Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Winter Mooring

Waterways Ireland advises masters of vessels that the winter mooring period will end this Easter Sunday, 31 March, on the Shannon Navigation and Shannon-Erne Waterway.

Shannon Navigation Bye-law No. 17(3) will apply from 31 March, such that vessels should not berth in the same harbour for longer than the statutory period of five consecutive days nor more than a total of seven days in any one month.

Services were reconnected to Waterways Ireland harbours and jetties from Friday 15 March, the cross-border body for Ireland’s inland waterways adds.

Published in Inland Waterways

Waterways Ireland advises masters that the winter mooring period for public harbours on the Shannon Navigation and Shannon-Erne Waterway will commence on Wednesday 1 November and will end on 31 March next year.

Masters wishing to avail of winter mooring are required to pay the winter mooring fee of €63.50 prior to 1 November. Online registration must be made on the Waterways Ireland website.

The steps in the winter mooring process are as follows:

  1. Apply online for winter mooring at a specific harbour.
  2. Receive email approval/rejection/alternative location of application.
  3. Follow link on approval email when received to pay winter mooring fee online.

Masters are reminded that Bye-Law 17, the ‘five consecutive days/seven days in one month’ rule, continues to apply for masters not availing of winter mooring.

Waterways Ireland will be disconnecting its electricity supply points and water supply at public moorings for the winter period (November–March). Both services will be reinstated prior to the commencement of the 2024 boating season.

Owners should note that vessels are moored in public harbours at the owners risk at all times and may be directed to other harbours as operational exigencies require.

In other news, the cross-border body for Ireland’s inland waterways advises that two green conical aids to navigation — No 1248 upstream of Parteen Weir and No 500 upstream of Lanesboro Bridge — are currently off station. Mariners are requested to exercise care when navigating in these area.

Meanwhile, in Dromod Harbour in Co Leitrim the pump-out station is now fully operational.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Shannon Navigation and Shannon-Erne Waterway that the 2022-23 winter mooring period for public harbours on these navigations has ended as of Friday 31 March.

The cross-border body for Ireland’s inland waterways adds that Shannon Navigation Bye-law No. 17(3) now applies: vessels should not berth in the same harbour for longer than the statutory period of five consecutive days nor more than a total of seven days in any one month.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Shannon Navigation and Shannon-Erne Waterway that the winter mooring period for public harbours on these navigations will commence on Tuesday 1 November.

Masters wishing to avail of winter mooring — which continues until 31 March 2023 — are required to register online and pay the winter mooring fee of €63.50 prior to 1 November.

Masters must apply for winter mooring at a specific harbour. They will then receive by email their approval, rejection or an alternative location of application. Upon approval, follow the link in the email to pay the required fee online.

Masters are reminded that Bye-law 17 of the Canals Act — the “5 consecutive days/ 7 days in one month rule” — continues to apply for those not availing of winter mooring.

Waterways Ireland says it will be disconnecting its electricity supply points and water supply at public moorings for the winter period. Both services will be reinstated prior to the commencement of the 2023 boating season, the cross-border body for Ireland’s inland waterways adds.

Owners are urged to note that vessels are moored in public harbours at the owners risk at all times and may be directed to other harbours “as operational exigencies require”.

Published in Inland Waterways

Waterways Ireland reminds masters of vessels on the Shannon Navigation and Shannon-Erne Waterway that the winter mooring period for these inland waterways ended last Thursday 31 March.

Shannon Navigation Bye-Law No 17(3) now applies, such that vessels should not berth in the same harbour for longer than the statutory period of five consecutive days nor more than a total of seven days in any one month.

Published in Inland Waterways

Waterways Ireland advises masters of vessels that the winter mooring period for public harbours on the Shannon Navigation and Shannon-Erne Waterway will commence on Monday 1 November and will end on 31 March 2022.

Masters wishing to avail of winter mooring on these inland waterways are required to pay the €63.50 fee prior to 1 November. Online registration must be made on the Waterways Ireland website HERE.

To apply, the following steps are involved:

  1. Apply online for Winter Mooring at a specific harbour.
  2. Receive email approval/rejection/alternative location of application.
  3. Follow link on approval email when received to pay winter mooring fee online.

Masters are reminded that Bye-law 17 — the “five consecutive days/seven days in one month” rule — continues to apply for masters not availing of winter mooring.

Waterways Ireland says it will be disconnecting its electricity supply points and water supply at public moorings for the winter period. Both services will be reinstated prior to the commencement of the 2022 boating season.

Masters are also reminded that vessels are moored in public harbours at the owner’s risk at all times and may be directed to other harbours as required.

Published in Inland Waterways

Waterways Ireland reminds masters on the Shannon Navigation and Shannon-Erne Waterway that the winter mooring period for public harbours will commence this Sunday 1 November and continue until 31 March 2021.

Masters wishing to avail of winter mooring on these inland waterways are required to pay the €63.50 fee online before this Sunday. Registration is available at the Waterways Ireland website HERE.

To register, for winter mooring, go by the following steps:

  1. Apply for mooring at a specific harbour
  2. Receive email approval/rejection/alternative location of application
  3. Follow link on approval email when received to pay winter mooring fee online

Masters are reminded that Bye-law 17 — the ‘five consecutive days/seven days in one month rule’ — will continue to apply for masters not availing of winter mooring when the Covid-19 Level 5 restrictions are eased.

Waterways Ireland will be disconnecting its electricity supply points and water supply at public moorings for the winter period. Both services will be reinstated prior to the 2021 boating season.

Owners are urged to note that vessels berthed in public harbours are at the owners’ risk at all times and may be directed to other harbours as required by Waterways Ireland.

Published in Inland Waterways

Waterways Ireland has suspended the five-day mooring rule until late October in the wake of the country’s move to Level 3 coronavirus restrictions.

As of this past Wednesday 7 October, the rule — which prohibits vessels from mooring in one spot for more than five days — has been suspended across Ireland's inland waterways for a three-week period until Tuesday 27 October, at which point restrictions will be reviewed.

Shortly after this, the winter mooring period commences on Sunday 1 November and owners of vessels can apply for permits at the Waterways Ireland website.

All locks, bridges and facilities on the Shannon Navigation and Shannon-Erne Waterway remain open at the scheduled times with the exception of Portora Lock in Enniskillen, which will be temporary closed to boat traffic from 9am to 5pm next Wednesday 14 October for essential maintenance.

Masters of vessels and waterways users in the Republic are also reminded that in accordance with Level 3 restrictions, non-essential travel outside your home county is not allowed at present.

Published in Inland Waterways

Waterways Ireland is advising masters that the winter mooring period for public harbours on the above navigation will commence on 1st Nov 2017 and end on the 31st Mar 2018.

Masters are advised that the associated charges, €63.50, must be paid prior to 1st Nov 2017.

Masters are further reminded that Bye-law 17. Mooring and use of Harbours i.e. the "5 Day Rule" continues to apply during this period and that masters not wishing to avail of winter mooring should continue to observe the mooring time limits for public harbours.

Payment may be made by cheque, bank draft or postal order, made payable to Waterways Ireland, Scarriff Harbour, Ballyminoge, Scarrif, Co. Clare, Ireland. Credit/Debit card payments may be made by contacting Finance Section, Waterways Ireland, Enniskillen, Tel: 048 6632 3004 (from RoI)

Masters should also note that fresh water and electricity supply may not be available during this period at public moorings therefore any on-board services which may be depending on this electrical supply should have an alternative source of power.

Published in Inland Waterways

#WinterBerths - The winter mooring period for 2015-16 is coming up fast, and Ireland's boat owners will undoubtedly be looking for the best deals available.

Last week we put out a call for details on winter packages available from Ireland's marinas and harbours, and those in the Dublin area can benefit from the most options.

As previously reported, Howth Yacht Club got a head start on the competition with their comprehensive winter package, which includes access to the club's full range of facilities and marine services. A few kilometres north, Malahide Marina also offers special rates for winter berthage.

On the south side of Dublin Bay, winter boat storage is always at a premium. But Dun Laoghaire Marina presently has two deals on offer, with winter berthing on the marina for €135/m, as well as a combined package with MGM Boatyard for discounted marina berthing plus lift-out and anti-foul (call 01 202 0040 for details).

The 5 Gold Anchor marina also hosts a full calendar of winter racing with the Dublin Bay Sailing Club for those who may not want to hang up their sailing gear just yet.

It also emphasises that its staff check the marina's moored boats daily to avoid such catastrophes as the grounded yacht off Hook Head last week, which is thought to have slipped free of its moorings.

At the Royal St George, winter lift-out comes early – on Saturday 10 October, just over a week from now – with winter parking allocated on a first come, first served basis. In addition, the club reminds that the usual members rate is not available this season. More details can be found HERE.

Nearby, Western Marine at Dalkey's Bullock Harbour has had a number of upgrades for its latest winter storage season, with its crane once again fully operational (€50 per standard lift-out of 3.5 tonnes and under).

Mains power is available, with no additional cost for use of light power tools, and water can be sourced from a public tap outside the entrance. More details of their services and rates, including special offer discounts, are available HERE.

Further down the coast, Greystones Harbour Marina is providing winter berthing from October to March for €185 per metres. And in the city centre, Poolbeg Marina in Ringsend sees its winter berthing season begin this Thursday 1 October, with rates from €100 per metre.

It's a similar story around the country, with the venerable Royal Cork, for example, offering a rate €25 per foot for winter storage from 1 November.

On the Shannon Navigation and Shannon-Erne Waterway, the winter mooring period for public harbours begins on 1 November, running till 31 March 2016.

Masters are requested to pay the winter mooring fee of €63.50 before 1 November, and are reminded that the 'five-day rule' still applies for those not wishing to avail of winter mooring.

Those looking for some more security for their vessels will want to go private. Butlers Marina in Carrick-on-Shannon offers indoor winter berthage in its secured marina, while Manor Marine on Lough Erne offers both hard stand storage and winter berthing.

And it's not just boats that need berthing or storage or winterising over the coming months.

Rather than leave your lifejackets on board to risk getting damp and attracting mildew while you're not using them, why not have them stored safety by professionals?

Boaters in the UK at least can benefit from SeaSafe's offer of winter lifejacket servicing from over 50 centres around Britain. Servicing starts at £9.95 and SeaSafe will store your PFD till you need it when the 2016 season arrives - or any time in between.

If there are any Irish operations that offer a similar service, we'd love to hear from you.

And if you're a harbour or marina operator with winter berths to offer this season, please leave your details with us (below in comments) or email to [email protected] so they can be added here.

Published in Irish Marinas

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.

©Afloat 2020