Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: TWOSTAR

Despite hopes earlier this year that the event would go ahead as planned, the Royal Western Yacht Club of England has formally announced that the OSTAR & TWOSTAR 60th anniversary race is postponed to May 2022.

Last year’s event was postponed amid the first weeks of the coronavirus pandemic, with a new start date set for 9 May 2021.

But following an update on COVID-19 compliance and revised restrictions from the Newport Yacht Club in the US, the RWYC “made the very reluctant decision to postpone the OSTAR & TWOSTAR races once again”.

Rear Commodore Oceanic and race director, Adrian Gray, said, “CV-19 rules for entering both the UK and USA have led to a last-minute reduction of entries due to them being unable to comply with these measures.

“This in turn as made the running of OSTAR and TWOSTAR physically and financially unviable for 2021.

“Therefore, we have no alternative but to postpone the running of the 60th anniversary race again, now to a new date of May 15th, 2022.”

He continued: “COVID is still a threat to us all and we must remain cognisant of all this means. However, the vaccine is being rolled out now and so we see this as a very positive thing from the summer onwards.

“Unfortunately, Atlantic weather systems prevent us from looking at a start later this year, but we are sure that the OSTAR will return with a much bigger fleet and a world in a much healthier position [in 2022].”

The 60th anniversary race entry List will officially reopen on 9 May but expressions of interest can be sent now to [email protected]

In addition, the RWYC confirms that next year’s OSTAR will remain as a recognised mile builder and qualifier for the Global Solo Challenge, a non-stop round-the-world event set for 2023.

Published in Offshore
Tagged under

This year’s OSTAR and TWOSTAR races are going ahead as planned, the Royal Western Yacht Club of England has confirmed.

Organisers say that after consultation with finishing hosts Newport Yacht Club in Rhode Island, they are “confident that we can provide a COVID-safe start and finish to the race”.

Last year’s event was postponed amid the first weeks of the coronavirus pandemic, with a new start date set for 9 May 2021.

RWYC Commodore Chris Arscott commented: “The OSTAR has been a breeding ground for some of the world’s best known and most successful sailors including Sir Francis Chichester, Eric Tabarly and Loick Peyron.

“In 2007 the race returned to its Corinthian roots and has continued to offer the stars of the future a springboard as the toughest amateur/semi-pro solo races there is. This year will be no different with what is already a strong list of entries.”

Many of these entries will use the 60th OSTAR as their qualifying passage and training for the Global Solo Challenge, a non-stop round-the-world event set for 2023.

The RWYC adds that provision has been made in the Notice of Race “to ensure that COVID does not cost our competitors financially”.

Entry is still open for the MailASail OSTAR and TWOSAR 2021 but prospective competitors are asked to contact the RWYC at [email protected] as soon as possible. A completed entry form with deposit is required to secure entry.

There is a potential delay allowance window of three weeks should this be required based on COVID restrictions. Should the race need to have an extended postponement at short notice due to COVID, then full refunds will be offered.

Published in Offshore
Tagged under

Yachting Monthly is reporting that organisers of the OSTAR and TWOSTAR transatlantic races have postponed this year’s events until 2021 due to the Covid-19 pandemic.

The single-handed and two-handed fleets had been scheduled to set sail from Plymouth on Sunday 10 May in what is their 60th anniversary year, hosted by the city’s Royal Western Yacht Club.

In a statement issued on Monday afternoon (16 March), the RWYC said it aims to run the events “over a similar period in 2021”.

It added: “Since this will require compliance to the latest edition of Word Sailing OSRs for Cat 1 yachts, there will be a new Notice of Race, which will be issued in due course.”

Updated Wednesday 18 March to include details of the RWYC's official statement.

 

Plymouth’s Royal Western Yacht Club has confirmed that it will run its OSTAR and TWOSTAR transatlantic races in 2020 from Britain’s Ocean City as it has done every four years since the first race in 1960.

“These races from Plymouth to Newport, Rhode Island will continue to be sailed as originally envisaged by Cockleshell hero Blondie Hasler, a test of skipper and boat against the North Atlantic Ocean,” said the club, which will next year celebrate 60 years since it introduced short-handed oceanic racing.

The OSTAR and TWOSTAR events will also be supported by Plymouth City Council as part of next year’s Mayflower 400 celebrations.

“Unfortunately the French organisers of The Transat 2020 have now decided to start their race in Brest rather than Plymouth,” the Plymouth club added. “This deprives the skippers and public of the opportunity to meet and share in the 60th anniversary of the OSTAR.”

The RWYC explained that The Transat was first sailed in 2004 when it decided it could no longer afford the cost or responsibility of running a ‘Grand Prix’ type event for the larger, one-design, highly sponsored and professionally skippered boats.

“The RWYC selected a commercial events organisation to run this part of the race while they continued to run the OSTAR, for professional and experienced skippers alike sailing any class of boat, as the corinthian event envisaged by the original participants 60 years ago.”

Published in Offshore

#OSTAR - The OSTAR and TWOSTAR fleets have seen a slew of retirements after a storm hit the fleet in the North Atlantic on Friday (9 June), leaving one yacht abandoned and another dismasted.

According to Yachting & Boating World, the ocean liner Queen Mary 2 changed course to pick up solo sailor Melvyn Wheatley after his yacht Tamarind had its mast go under and flooded through a smashed porthole.

Wheatley (73), who scuttled the vessel for the safety of shipping traffic, was down below when the yacht took damage — with his wife later commenting that he was lucky to survive the “nightmare” conditions.

Elsewhere, the Bulgarian crew of Furia, a Luffe 37-09 in the TWOSTAR, were rescued by a survey vessel after their boat sank, while the crew of the Sunfast 37 named Happy were picked up by a tug when their yacht dismasted.

Other retirements include British OSTAR competitors Keith Walton, whose Najad 490 Harmoni is Azores bound with mainsail damage, and Peter Crowther, whose Swan 38 Suomi Kudu has turned around for the UK also with mainsail issues.

Despite the “extreme conditions” in what were described as hurricane winds, and with swells persisting in excess of 10 metres, there were no reported injuries across the fleet.

And Conor Fogerty’s BAM continues apace, lucky to be ahead of the storm when it struck the back of the fleet on the east of the track.

As of last night (Saturday 10 June) the Howth Yacht Club sailor’s Sunfast 3600 was making big gains despite the tough conditions, second to OSTAR leaders Vento and only a few hours behind on time.

WMN Nixon adds:  Ireland’s Conor Fogerty clear of worst of OSTAR’s Atlantic storm

Ireland’s entry in OSTAR 2017 Conor Fogerty of Howth, having started on May 29th from Plymouth in Devon to race Transatlantic to Newport Rhode Island), has been putting in such a good performance that he has his Sunfast 3600 Bam safely to the west of the worst of the the mid-Atlantic storm mayhem which has resulted in a sinking, and five OSTAR/TWOSTAR sailors being rescued, with the liner Queen Mary playing a major role in the retrieval incident writes W M Nixon.

Although the clear leader is Andrea Mura with the Open 60 Venta di Sardegna. who has only 572 miles still to race, despite Fogerty being the smallest boat of those at the front of the fleet, he is in near-contact with the Uwe Pajkowska’s Open 40 Rote 66, which is second on the water and is actually two-handed in the TWOSTAR division. Pajkowska has 1158 miles to race while the solo-sailed Bam is on 1186 to lie either second overall or third, depending on which category is used for the rankings.

Update Monday, June 12:  

North Atlantic Storm Hits OSTAR & TWOSTAR Fleet
In the early hours of Friday 9th June, 60 knot winds and 15 metre seas were experienced by competitors, caused by a very low depression (967 mb). These extreme conditions caused damage to many boats with 3 emergency beacons (EPIRB) triggered. The Canadian coastguard in Halifax immediately reacted to the situation sending ships and air support to all the boats in distress.

The boats affected over the past 36 hours are:

TAMARIND - Suffered severe damage. Skipper well with no injuries. Rescued by Queen Mary en route to Halifax.

HAPPY - Dismasted. Both crew rescued by ocean going tug APL FORWARD. No injuries reported.

FURIA - Boat sunk. Crew resuced by survey vessel THOR MAGNA. No injuries reported.

HARMONII - Mainsail and track damage. Retired. Heading under engine for the Azores. Skipper ok, no injuries.

SUOMI KUDU - Mainsail problems. Retired. Heading back to UK. Skipper ok, no injuries.

All other competitors safe but still experiencing a 10 - 15 metre swell, no injuries reported.

The RWYC would like to thank all personnel at the Halifax Coastguard for their immediate and magnificent response to this emergency situation. All seafarers owe them a debt of gratitude

Published in Solo Sailing

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020