Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: 3D seismic survey

#MarineNotice - The latest Marine Notice from the Department of Transport, Tourism and Sport (DDTTAS) advises that Polarcus DMCC is scheduled to carry out a 3D seismic survey in the Porcupine Basin, southwest coast of Ireland, in early September.

The survey will cover 633 sq km and is is expected to last for around 20 days, subject to weather.

The seismic vessel M/V Polarcus Amani (Call sign C6ZD3) is scheduled to carry out the work. The vessel will be towing 10 cables, each 8.1km long with 150m separation at depth of 14 metres, with a total array width of 1.35km.

A buoy equipped with a radar reflector and navigation strobe light will be deployed at the end of each cable.

The seismic vessel will be accompanied by support vessel M/V Bravo Sapphire (Call sign ZDJY8) and chase vessel M/V Nomad (Call sign EI5298). All work vessels will be listening on VHF Channels 16 and 67.

The seismic vessel in particular will be restricted in its ability to manoeuvre while carrying out the survey so all vessels, particularly those engaged in fishing, are requested to give the M/V Polarcus Amani, her towed equipment, the M/V Bravo Sapphire and the M/V Nomad a wide berth and keep a sharp lookout in the relevant areas.

Co-ordinates for the proposed seismic 3D survey are included in Marine Notice No 52 of 2014, a PDF of which is available to read or download HERE.

Published in Marine Warning

#MarineNotice - Dolphin Geophysical AS, on behalf of Capricorn Ireland Limited, is scheduled to carry out a 3D seismic survey in the Northern Porcupine Basin next month.

The survey will cover 1,974.5 sq km off the west coast and is anticipated to commence at the beginning of next month for 45 to 60 days, subject to weather.

The seismic vessel M/V Sanco Sword (Call sign ZDNE7) is scheduled to carry out the work. This vessel will tow 12 cables, each 8km long with 100m separation at a depth of 16-24m below the surface, for a total width array of 1.1km.

The seismic vessel will be accompanied by support vessel M/V Sunrise-G (Call sign 3FKF6) and guard vessel M/V Ary (Call sign YJQJ5).

The seismic vessel will be restricted in its ability to manoeuvre while carrying out the survey, and all vessels are requested to give these 3D survey operations a wide berth. The work vessels will be listening on VHF Channel 16 throughout the project.

All other vessels, particularly those engaged in fishing, are requested to give the M/V Sanco Sword, the M/V Sunrise-G and M/V Ary and their towed equipment a wide berth and keep a sharp lookout in the relevant areas.

Full details of co-ordinates for this survey operation are included in Marine Notice No 44 of 2014, a PDF of which is available to read or download HERE.

Published in Marine Warning

#MarineNotice - The latest Marine Notice from the Department of Transport, Tourism and Sport (DTTAS) advises of a 3D seismic survey in the Porcupine Basin off the Kerry coast to begin in early July for a period of seven weeks, weather permitting.

Polarcus, on behalf of Kosmos Energy Ireland, is scheduled to carry out the work over an area of more than 5,700 square kilometres in a region previously identified as having potential for enormous oil reserves.

Carrying out the survey will be the seismic vessel M/V Polarcus Amani (Call sign: C6ZD3). The vessel will be towing 10 cables, each 7.2km long and 150m apart, at a depth of 10m. The total width of the array is 1.35km. A buoy with a radar reflector and navigation strobe light will be deployed at the end of each cable.

The seismic vessel will also be accompanies by the support vessel M/V Bravo Sapphire (Call sign: ZDJY8) and chase vessel M/V Calvin (Call sign: 3EGU4). All three will be listening on VHF Channel 16 throughout the project.

The work vessels will also be restricted in their ability to manoeuvre while carrying out the survey, and all other vessel are requested to give these operations a wide berth and keep a sharp lookout in the relevant areas.

Full details of co-ordinates and a map of the work area are included in Marine Notice No 28 of 2013, a PDF of which is available to read or download HERE.

Published in Marine Warning

#MarineNotice - CGG, on behalf of Fastnet Oil & Gas, is scheduled to carry out a full 3D seismic survey at Mizzen Basin in the Celtic Sea off the south-west coast beginning this month.

Details of this survey - as part of Fastnet's option on the Deep Kinsale Prospect - were previously reported on Afloat.ie but some details have been amended since.

The survey is expected to run for 35 days, subject to weather.

For full details - including co-ordinates of the work areas - see Marine Notice No 22 of 2013, a PDF of which is available to read or download HERE.

Published in Marine Warning

About Dublin Port 

Dublin Port is Ireland’s largest and busiest port with approximately 17,000 vessel movements per year. As well as being the country’s largest port, Dublin Port has the highest rate of growth and, in the seven years to 2019, total cargo volumes grew by 36.1%.

The vision of Dublin Port Company is to have the required capacity to service the needs of its customers and the wider economy safely, efficiently and sustainably. Dublin Port will integrate with the City by enhancing the natural and built environments. The Port is being developed in line with Masterplan 2040.

Dublin Port Company is currently investing about €277 million on its Alexandra Basin Redevelopment (ABR), which is due to be complete by 2021. The redevelopment will improve the port's capacity for large ships by deepening and lengthening 3km of its 7km of berths. The ABR is part of a €1bn capital programme up to 2028, which will also include initial work on the Dublin Port’s MP2 Project - a major capital development project proposal for works within the existing port lands in the northeastern part of the port.

Dublin Port has also recently secured planning approval for the development of the next phase of its inland port near Dublin Airport. The latest stage of the inland port will include a site with the capacity to store more than 2,000 shipping containers and infrastructures such as an ESB substation, an office building and gantry crane.

Dublin Port Company recently submitted a planning application for a €320 million project that aims to provide significant additional capacity at the facility within the port in order to cope with increases in trade up to 2040. The scheme will see a new roll-on/roll-off jetty built to handle ferries of up to 240 metres in length, as well as the redevelopment of an oil berth into a deep-water container berth.

Dublin Port FAQ

Dublin was little more than a monastic settlement until the Norse invasion in the 8th and 9th centuries when they selected the Liffey Estuary as their point of entry to the country as it provided relatively easy access to the central plains of Ireland. Trading with England and Europe followed which required port facilities, so the development of Dublin Port is inextricably linked to the development of Dublin City, so it is fair to say the origins of the Port go back over one thousand years. As a result, the modern organisation Dublin Port has a long and remarkable history, dating back over 300 years from 1707.

The original Port of Dublin was situated upriver, a few miles from its current location near the modern Civic Offices at Wood Quay and close to Christchurch Cathedral. The Port remained close to that area until the new Custom House opened in the 1790s. In medieval times Dublin shipped cattle hides to Britain and the continent, and the returning ships carried wine, pottery and other goods.

510 acres. The modern Dublin Port is located either side of the River Liffey, out to its mouth. On the north side of the river, the central part (205 hectares or 510 acres) of the Port lies at the end of East Wall and North Wall, from Alexandra Quay.

Dublin Port Company is a State-owned commercial company responsible for operating and developing Dublin Port.

Dublin Port Company is a self-financing, and profitable private limited company wholly-owned by the State, whose business is to manage Dublin Port, Ireland's premier Port. Established as a corporate entity in 1997, Dublin Port Company is responsible for the management, control, operation and development of the Port.

Captain William Bligh (of Mutiny of the Bounty fame) was a visitor to Dublin in 1800, and his visit to the capital had a lasting effect on the Port. Bligh's study of the currents in Dublin Bay provided the basis for the construction of the North Wall. This undertaking led to the growth of Bull Island to its present size.

Yes. Dublin Port is the largest freight and passenger port in Ireland. It handles almost 50% of all trade in the Republic of Ireland.

All cargo handling activities being carried out by private sector companies operating in intensely competitive markets within the Port. Dublin Port Company provides world-class facilities, services, accommodation and lands in the harbour for ships, goods and passengers.

Eamonn O'Reilly is the Dublin Port Chief Executive.

Capt. Michael McKenna is the Dublin Port Harbour Master

In 2019, 1,949,229 people came through the Port.

In 2019, there were 158 cruise liner visits.

In 2019, 9.4 million gross tonnes of exports were handled by Dublin Port.

In 2019, there were 7,898 ship arrivals.

In 2019, there was a gross tonnage of 38.1 million.

In 2019, there were 559,506 tourist vehicles.

There were 98,897 lorries in 2019

Boats can navigate the River Liffey into Dublin by using the navigational guidelines. Find the guidelines on this page here.

VHF channel 12. Commercial vessels using Dublin Port or Dun Laoghaire Port typically have a qualified pilot or certified master with proven local knowledge on board. They "listen out" on VHF channel 12 when in Dublin Port's jurisdiction.

A Dublin Bay webcam showing the south of the Bay at Dun Laoghaire and a distant view of Dublin Port Shipping is here
Dublin Port is creating a distributed museum on its lands in Dublin City.
 A Liffey Tolka Project cycle and pedestrian way is the key to link the elements of this distributed museum together.  The distributed museum starts at the Diving Bell and, over the course of 6.3km, will give Dubliners a real sense of the City, the Port and the Bay.  For visitors, it will be a unique eye-opening stroll and vista through and alongside one of Europe’s busiest ports:  Diving Bell along Sir John Rogerson’s Quay over the Samuel Beckett Bridge, past the Scherzer Bridge and down the North Wall Quay campshire to Berth 18 - 1.2 km.   Liffey Tolka Project - Tree-lined pedestrian and cycle route between the River Liffey and the Tolka Estuary - 1.4 km with a 300-metre spur along Alexandra Road to The Pumphouse (to be completed by Q1 2021) and another 200 metres to The Flour Mill.   Tolka Estuary Greenway - Construction of Phase 1 (1.9 km) starts in December 2020 and will be completed by Spring 2022.  Phase 2 (1.3 km) will be delivered within the following five years.  The Pumphouse is a heritage zone being created as part of the Alexandra Basin Redevelopment Project.  The first phase of 1.6 acres will be completed in early 2021 and will include historical port equipment and buildings and a large open space for exhibitions and performances.  It will be expanded in a subsequent phase to incorporate the Victorian Graving Dock No. 1 which will be excavated and revealed. 
 The largest component of the distributed museum will be The Flour Mill.  This involves the redevelopment of the former Odlums Flour Mill on Alexandra Road based on a masterplan completed by Grafton Architects to provide a mix of port operational uses, a National Maritime Archive, two 300 seat performance venues, working and studio spaces for artists and exhibition spaces.   The Flour Mill will be developed in stages over the remaining twenty years of Masterplan 2040 alongside major port infrastructure projects.

Source: Dublin Port Company ©Afloat 2020.