Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Service Resumes

The main Isle of Arran ferry which operates the Ardrossan-Brodick route, reveals Caledonian MacBrayne (CalMac) will be futher delayed until at least March, reports the Ardrossan&SaltcoatsHerald.

MV Caledonian Isles which is undergoing annual overhaul at Dales Marine Service, Greenock, as Afloat reported yesterday, was supposed to be back on the route tomorrow, 25 January.

According to CalMac the ferry will however remain out of action for weeks as it requires more steel repairs.

This will lead to the MV Isle of Arran -also currently out of action - could be the only ferry on the Ardrossan-Brodick route until March 6 at least. (Noting, in an update, Afloat.ie can confirm, following repairs and sea-trials, the ferry was tracked today, with the 13:55hrs sailing from Arran to the mainland which was completed just before 14:45hrs), for further detailed sailing updates, click CalMac’s service status here and information including the chartered catamaran MV Alfred.

As for the setback with MV Caledonian Isles, this is the latest blow to hit the Arran ferry service in recent weeks, given the cancellations due to storms, notably this week and issues at the ‘Irish’ berth in Ardrossan which led to its closure following a dive survey. The resultant impact is on the MV Alfred, the temporary replacement for the Caledonian Isles, which can't operate out of Ardrossan.

With the MV Isle of Arran having to be sidelined too after a fault was discovered on the main starboard engine on the 40-year-old veteran vessel, essential maintenance was carried out while the ferry was out of action during the Storms Isha/Jocelyn.

The ferry however resumed service today as the part needed to repair MV Isle of Arran, thankfully had arrived and engineers worked on the ferry with the sea trials as expected were carried out this morning.

More here on the Firth of Clyde short-sea service route which takes just under an hour’s passage time.

Published in Ferry

Ferry sailings linking Douglas, Isle of Man and Liverpool have resumed for the first time this year following the easing of the island's border restrictions.

As BBC News writes, limited passenger demand had seen the Ben-my-Chree operate only Heysham services.

The Manannan traditionally starts its Liverpool crossings in March each year.

Almost 600 passengers were due to travel on Thursday, the Isle of Man Steam Packet Company said.

The majority of those people were due to arrive on the island from Liverpool on the afternoon and evening return crossing.

Changes to the island's border restrictions mean that people from the UK, Ireland and Channel Islands who have been fully vaccinated against Covid-19 for at least two weeks can travel to the island freely without testing or isolation.

About 31,600 passengers have booked to travel on the Steam Packet vessels during July, 16,955 of which are due to sail on the Manannan

Published in Ferry

It has been confirmed by Brittany Ferries that its Cork-Roscoff route will resume service this Friday as expected.

The announcement reports EchoLive.ie comes three weeks after the Pont Aven ferry suffered a hydraulic failure impacting thousands of people expecting to sail between Cork and the French port.

Difficulties in securing parts for repairs to the ship meant the vessel was out of action longer than Brittany Ferries had originally expected.

While Brittany Ferries said it was working with those affected in arranging alternative plans or refunds, some people felt they were left in the dark.

More on the story can be read here

Published in Ferry

About Dublin Port 

Dublin Port is Ireland’s largest and busiest port with approximately 17,000 vessel movements per year. As well as being the country’s largest port, Dublin Port has the highest rate of growth and, in the seven years to 2019, total cargo volumes grew by 36.1%.

The vision of Dublin Port Company is to have the required capacity to service the needs of its customers and the wider economy safely, efficiently and sustainably. Dublin Port will integrate with the City by enhancing the natural and built environments. The Port is being developed in line with Masterplan 2040.

Dublin Port Company is currently investing about €277 million on its Alexandra Basin Redevelopment (ABR), which is due to be complete by 2021. The redevelopment will improve the port's capacity for large ships by deepening and lengthening 3km of its 7km of berths. The ABR is part of a €1bn capital programme up to 2028, which will also include initial work on the Dublin Port’s MP2 Project - a major capital development project proposal for works within the existing port lands in the northeastern part of the port.

Dublin Port has also recently secured planning approval for the development of the next phase of its inland port near Dublin Airport. The latest stage of the inland port will include a site with the capacity to store more than 2,000 shipping containers and infrastructures such as an ESB substation, an office building and gantry crane.

Dublin Port Company recently submitted a planning application for a €320 million project that aims to provide significant additional capacity at the facility within the port in order to cope with increases in trade up to 2040. The scheme will see a new roll-on/roll-off jetty built to handle ferries of up to 240 metres in length, as well as the redevelopment of an oil berth into a deep-water container berth.

Dublin Port FAQ

Dublin was little more than a monastic settlement until the Norse invasion in the 8th and 9th centuries when they selected the Liffey Estuary as their point of entry to the country as it provided relatively easy access to the central plains of Ireland. Trading with England and Europe followed which required port facilities, so the development of Dublin Port is inextricably linked to the development of Dublin City, so it is fair to say the origins of the Port go back over one thousand years. As a result, the modern organisation Dublin Port has a long and remarkable history, dating back over 300 years from 1707.

The original Port of Dublin was situated upriver, a few miles from its current location near the modern Civic Offices at Wood Quay and close to Christchurch Cathedral. The Port remained close to that area until the new Custom House opened in the 1790s. In medieval times Dublin shipped cattle hides to Britain and the continent, and the returning ships carried wine, pottery and other goods.

510 acres. The modern Dublin Port is located either side of the River Liffey, out to its mouth. On the north side of the river, the central part (205 hectares or 510 acres) of the Port lies at the end of East Wall and North Wall, from Alexandra Quay.

Dublin Port Company is a State-owned commercial company responsible for operating and developing Dublin Port.

Dublin Port Company is a self-financing, and profitable private limited company wholly-owned by the State, whose business is to manage Dublin Port, Ireland's premier Port. Established as a corporate entity in 1997, Dublin Port Company is responsible for the management, control, operation and development of the Port.

Captain William Bligh (of Mutiny of the Bounty fame) was a visitor to Dublin in 1800, and his visit to the capital had a lasting effect on the Port. Bligh's study of the currents in Dublin Bay provided the basis for the construction of the North Wall. This undertaking led to the growth of Bull Island to its present size.

Yes. Dublin Port is the largest freight and passenger port in Ireland. It handles almost 50% of all trade in the Republic of Ireland.

All cargo handling activities being carried out by private sector companies operating in intensely competitive markets within the Port. Dublin Port Company provides world-class facilities, services, accommodation and lands in the harbour for ships, goods and passengers.

Eamonn O'Reilly is the Dublin Port Chief Executive.

Capt. Michael McKenna is the Dublin Port Harbour Master

In 2019, 1,949,229 people came through the Port.

In 2019, there were 158 cruise liner visits.

In 2019, 9.4 million gross tonnes of exports were handled by Dublin Port.

In 2019, there were 7,898 ship arrivals.

In 2019, there was a gross tonnage of 38.1 million.

In 2019, there were 559,506 tourist vehicles.

There were 98,897 lorries in 2019

Boats can navigate the River Liffey into Dublin by using the navigational guidelines. Find the guidelines on this page here.

VHF channel 12. Commercial vessels using Dublin Port or Dun Laoghaire Port typically have a qualified pilot or certified master with proven local knowledge on board. They "listen out" on VHF channel 12 when in Dublin Port's jurisdiction.

A Dublin Bay webcam showing the south of the Bay at Dun Laoghaire and a distant view of Dublin Port Shipping is here
Dublin Port is creating a distributed museum on its lands in Dublin City.
 A Liffey Tolka Project cycle and pedestrian way is the key to link the elements of this distributed museum together.  The distributed museum starts at the Diving Bell and, over the course of 6.3km, will give Dubliners a real sense of the City, the Port and the Bay.  For visitors, it will be a unique eye-opening stroll and vista through and alongside one of Europe’s busiest ports:  Diving Bell along Sir John Rogerson’s Quay over the Samuel Beckett Bridge, past the Scherzer Bridge and down the North Wall Quay campshire to Berth 18 - 1.2 km.   Liffey Tolka Project - Tree-lined pedestrian and cycle route between the River Liffey and the Tolka Estuary - 1.4 km with a 300-metre spur along Alexandra Road to The Pumphouse (to be completed by Q1 2021) and another 200 metres to The Flour Mill.   Tolka Estuary Greenway - Construction of Phase 1 (1.9 km) starts in December 2020 and will be completed by Spring 2022.  Phase 2 (1.3 km) will be delivered within the following five years.  The Pumphouse is a heritage zone being created as part of the Alexandra Basin Redevelopment Project.  The first phase of 1.6 acres will be completed in early 2021 and will include historical port equipment and buildings and a large open space for exhibitions and performances.  It will be expanded in a subsequent phase to incorporate the Victorian Graving Dock No. 1 which will be excavated and revealed. 
 The largest component of the distributed museum will be The Flour Mill.  This involves the redevelopment of the former Odlums Flour Mill on Alexandra Road based on a masterplan completed by Grafton Architects to provide a mix of port operational uses, a National Maritime Archive, two 300 seat performance venues, working and studio spaces for artists and exhibition spaces.   The Flour Mill will be developed in stages over the remaining twenty years of Masterplan 2040 alongside major port infrastructure projects.

Source: Dublin Port Company ©Afloat 2020.