Menu
Allianz and Afloat - Supporting Irish Boating

Ireland's sailing, boating & maritime magazine

In association with ISA Logo Irish Sailing

Displaying items by tag: Cranes

#CorkHarbour - The first of three Liebherr cranes has been loaded onto the Albatross heavy lift vessel at the Port of Cork.

As previously reported on Afloat.ie, the three 85-metre-tall cranes — each weighing more than 1,000 tonnes — are bound for Puerto Rico after being assembled from kit form at Cobh by employees from the Liebherr plan in Kerry.

Liebherr Marine has posted photos captured by drone as the first crane was loaded onto the specially adapted Albatross in Cork Harbour yesterday (Wednesday 22 February):

Published in Cork Harbour

Three cranes, each weighing more than 1,000 tonnes and 85 metres high will be loaded on to a massive ship next week in Cork Harbour bound for Puerto Rico. It will be an amazing feat of engineering and an equally spectacular sight at the Port of Cork to see the massive cargo depart Roches Point.

The cranes have been asembled from kit form having first been shipped by sea from Fenit in County Kerry to the Doyle Shipping Group Terminal at Rushbrooke in Cork Harbour.

60 employees from the Liebherr crane plant in Kerry have been constructing the massive cranes prior to their transatlantic voyage.

The specially adapted ship, The Albatross from Holland, arrived yesterday into the Port of Cork awaiting its giant cargo alongside at Cork Dockyard, as the photo below shows. Known as a 'heavy lift' vessel, the Albatross is 264.45 metres long and 42.54 metres wide, the ship has a maximum speed of 9.5 knots.

HEAVY LIFT ALBATROSS AT CORK DOCKYARDThe heavy-lift ship, Albatross, is making maritime history in Cork Harbour this weekend having arrived at Cork Dockyard to transport three huge, fully-completed dock cranes to Puerto Rico Photo: Tom MacSweeney

Tom MacSweeney in Cork Harbour adds:  It is the first time that the Liebherr crane manufacturing company based at Killarney has exported fully-assembled cranes from Ireland for which they used the Cork Dockyard facility at Rushbrooke near Cobh to assemble them over the past few months.

The ship can automatically lie level alongside the dockyard quayside at all stages of the tide during the loading operation which is expected to take 4 to 5 days. Tracks will be laid to move the cranes onto the vessel.The Albatross will then move across Monkstown Bay to Ringaskiddy deepwater port where the cranes will be bolted to the ship and she will ballast for the voyage to Puerto Rico.

Published in Cork Harbour

Featured Sailing School

INSS sidebutton

Featured Clubs

dbsc mainbutton
Howth Yacht Club
Kinsale Yacht Club
National Yacht Club
Royal Cork Yacht Club
Royal Irish Yacht club
Royal Saint George Yacht Club

Featured Brokers

leinster sidebutton

Featured Webcams

Featured Car Brands

subaru sidebutton

Featured Associations

ISA sidebutton dob
ICRA
isora sidebutton

Featured Events 2021

vdlr21 sidebutton

Featured Sailmakers

northsails sidebutton
uksails sidebutton
quantum sidebutton
watson sidebutton

Featured Chandleries

CHMarine Afloat logo
osm sidebutton
https://afloat.ie/resources/marine-industry-news/viking-marine

Featured Marinas

dlmarina sidebutton

Featured Blogs

W M Nixon - Sailing on Saturday
podcast sidebutton
mansfield sidebutton
BSB sidebutton
wavelengths sidebutton
 

Please show your support for Afloat by donating