Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: SAR

Tributes have been paid to one of the Irish Coast Guard's longest serving and most experienced air-sea rescue crew member, according to Lorna Siggins of The Irish Times.

Noel Donnelly (55), who is retiring after more than 30 years' service, worked as winchman and paramedic. He completed his last shift at the Sligo Coast Guard search and rescue base last week and retires officially this month.

Originally from Tyrone, Mr Donnelly began his career with the Air Corps, flying in Alouette and Puma helicopters. He left in 1984 to take a job as a diver with a civil engineering firm in Aberdeen, Scotland, and subsequently worked as an ambulance driver in Co Kildare. For more about this article please click here

Published in Coastguard

Personal Locator Beacons, or PLBs, are portable radio transmitters, which aid the Search & Rescue (SAR) emergency services in the detection and location of persons in distress. These devices operate in a similar manner to Emergency Position Indicating Radio Beacon (EPIRBs) onboard vessels and Emergency Locator Transmitters (ELTs) onboard aircraft, but are unique in that they for personal use and are not registered to a particular vessel or aircraft.

ELTs and EPIRBs have been in operation for several years are proven technologies, which have resulted in many successful search and rescues missions since their inception. More recently technological advances have enabled the construction of light-weight, hand-portable distress transmitters and hence the relatively recent emergence of PLBs onto the market.

In order to maximise the effectiveness of PLB usage, each PLB should be registered so that owner details as well as location details can be communicated to the emergency services which in many cases assists in speeding up rescue operations.

PLB owners can now register their PLB in Ireland using ComReg's new web portal. For more information on how to register your PLB please go to www. Comreg.ie or contact [email protected] or phone 01 804 9600.

Published in Marine Warning

The new SAR contract signed by Minister Dempsey this morning will se CHCI provide five Helicopters that are four Prime Helicopters and a Back Up Helicopter based initially at Shannon Airport. The first S92A will be commissioned at Shannon in the second half of 2012.

The Helicopters are maintained at a state of readiness of not more than 15 minutes from 0830 to 2200 local time, and not more than 45 minutes from 2200 to 0830 local time for each and every day of every year.

Possible Taskings include:

Undertaking SAR operations by day and night, including landing at remote inland areas and hospital landing sites for the purpose of lifting and delivering casualties.

Providing Paramedic-trained and accredited rear crew to assist and evacuate casualties and potential casualties from the sites of appropriate major emergencies on land, including flooding and providing an onboard emergency medical service.

Delivering trained Fire Brigade personnel and trained fire fighting teams with their equipment to ships at sea to direct the fighting of fires. The standard team consists of six personnel and six bags (a total of 900 kg) and must be carried in a single lift.

Delivering trained Health Service Executive (HSE) Marine Ambulance Response Teams (MART) or a similarly equipped and trained medical response team to ships at sea while equipped with Standard Role Equipment and relevant Carry-On Equipment.

Delivering a contractor-owned and maintained pump to vessels that are taking in water faster than their own pumps can handle.

Delivering a normal mountain or cliff rescue team to remote areas throughout Ireland and working with them in the search and rescue of stranded and/or injured people.

Recovering casualties from and operating with RNLI and other rescue boat operators.

Providing an emergency service for the communities on the islands off the west coast. As well as evacuating sick and injured people where life is at risk. The Helicopters may also be tasked to provide assistance in the event of major emergencies such as a fire, flood or deep snow.

Visually assessing, videoing, photographing and sampling marine pollution to assist the containment and dispersion process and to contribute evidence for prosecution and attending court if required.

Carrying loads within the Helicopter's capability, such as equipment to counter marine pollution and flooding.

Carrying ships' pilots and IRCG coordinated search, response, emergency or investigation personnel to and from vessels, installations, incident sites and islands as required.

Assisting the Principal Response Agencies (Garda, HSE, and local authorities), Defence Forces and other Government Departments as required in emergency situations.

Delivering Garda, Navy or similar Water Unit Minimum Dive Teams and their equipment in a single lift to a land destination near the scene of water rescues.

Provide a distress monitoring, and when necessary a communication and coordination service on VHF marine frequencies when airborne.

Crew Experience:

Captains

Total helicopter hours 2500 hours
Hours in command of multi-engined helicopters 1000 hours
Hours on type 250 hours*
Hour in command on type 100 hours*

Co-Pilots

Total helicopter hours 750 hours
Hours on multi-engined helicopters 350 hours
Hours on type 50 hours

Winch Operators

At least one year's experience as a Winch Operator on a dedicated military or civilian SAR unit and at least the EMT qualification accredited by PHECC.

Winchpersons

At least three months experience as a Winchperson on a dedicated military or civilian SAR unit and at least the Paramedic qualification accredited by PHECC.

The S92A:

The S92A will:

• Hover in strong wind up to 35 knots crosswind and tailwind.
• Land, shut down and start on ground sloping up to 10 degrees nose up or down, 13 degrees laterally.

Aircraft Equipment:

• Active Vibration Control to provide better patient care and reduce crew fatigue.
• Composite Blades providing optimised cruise and hover performance at reduced fuel burn rates.
• Modern Cockpit Display System (CDS) affording pilots with greater amounts of available information, allowing for greater safety and situational awareness.

• A 4 Axis Automatic Flight Control System (AFCS) with Flight Director and Auto Hover capability to assist aircrew by providing automated search patterns and pinpoint transitions to and from the hover targets of interest regardless of day of day of weather conditions.

The S92A has one of the largest cabins of any helicopter in its class. At twenty feet long (6.10m) 6' 6" inches feet wide (2.01m) and 6' high (1.83m) the cabin is high enough for the crew to stand, move, manoeuvre patients without injury and deliver patient care effectively.

The aircraft standard range is in the region of 270 nautical miles that can be extended to over 300 nautical miles if required that allows for 30 minutes on scene and can lift over 20 survivors at maximum range. At 60 nautical miles 33 survivors can be recovered.

Maximum speed is in excess of 150 knots.

The Rotor Ice Protection System allows flight in icing conditions up to a maximum of 10,000 ft. The system also includes engine anti-icing through electrical and bleed air heating.

Published in Coastguard
CHC Helicopter has been awarded a 10-year, €500 million contract to provide Search and Rescue services on behalf of the Irish Coast Guard. Ireland's Minister for Transport, Noel Dempsey, will join senior representatives from the Irish Coast Guard and CHC Ireland to officially sign the contract later today.

The contract, will provide SAR services from bases at Waterford, Dublin, Shannon and Sligo from 2012 onwards. CHC already provides SAR services from these bases but the new contract will see the existing fleet of S-61N aircraft replaced with newer Sikorsky S-92A helicopters that are custom fitted for SAR work.

Irish Coast Guard Director Chris Reynolds said, "The Irish Coast Guard provides a diverse range of maritime and land-based SAR activities, ranging from national emergency situations such as the recent flooding seen in Ireland last winter to medevac from our Islands, mountains, fishing vessels and incidents involving leisure activity."

"It is essential we have the right stepped increase in capabilities going forward for the next decade. We are very confident in selecting CHC Helicopter that our decision will continue to deliver excellence, providing the most efficient and effective SAR service for Ireland."

The Irish contract cements CHC Helicopter's position as a world leader in provision of civilian SAR services. In addition to the service already provided in Ireland, CHC currently provides SAR coverage in Australia and the UK, and through its membership in the Soteria consortium, has been identified as the preferred bidder on the UK SAR-H program, a 25-year contract to provide helicopter-based SAR services from 12 bases throughout the UK.

"CHC is internationally recognised as a provider of effective SAR solutions to customers worldwide. In today's very challenging environment, we offer the most efficient, reliable and effective services using industry leading technology," said Tilmann Gabriel, chairman of CHC Ireland and president of CHC Helicopter's European Operations.

Mark Kelly, Managing Director of CHC Ireland, added that Irish citizens could now expect to see many positive changes arise.

"Over the next decade this contract will offer a number of service improvements including the ability to deliver a paramedic to any SAR incident within an hour anywhere on our coastline, ensuring much faster treatment of casualties," he said.

CHC is the world's largest operator of the Sikorsky S-92 helicopter that has a long and distinguished pedigree in SAR operations. There are currently more than 100 S-92 helicopters in operation around the world with a fleet total approaching 250,000 flight-hours.

The state-of-the-art twin-engine aircraft will be specially equipped for SAR operations and capable of flying faster and farther than aircraft currently in use. As well as longer range and improved cruising speeds, the S-92s will be equipped with enhanced rescue mission technology including infra-red and low light cameras, a Nightsun searchlight, a satellite communications system featuring a Flight Following tracking facility, and high speed dual hoists.


Published in Coastguard
Page 3 of 3

About Dublin Port 

Dublin Port is Ireland’s largest and busiest port with approximately 17,000 vessel movements per year. As well as being the country’s largest port, Dublin Port has the highest rate of growth and, in the seven years to 2019, total cargo volumes grew by 36.1%.

The vision of Dublin Port Company is to have the required capacity to service the needs of its customers and the wider economy safely, efficiently and sustainably. Dublin Port will integrate with the City by enhancing the natural and built environments. The Port is being developed in line with Masterplan 2040.

Dublin Port Company is currently investing about €277 million on its Alexandra Basin Redevelopment (ABR), which is due to be complete by 2021. The redevelopment will improve the port's capacity for large ships by deepening and lengthening 3km of its 7km of berths. The ABR is part of a €1bn capital programme up to 2028, which will also include initial work on the Dublin Port’s MP2 Project - a major capital development project proposal for works within the existing port lands in the northeastern part of the port.

Dublin Port has also recently secured planning approval for the development of the next phase of its inland port near Dublin Airport. The latest stage of the inland port will include a site with the capacity to store more than 2,000 shipping containers and infrastructures such as an ESB substation, an office building and gantry crane.

Dublin Port Company recently submitted a planning application for a €320 million project that aims to provide significant additional capacity at the facility within the port in order to cope with increases in trade up to 2040. The scheme will see a new roll-on/roll-off jetty built to handle ferries of up to 240 metres in length, as well as the redevelopment of an oil berth into a deep-water container berth.

Dublin Port FAQ

Dublin was little more than a monastic settlement until the Norse invasion in the 8th and 9th centuries when they selected the Liffey Estuary as their point of entry to the country as it provided relatively easy access to the central plains of Ireland. Trading with England and Europe followed which required port facilities, so the development of Dublin Port is inextricably linked to the development of Dublin City, so it is fair to say the origins of the Port go back over one thousand years. As a result, the modern organisation Dublin Port has a long and remarkable history, dating back over 300 years from 1707.

The original Port of Dublin was situated upriver, a few miles from its current location near the modern Civic Offices at Wood Quay and close to Christchurch Cathedral. The Port remained close to that area until the new Custom House opened in the 1790s. In medieval times Dublin shipped cattle hides to Britain and the continent, and the returning ships carried wine, pottery and other goods.

510 acres. The modern Dublin Port is located either side of the River Liffey, out to its mouth. On the north side of the river, the central part (205 hectares or 510 acres) of the Port lies at the end of East Wall and North Wall, from Alexandra Quay.

Dublin Port Company is a State-owned commercial company responsible for operating and developing Dublin Port.

Dublin Port Company is a self-financing, and profitable private limited company wholly-owned by the State, whose business is to manage Dublin Port, Ireland's premier Port. Established as a corporate entity in 1997, Dublin Port Company is responsible for the management, control, operation and development of the Port.

Captain William Bligh (of Mutiny of the Bounty fame) was a visitor to Dublin in 1800, and his visit to the capital had a lasting effect on the Port. Bligh's study of the currents in Dublin Bay provided the basis for the construction of the North Wall. This undertaking led to the growth of Bull Island to its present size.

Yes. Dublin Port is the largest freight and passenger port in Ireland. It handles almost 50% of all trade in the Republic of Ireland.

All cargo handling activities being carried out by private sector companies operating in intensely competitive markets within the Port. Dublin Port Company provides world-class facilities, services, accommodation and lands in the harbour for ships, goods and passengers.

Eamonn O'Reilly is the Dublin Port Chief Executive.

Capt. Michael McKenna is the Dublin Port Harbour Master

In 2019, 1,949,229 people came through the Port.

In 2019, there were 158 cruise liner visits.

In 2019, 9.4 million gross tonnes of exports were handled by Dublin Port.

In 2019, there were 7,898 ship arrivals.

In 2019, there was a gross tonnage of 38.1 million.

In 2019, there were 559,506 tourist vehicles.

There were 98,897 lorries in 2019

Boats can navigate the River Liffey into Dublin by using the navigational guidelines. Find the guidelines on this page here.

VHF channel 12. Commercial vessels using Dublin Port or Dun Laoghaire Port typically have a qualified pilot or certified master with proven local knowledge on board. They "listen out" on VHF channel 12 when in Dublin Port's jurisdiction.

A Dublin Bay webcam showing the south of the Bay at Dun Laoghaire and a distant view of Dublin Port Shipping is here
Dublin Port is creating a distributed museum on its lands in Dublin City.
 A Liffey Tolka Project cycle and pedestrian way is the key to link the elements of this distributed museum together.  The distributed museum starts at the Diving Bell and, over the course of 6.3km, will give Dubliners a real sense of the City, the Port and the Bay.  For visitors, it will be a unique eye-opening stroll and vista through and alongside one of Europe’s busiest ports:  Diving Bell along Sir John Rogerson’s Quay over the Samuel Beckett Bridge, past the Scherzer Bridge and down the North Wall Quay campshire to Berth 18 - 1.2 km.   Liffey Tolka Project - Tree-lined pedestrian and cycle route between the River Liffey and the Tolka Estuary - 1.4 km with a 300-metre spur along Alexandra Road to The Pumphouse (to be completed by Q1 2021) and another 200 metres to The Flour Mill.   Tolka Estuary Greenway - Construction of Phase 1 (1.9 km) starts in December 2020 and will be completed by Spring 2022.  Phase 2 (1.3 km) will be delivered within the following five years.  The Pumphouse is a heritage zone being created as part of the Alexandra Basin Redevelopment Project.  The first phase of 1.6 acres will be completed in early 2021 and will include historical port equipment and buildings and a large open space for exhibitions and performances.  It will be expanded in a subsequent phase to incorporate the Victorian Graving Dock No. 1 which will be excavated and revealed. 
 The largest component of the distributed museum will be The Flour Mill.  This involves the redevelopment of the former Odlums Flour Mill on Alexandra Road based on a masterplan completed by Grafton Architects to provide a mix of port operational uses, a National Maritime Archive, two 300 seat performance venues, working and studio spaces for artists and exhibition spaces.   The Flour Mill will be developed in stages over the remaining twenty years of Masterplan 2040 alongside major port infrastructure projects.

Source: Dublin Port Company ©Afloat 2020.