne Bay.

Two races were completed as the sunshine warmed temperatures into the low 70s, and, with three races scored a drop race now comes into play.  While Lars Grael and Mario Lagoa (BRA) remain first overall with two points net after adding today's finishes of 12-1 to their win of yesterday's lone race, less than 12 points separate the top-five teams.

Lars Grael and Mario Lagoa (hull 74) are the standings leaders after two days of racing for the 86th BACARDI Cup

"Races were similar to yesterday although the second race overall was more gentle," said Grael.  "On the first race today we did a wrong jibe and we rounded the mark fifth, closed the downwind leg 25th and finished 12th; it was a difficult race for us.  Second race of the day started well, we rounded the mark first and protected the position.  While fighting with Xavier Rohart we managed to keep a good gap with the rest of the field.  Overall we're happy because competition is tough and we're competing against Augie Diaz who is a local sailor and I believe has the home advantage."
Diaz, with crew Arnis Baltins, is just three points out of first place and knows winning this championship will come down to more than local knowledge.

"The first race was difficult, but we managed to do well," said Diaz of the win of today's first race. "We had better opportunities and with a little bit of luck we were able to round the weather mark third and then take the lead to the end. Second race of the day was more challenging because we decided to go on the right side of the course while the wind went left; I'm therefore happy with a 10th place. I have a lot of respect for Lars because he is very good in all conditions and in all venues.  I don't think I have a big edge by being local; really not as big an edge as he might think I have."

Third overall are the defending champions Xavier Rohart and Pierre Alexis Ponsot (FRA), who placed 6-2 today, a strong recovery from yesterday's finish of 25.  They carry eight points and are followed in fourth by the Italian team of Diego Negri and Frithjof Kleen whose scoreline of 13-3-9 totals 12 points. Rounding out fifth in the standings is Irish Olympian Peter O'Leary and Rodney Hagebols who have 13.5 points after finishes of 2.5-36-11.

The Italian team of Diego Negri and Frithjof Kleen are fourth overall with three races scored.

Racing for the Star class resumes tomorrow, Wednesday, March 6.  Starting on Thursday, March 7, the Stars will be joined on Biscayne Bay by sailors in the Viper 640, Audi Melges 20, and Melges 24 classes, along with the J/70 class which makes its event debut.  Racing, for all classes, will conclude on Saturday, March 9

Published in Olympic
Irish sailing bosses are determined to "stand on the podium" at the 2012 Olympic Games.
That was the message from last week's briefing by Ireland's four Olympic 'water sports' of canoeing, rowing, swimming and sailing, covered in The Irish Times.
For next summer the Irish Sailing Association has narrowed its focus on three boat classes - the Star Class, 49er and Laser Radial.
But the competition will be tough, with more than 40 countries vying for a handful of remaining Olympic spots at the Perth Sailing World Championships in December.
Other sports are more modest in their aspirations, with rowing rebuilding from the ground up with younger athletes, and Swim Ireland pushing forward with a streamlined team and plans to have six swimmers compete in London next summer.
In canoeing, Eoin Rheinisch - who placed fourth in the canoe slalom in Beijing - was on hand to discuss his qualification hopes, with two chances to clinch a spot between now and the games.
The Irish Times has more on the story HERE.

Irish sailing bosses are determined to "stand on the podium" at the 2012 Olympic Games.

That was the message from last week's briefing by Ireland's four Olympic 'water sports' of canoeing, rowing, swimming and sailing, covered in The Irish Times.

For next summer the Irish Sailing Association has narrowed its focus on three boat classes - the Star Class, 49er and Laser Radial. 

But the competition will be tough, with more than 40 countries vying for a handful of remaining Olympic spots at the Perth Sailing World Championships in December.

Other sports are more modest in their aspirations, with rowing rebuilding from the ground up with younger athletes, and Swim Ireland pushing forward with a streamlined team and plans to have six swimmers compete in London next summer.

In canoeing, Eoin Rheinisch - who placed fourth in the canoe slalom in Beijing - was on hand to discuss his qualification hopes, with two chances to clinch a spot between now and the games.

The Irish Times has more on the story HERE.

Published in Olympics 2012

Ireland's two Star crews have struggled to make an impact in the initial stages of the Star Europeans, which started on Monday in Villareggio, Italy. A whopping 132 boats are taking part, with the entire fleet starting on one line for each race.

Peter O'Leary and David Burrows, sailing together for the first time, are the top Irish boat at present, lying in 43rd position, carrying a 44th and a 52nd in the two races so far. Max Treacy and Anthony Shanks are further back in 77th, with a scoreline including a 95th and 57th. 

Racing continues today. 

EVENT WEBSITE

(PS: Bonus video below from photog Amory Ross)

 

 

 

Published in Olympics 2012

Ireland's two Star crews line up against each other next week for the first time in what will be their final configurations. Both crews take part in the Star Europeans in Villareggio, with a record entry of 149 boats, all sailing the one start line and the one course.

Max Treacy and Anthony Shanks will take to the water against Peter O'Leary and former Olympian David Burrows, who pair up for the first time in competition.

Registration and practice takes place over the weekend, with racing starting on Monday.

News, when it emerges, will feature on the OFFICIAL WEBSITE.

 

Published in Olympics 2012

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020