Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: CairnryanBelfast

Ferry services run by Stena Line have resumed between Scotland and Northern Ireland, which were earlier disrupted due to a positive Covid-19 test among its crew.

One crew member on the Cairnryan to Larne ferry received a positive result from a lateral flow test, causing the company to take action on Wednesday.

It cancelled a number of sailings on Wednesday night and Thursday morning while the whole crew were tested.

No further cases were identified and sailings resumed with knock-on delays.

More from BBC News.

Published in Stena Line
Stena Line are to introduce two chartered sisterships in the Autumn to coincide with the opening of a £80m ferryport near Cairnryan, which is to replace Stranraer, as the new Scottish port for their route to Belfast, writes Jehan Ashmore.
At 30,285grt the sisterships Superfast VII and Superfast VIII will be the largest ferries to operate on the North Channel routes. The 203m long pair can take 1,200 passengers, around 660 cars or 110 freight vehicles.

Stena will lease the ferries for a three year period from Tallink, the Baltic Sea based shipping group. (Click here for photo of Superfast VIII in ice-flow waters). The charter arrangement includes an option to extend for a further year.

The distance between the new ferry terminal named the 'Loch Ryan Port' at Old House Point (which is just north of Cairnryan) is approx. 8kms apart from Stranraer taking the coastal (A77) road along the Loch that leads onto to Glasgow. At Cairnryan,  rivals P&O (Irish Sea) who along with predecessing operators have run services on the route to Larne for several decades.

With a speed of 27-knots, passage times on the new Stena Belfast-Cairnryan route will take 2 hours 15 minutes, this compares to the existing time of 2 hours 50 minutes from Stranraer by conventional ferry and 2 hours taken by the HSS fast-ferry.

As a consequence of Stena operating from Loch Ryan Port, passage times by the Superfast sisters will be reduced by 35 minutes as the Belfast terminal was also relocated in recent years. Though despite the relocated ferry terminals, the Superfast sisters scheduled 2 hours 15 minutes sailings from the new port will be slightly longer compared to the HSS Stena Voyager's 2 hour sailing time from Stranraer.

Also serving the Belfast Stranraer route are the conventional ferries, Stena Caledonia (formerly Sealink's St. David built at Harland & Wolff) and Stena Navigator, that served SeaFrance on Dover-Calais sailings as SeaFrance Manet. When the Superfast sisters replace the HSS Stena Explorer and the conventional ferries, perhaps there will be a new a role for the two vessels in replacing expensive to run fast-craft operated elsewhere.

In the meantime the Superfast pair will maintain running on Tallink's 26-hour Helsinki-Rostock until mid-August. The 2001 German will then undergo an extensive refit of passenger facilities and a new freight-only deck will be incorporated to cater for haulage operators increasing use of higher vehicles and double-deck freight units.

The 'Superfast' vessel naming theme derives from the original owners, Greek operator Superfast Ferries, which sold their Scandinavian operations to Tallink in 2006.

Published in Ferry

National Watersports Campus, Dun Laoghaire

Dun Laoghaire Harbour Stakeholders combined forces in 2019 to promote a project to improve the Harbour’s infrastructure resulting in improved access, job creation and greater tourism potential. 

A grant application to government made by Dun Laoghaire Rathdown County Council (DLRCoCo) assisted by stakeholders was successful with the announcement of a €400k feasibility study grant from the Large Scale Sport Infrastructure Fund (LSSIF) in January 2020.

It meant plans for the €8m National Watersports Campus at Dun Laoghaire Harbour got the green light from Government and came a step closer to reality.

The project recognises deficits in the current set up in the harbour, proposing the construction of an all-tide publicly-accessible slipway (none currently in the Greater Dublin Area) as well as a marine services facility, providing a much-needed home for the supporting industry. 

The campus also seeks to provide a marketing framework to make boating more accessible to the general public.

The benefits of such an increase might be obvious for the Dun Laoghaire waterfront but there are other spin-offs for the harbour town in the creation of the sort of jobs that cannot be shipped abroad.

Centre for Community Watersports activity and public slipway

  • High-Performance coaching centre
  • Flexible Event Space for hosting national and international events
  • Multipurpose Building
  • Campus Marketing and Promotional Centre
  • Accommodation for Irish Sailing and Irish Underwater Council
  • Shared NGB Facility
  • Education Centre for schools, community groups and clubs
  • Proposed site – Carlisle Pier

Watersports Campus FAQs

Similar to the National Sports Campus in Abbotstown, the watersports campus will provide quality, public, recreational and high-performance facilities for the many watersports participants. The Campus will considerably enhance the services currently provided by more than 30 clubs and activity centres to over 50,000 annual users of the harbour.

The passing of control of the harbour to DLRCC, the public appetite for a community benefitting project and the capital funding for sports infrastructure in the Project 2040 National Plan have aligned to create an opportunity to deliver this proposal.

Dun Laoghaire Rathdown County Council (DLRCC) and the Irish Sailing Association (Irish Sailing) are the project leads, endorsed by the National Governing Bodies of other Irish watersports and clubs and activity providers.

The National Sports Policy, published in 2018, established the Large Scale Sport Infrastructure Fund (LSSIF) to provide Exchequer support for sports facility projects. In some cases, these may be projects where the primary objective will be to increase active participation in sport. In other cases, these may be venues where the focus is more related to high-performance sport.

Government has allocated at least €100m over the term to 2027 to successful applicant projects.

The Watersports Campus was one of seven successful applicants for Stream 1 funding allowing planning to commence on the project design and feasibility. €442,000 has been granted in this phase.

NThe project will provide for a municipally-owned public access facility to include a small craft slipway that is accessible at all stages of the tide (currently none in public ownership in the greater Dublin area), storage and lock-up resources, watersports event management space, a high-performance centre and NGB accommodation.

The project aims to enhance the profile of Dun Laoghaire as a major international venue for maritime events, shows and conferences. Establish Dun Laoghaire as the 'go-to place' for anything marine – generating revenues Create employment in the county - attract businesses, visitors and events. Grow the market for watersports Promote the services of activity providers to the public. Complement the plan to develop Dun Laoghaire as a 'destination.'

As of January 1 2021, The Department of Transport, Tourism and Sport has approved the applicant project and DLRCC are expected to appoint a team to further advance the project.

©Afloat 2020