Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Waterways Ireland

Waterways Ireland has announced that Portumna's Castle harbour opened to vessels for berthing the first weekend in June following extensive renovation and upgrade.

The harbour works included the doubling of mooring capacity at this ever popular location, upgrade of berths, re-paving of quay area and installation of cut stone walls.

While the Harbour is now re-opened for boats, works to the onshore services including the upgrade of the service block, car parking, services for camper vans and access road continue and are expected to be completed in early September.

The project is funded through the Lough Derg Stimulus Fund (administered by Fáilte Ireland), by Galway County Council and Waterways Ireland.

Éanna Rowe, Regional Manager, Waterways Ireland said "I am especially pleased that the harbour is re-opening this weekend to boats and given the increased capacity now in the harbour I am full sure that Portumna can continue to benefit from the Shannon and its inland boating fraternity". Mr. Rowe added that he wanted to complement the Waterways Ireland Operations Team for their efforts and endeavours in providing yet another top class waterway product on the Shannon Navigation.

Published in Inland Waterways

Limerick's newly appointed Minister of State Patrick O'Donovan has been asked to intervene with Waterways Ireland to reopen navigation of the River Shannon at Limerick city and avoid the loss of marine tourism revenue to the city writes Andrew Carey.

As Afloat.ie reported earlier, on April 25, Waterways Ireland issued a marine notice advising all users that the river from Limerick city to Parteen Weir would close to navigation.

It cited the "continuing high flow rates and infrastructural deficiencies as a result of the winter storms and subsequent flooding" as reasons for the closure.

Waterways Ireland said that the "floating breakwater at the entrance to the Abbey River in Limerick is no longer in place to protect vessels from striking the fixed weir. Also, there are many strong currents and eddies making navigation dangerous for both large and small craft.

A safety inspection of other damaged floating pontoons further upstream was to be carried out "when water levels and flows permit. Meanwhile, users are advised to stay clear of these until a further Marine Notice is issued on this matter."

Remedial works have yet to take place and the waterway remains closed to all marine traffic during the peak summer season.

Sailors from local sailing clubs wishing to access the Shannon now face the prospect of missing completions and events around the west coast and beyond as they can not pass through the navigation.

Last year, a six point plan to boost marine tourism on the Shannon and in Limerick was launched by then Education Minister Jan O'Sullivan.

The plans, drafted by Limerick marine enthusiasts to benefit local tourism, heritage and education, were submitted to Waterways Ireland.

Well-known boatman Pat Lysaght said that "Limerick is effectively landlocked and until these issues are rectified we will continue to lose out".

Calling for immediate intervention by Minister O'Donovan, who has responsibility for tourism and sport, Cllr Emmett O'Brien said the closure of the waterway "means no boats can sail from Limerick city to Killaloe. This may have a serious impact on local tourism and is contrary to all lip service being paid to Limerick being a riverside city.

"We need a clear and accurate response from Waterways Ireland and the Council why this has occurred and our local Minister for State for Tourism must intervene to ensure this navigation route does not remain closed."

Fianna Fáil Deputy Niall Collins said that it was of huge concern that "Limerick City is effectively closed off to marine tourism and this is having a detrimental impact on tourism across the Shannon region.

“I’m calling on Waterways Ireland to outline when the navigational hazards it has identified along the river will be addressed. We need to know the planned schedule of works and when the river will be reopened to marine traffic.

"We can’t have a situation whereby boats cannot sail up or down the River Shannon during the peak of the tourist season. This needs to be addressed without delay."

At the time of going to press, Limerick City Council and Minister O'Donovan had failed to respond to queries.

Waterways Ireland issued this statement on Wednesday afternoon.

"The stretch of navigation from Limerick city to Parteen Weir remains closed to navigation due to continuing infrastructural deficiencies as a result of the winter storms and subsequent flooding.

"Waterways Ireland, following the 2015/2016 flooding event has and continues to restore the infrastructure right along the Shannon navigation following on from the damage caused by record flood levels and the prolonged duration of these floods during last winter.

"However, Waterways Ireland has limited resources available to it and has had to prioritise its' interventions in those areas of greatest need and use."

The statement did not indicate any timeframe for reopening of the navigation.

Published in Inland Waterways

#WaterSafety - Waterways Ireland has echoed the recent advice over the dangers of the water during the current warm spell across Ireland.

The latest marine notice from the management body for Ireland's inland navigations warns the public on the dangers of swimming and diving in and around navigation infrastructure such as bridges, locks, weirs, pontoons and harbour jetties.

The possibility of a swimmer being struck by a vessel, its propeller or being run over is ever present while powered craft are manoeuvring. Swimming is therefore prohibited at these locations.

It follows similar warnings from the Irish Coast Guard, RNLI and Irish Water Safety urging caution to anyone engaged in activities on or near the water this summer.

The latest incident saw a 12-year-old boy airlifted to University Hospital Galway after wounding his leg on a jagged rock while cliff diving in the Gaeltacht, as Independent.ie reports.

Published in Water Safety

#InlandWaters - The Waterways Ireland Docklands Summer Festival takes place this weekend 21-22 May with a wide array of activities for all.

Water-based experiences include kayaking, paddle boarding and barge rides, as well as the opportunity for the young and old to try their hand at a range of interesting water sports.

If you'd prefer to stay dry, events for land-lubbers include water golf off the jetty or the rubber duck race.

The festival promises a hive of activity across the Docklands, with entertainment and family fun guaranteed. Find out more HERE.

This Saturday 21 May also sees the Waterways Ireland Loughfest take place at the Fermanagh Lakeland Forum in Enniskillen.

The annual extravaganza, organised by Fermanagh and Omagh District Council, promises to be a fun-packed day for all the family, with a range of events taking place on Lough Erne and the Broadmeadow from 12 noon till 4pm. Details are HERE.

Published in Inland Waterways

#InlandWaters - Waterways Ireland's 2016 event programme launches 120 events celebrating the arts, heritage, adventure, and sporting communities along Ireland's inland waterways.

Now in its tenth year, the programme has sponsored over 700 events with a knock-on effect of €80m in benefits to the local waterway communities. Information on all fun activities and events can be found on the Waterways Ireland website.

Events in the programme this year include TriAthlone on Lough Ree, TriAthy X in Athy on the Barrow, the Killaloe Water Festival on Lough Derg, the Erne Classic Fishing Festival, the Shannon Blueway Adventure Festival, the Docklands Summer Festival and Phizzfest in Dublin, and the Waterways Ireland Riverfest on the Lower Bann, which this year hosts the European Boat Wakeboard Championships.

"These events supported by Waterways Ireland have revitalised rural and small urban communities, and have facilitated the development of local community associations, leading to real economic and social impacts," says Sharon Lavin, head of marketing and communications at Waterways Ireland.

"The Waterways Ireland Sponsorship Programme in 2015 supported the participation of almost 38,000 people directly in waterway activity and welcomed over 160,000 spectators to waterway events along the navigations. The economic impact of the 2015 programme along is estimated at €7.8m."

The programme announcement comes after Waterways Ireland announced its 2016 boating season, which kicked off earlier this month.

In other news, over 90 local businesses attended the 'Build Your Blueway' Networking Expo recently at The Bush Hotel in Carrick-on-Shannon, creating and developing new business opportunities across Cavan, Roscommon, Longford and Leitrim.

Organised by the Upper Shannon Erne Future Economy Project in conjunction with Waterways Ireland, the event offered activity, arts, heritage and cultural businesses the opportunity to present their business, network and develop cross-selling options with accommodation providers and others in a series of sessions.​​

Published in Inland Waterways

Waterways Ireland has announced its 2016 inland waters boating season with the winter mooring period ending on the Shannon and Shannon-Erne Waterway. Boaters are invited to shake off the winter blues, refloat their boats and plan ahead to get the most out of the upcoming season.

Our waterfront locations, towns and villages are very attractive places for boaters to visit. A necklace of harbours, marinas and jetties complement these towns and allow access to them. However as the season progresses, some boats overstay their welcome on these free moorings causing inconvenience to other boat users and denying access to the facilities themselves and towns and villages along the navigations .

Boat users should be aware that from the 31st of March, the 5 day rule will again apply at all Waterways Ireland moorings on the Shannon and Shannon-Erne waterways. Boats users may remain in one location for up to 5 days and then must leave that public mooring to allow for other boat users arrive and enjoy the wonderful facilities at these locations.

Meanwhile, The schedule of Newcomen Bridge lift dates at the Royal Canal in Dublin for 2016 is now updated. Planned lifts after June have had to be cancelled until necessary upgrade works are completed. A further Marine Notice will issue to advise.

Arrangements have been made for Irish Rail to open the bridge on the above dates / times, if there is demand.

Thursday 14th April 11am - 1pm
Sunday 1st May 9am - 1pm
Saturday 28th May 9am - 1pm
Tuesday 14th June 11am - 1pm

 

 

Published in Inland Waterways
Tagged under

#InlandWaters - Waterways Ireland has hosted a series of successful site visits and workshops for primary pupils to visit the Barrow Navigation and the Erne System as part of Engineers Week 2016.

Now in its 10th year, Engineers Week is a programme of nationwide events with the aim of celebrating the world of engineering in Ireland.

The theme for 2016 was 'Engineering Our Future' – aimed at igniting the imaginations of the next generation of engineers.

More than 50 pupils from St Johns NS, Monasterevin and Kildangan NS came to the Barrow in Monasterevin to meet the Waterways Ireland engineering staff who brought them on a tour around the operation of the lifting bridge, the aqueduct and the lock.

Meanwhile, over 75 students from Brookeborough PS, Jones Memorial PS and Ederney PS visited Waterways Ireland headquarters in Enniskillen where engineers led them through a series of workshops including bridge building, making floating and fixed jetties, marshmallow challenges and the Archimedes Screw.

According to Waterways Ireland, feedback from schools has been very positive with many expressing interest in attending future educational events – and a number of children stating that they want to become engineers in the future.

Engineers Week highlights the range of work undertaken by the engineering staff of Waterways Ireland, which employs civil and mechanical engineers and technicians on a range of projects on all seven navigations managed by the organisation.

Projects include navigation operation, maintenance and development, structural design, project management, fleet management, development and maintenance of electro-hydraulically operated lock gates and accompanying smart card system, and many more.

Waterways Ireland has brought over 1,500 pupils to the waterways principally for Engineers Week over the last three years of the programme.

Published in Inland Waterways

As Afloat.ie previously highlighted, Waterways Ireland has announced a Heritage Grants programme in support of the Waterways Ireland Heritage Plan 2016-2020. 

A fund of €20,000 has been allocated to assist community based heritage projects which compliment or fulfil the delivery of the Waterways Ireland Heritage Plan along the Barrow Navigation, Erne System, Grand Canal, Lower Bann, Royal Canal, Shannon, Shannon-Erne, and the Ulster Canal (Upper Lough Erne to Clones).

Applications will be considered from communities seeking assistance for projects related to inland waterways' heritage including data collection & research, good heritage practice in managing sites, collections, objects, etc. And support fresh approaches and initiatives that link heritage to communities, promoting active engagement with heritage.

A range of criteria will be used to assess the applications for support including how well the project compliment or fulfils an action of the Waterways Ireland Heritage Plan 2016-2020, the extent to which proposed activities benefits local heritage and will benefit intended target group or area, the level of innovative and the capacity of applicants to carry out the proposed project. Some types of support will not be considered under the Waterways Ireland's Heritage Grant Scheme.

The Application Form and Guidelines should be reviewed for clear information on project eligibility,

The deadline for receipt of completed applications is 22 April 2016.​ Only one grant per organisation is permitted. Grants up to €1,500 / £1,200 are available.

For view the Heritage Plan, seek more information and the application pack please visit www.waterwaysireland.org. As this is the first year of the Heritage Grant Scheme, assistance is being provided by phone or email for communities who would like help completing the application process. Contact Cormac McCarthy at [email protected], +353 (0)61-92214 for assistance.

Published in Inland Waterways
Tagged under

#InlandWaters - Waterways Ireland have announced a Heritage Grants programme in support of its Heritage Plan 2016-2020.

A total of €20,000 has been allocated to help further community-based heritage projects on inland waterways and navigations under the auspices of Waterways Ireland.

Projects must compliment or fulfil the delivery of the Waterways Ireland Heritage Plan, which is available to download HERE.

Application forms with detailed guidelines and eligibility criteria are available in PDF and Microsoft Word formats.

As this is the first year of the grant, contact Cormac McCarthy for any assistance at [email protected] or 061 922 149 or 087 278 7463. The deadline for receipt of applications is Friday 22 April.​

Published in Inland Waterways

Waterways Ireland has been requested by An Garda to limit boat movements on the Royal and Grand Canals in the Kildare area throughout this week from 25 to 31 January, during the course of an on-going investigation, particularly from the Dublin county boundary to Sallins and Maynooth respectively on the two canals.

Waterways Ireland asks that owners and masters abide by this request, and plan boat movements accordingly.

Published in Inland Waterways
Page 52 of 67

About Dublin Port 

Dublin Port is Ireland’s largest and busiest port with approximately 17,000 vessel movements per year. As well as being the country’s largest port, Dublin Port has the highest rate of growth and, in the seven years to 2019, total cargo volumes grew by 36.1%.

The vision of Dublin Port Company is to have the required capacity to service the needs of its customers and the wider economy safely, efficiently and sustainably. Dublin Port will integrate with the City by enhancing the natural and built environments. The Port is being developed in line with Masterplan 2040.

Dublin Port Company is currently investing about €277 million on its Alexandra Basin Redevelopment (ABR), which is due to be complete by 2021. The redevelopment will improve the port's capacity for large ships by deepening and lengthening 3km of its 7km of berths. The ABR is part of a €1bn capital programme up to 2028, which will also include initial work on the Dublin Port’s MP2 Project - a major capital development project proposal for works within the existing port lands in the northeastern part of the port.

Dublin Port has also recently secured planning approval for the development of the next phase of its inland port near Dublin Airport. The latest stage of the inland port will include a site with the capacity to store more than 2,000 shipping containers and infrastructures such as an ESB substation, an office building and gantry crane.

Dublin Port Company recently submitted a planning application for a €320 million project that aims to provide significant additional capacity at the facility within the port in order to cope with increases in trade up to 2040. The scheme will see a new roll-on/roll-off jetty built to handle ferries of up to 240 metres in length, as well as the redevelopment of an oil berth into a deep-water container berth.

Dublin Port FAQ

Dublin was little more than a monastic settlement until the Norse invasion in the 8th and 9th centuries when they selected the Liffey Estuary as their point of entry to the country as it provided relatively easy access to the central plains of Ireland. Trading with England and Europe followed which required port facilities, so the development of Dublin Port is inextricably linked to the development of Dublin City, so it is fair to say the origins of the Port go back over one thousand years. As a result, the modern organisation Dublin Port has a long and remarkable history, dating back over 300 years from 1707.

The original Port of Dublin was situated upriver, a few miles from its current location near the modern Civic Offices at Wood Quay and close to Christchurch Cathedral. The Port remained close to that area until the new Custom House opened in the 1790s. In medieval times Dublin shipped cattle hides to Britain and the continent, and the returning ships carried wine, pottery and other goods.

510 acres. The modern Dublin Port is located either side of the River Liffey, out to its mouth. On the north side of the river, the central part (205 hectares or 510 acres) of the Port lies at the end of East Wall and North Wall, from Alexandra Quay.

Dublin Port Company is a State-owned commercial company responsible for operating and developing Dublin Port.

Dublin Port Company is a self-financing, and profitable private limited company wholly-owned by the State, whose business is to manage Dublin Port, Ireland's premier Port. Established as a corporate entity in 1997, Dublin Port Company is responsible for the management, control, operation and development of the Port.

Captain William Bligh (of Mutiny of the Bounty fame) was a visitor to Dublin in 1800, and his visit to the capital had a lasting effect on the Port. Bligh's study of the currents in Dublin Bay provided the basis for the construction of the North Wall. This undertaking led to the growth of Bull Island to its present size.

Yes. Dublin Port is the largest freight and passenger port in Ireland. It handles almost 50% of all trade in the Republic of Ireland.

All cargo handling activities being carried out by private sector companies operating in intensely competitive markets within the Port. Dublin Port Company provides world-class facilities, services, accommodation and lands in the harbour for ships, goods and passengers.

Eamonn O'Reilly is the Dublin Port Chief Executive.

Capt. Michael McKenna is the Dublin Port Harbour Master

In 2019, 1,949,229 people came through the Port.

In 2019, there were 158 cruise liner visits.

In 2019, 9.4 million gross tonnes of exports were handled by Dublin Port.

In 2019, there were 7,898 ship arrivals.

In 2019, there was a gross tonnage of 38.1 million.

In 2019, there were 559,506 tourist vehicles.

There were 98,897 lorries in 2019

Boats can navigate the River Liffey into Dublin by using the navigational guidelines. Find the guidelines on this page here.

VHF channel 12. Commercial vessels using Dublin Port or Dun Laoghaire Port typically have a qualified pilot or certified master with proven local knowledge on board. They "listen out" on VHF channel 12 when in Dublin Port's jurisdiction.

A Dublin Bay webcam showing the south of the Bay at Dun Laoghaire and a distant view of Dublin Port Shipping is here
Dublin Port is creating a distributed museum on its lands in Dublin City.
 A Liffey Tolka Project cycle and pedestrian way is the key to link the elements of this distributed museum together.  The distributed museum starts at the Diving Bell and, over the course of 6.3km, will give Dubliners a real sense of the City, the Port and the Bay.  For visitors, it will be a unique eye-opening stroll and vista through and alongside one of Europe’s busiest ports:  Diving Bell along Sir John Rogerson’s Quay over the Samuel Beckett Bridge, past the Scherzer Bridge and down the North Wall Quay campshire to Berth 18 - 1.2 km.   Liffey Tolka Project - Tree-lined pedestrian and cycle route between the River Liffey and the Tolka Estuary - 1.4 km with a 300-metre spur along Alexandra Road to The Pumphouse (to be completed by Q1 2021) and another 200 metres to The Flour Mill.   Tolka Estuary Greenway - Construction of Phase 1 (1.9 km) starts in December 2020 and will be completed by Spring 2022.  Phase 2 (1.3 km) will be delivered within the following five years.  The Pumphouse is a heritage zone being created as part of the Alexandra Basin Redevelopment Project.  The first phase of 1.6 acres will be completed in early 2021 and will include historical port equipment and buildings and a large open space for exhibitions and performances.  It will be expanded in a subsequent phase to incorporate the Victorian Graving Dock No. 1 which will be excavated and revealed. 
 The largest component of the distributed museum will be The Flour Mill.  This involves the redevelopment of the former Odlums Flour Mill on Alexandra Road based on a masterplan completed by Grafton Architects to provide a mix of port operational uses, a National Maritime Archive, two 300 seat performance venues, working and studio spaces for artists and exhibition spaces.   The Flour Mill will be developed in stages over the remaining twenty years of Masterplan 2040 alongside major port infrastructure projects.

Source: Dublin Port Company ©Afloat 2020.