Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Killaloe

Waterways Ireland advises masters of vessels on the Shannon Navigation that in-river works for the construction of the Killaloe Bypass upper bridge superstructure are progressing as planned and will continue until October 2024.

As previously reported on Afloat.ie, the bridge is being constructed around 1km downstream of the current Killaloe–Ballina bridge.

A buoyed navigational channel continues to be provided for 100 metres either side of the in-river works.

The following plant and equipment will be operating on or overhead the navigation during the upper bridge works:

  • 600t crawler crane set up on the east shore
  • Stabilising crane barge (30m x 23m x 1.88m)
  • 100t crawler crane
  • Tugboat/pusher boat
  • Dumb barge (23m x 9m) and mobile elevated work platforms
  • Safety boat
  • Landing pontoon and gangways

From next Tuesday 2 to Friday 19 April, the final steel girders will be lifted into position in the central spans of the bridge.

This is a heavy lift operation and deemed high-risk work, requiring calm waters for operation of mobile elevated work platforms (MEWP) on barges.

Masters of vessels are requested to proceed at slow speed (5 knots, no wash) with additional caution in the vicinity of the works, and to follow the instructions of the safety boat crew as there are hazards such as bridge piers, steel piles and mooring lines to navigate.

The cross-border body for Ireland’s inland waterways thanks its customers for their cooperation in relation to these works.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on and users of the Shannon Navigation that Uisce Éireann will be installing an outfall downstream of Killaloe and Ballina from next Monday 21 August to the end of September.

A work barge will be launched from the carpark adjacent to the Waterways Ireland building in Killaloe and will operate south of the bridge adjacent to the Ballina wastewater treatment plant for the duration of the works.

The outfall will extend from the Ballina plant into the river for a distance of 90 metres.

Two temporary special markers will be installed to mark the limits of the in-river works area downstream of Killaloe and Ballina. A permanent navigation marker will be installed when the works are completed.

Masters of vessels should proceed with additional caution in the vicinity of the works, adds the cross-border body for Ireland’s inland waterways.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Shannon Navigation that the in-river works for the construction of the Killaloe Bypass bridge continue to progress as planned.

As previously reported on Afloat.ie, the bridge is being constructed around 1km downstream of the current Killaloe–Ballina bridge.

Three bridge piers will be constructed in the navigation by December. The first 10 piles were installed on the east side of the river by early June with 10 more on the west side by late June.

Barges and piling moved from the west side to the centre of the river in early July and will be relocated to the west side of the navigation from Monday 7 August.

The crane barge will move to the east jetty and load out precast shells on Tuesday 8 August. It is intended to lift precast concrete shells into position on Wednesday 9, Thursday 10 and Friday 11 August. This is a heavy-lift operation and deemed high-risk work, requiring calm waters.

A buoyed navigation channel is being provided for 100 metres either side of the in river works, the cross-border body for Ireland’s inland waterways adds.

Masters of vessels are requested to proceed at slow speed (5 knots, no wash) with additional caution in the vicinity of the works and to follow the instructions of the safety boat crew as there are hazards such as steel piles and mooring lines to navigate.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Shannon Navigation that the in-river works for the construction of the Killaloe Bypass bridge are progressing as planned.

As previously reported on Afloat.ie, the bridge is being constructed around 1km downstream of the current Killaloe–Ballina bridge.

Three bridge piers will be constructed in the navigation by December. The first 10 piles were installed on the east side of the river by early June with 10 more on the west side by last week, the cross-border body for Ireland’s inland waterways confirms.

A buoyed navigation channel is being provided for 100 metres either side of the in river works. The barges and piling rig have now moved from the west side to the centre of the river as of Tuesday 1 July.

Masters of vessels are requested to proceed at slow speed (5 knots, no wash) with additional caution in the vicinity of the works and to follow the instructions of the safety boat crew as there are hazards such as mooring lines to navigate.

Published in Inland Waterways

Tributes have been paid to 19-year-old Wassiou Ayawe, who died after an incident involving a jet ski in Killaloe on Wednesday afternoon (31 May).

As RTÉ News reports, the talented footballer died after he and two teenage girls were thrown into the waters of Lough Derg after the personal watercraft they were riding flipped over near Killaloe Bridge.

It’s understood that the two girls, who were wearing lifejackets, were able to swim to safety.

Colin Becker, former president of the Inland Waterways Association of Ireland said: “Our sympathies go to the victim's family and friends.”

Published in Jetski
Tagged under

Waterways Ireland advises masters of vessels on the Shannon Navigation that the in-river works for the construction of the Killaloe Bypass bridge are progressing as planned.

As previously reported on Afloat.ie, the bridge is being constructed around 1km downstream of the current Killaloe–Ballina bridge.

Three bridge piers will be constructed in the navigation by December. The first 10 piles have now been installed on the east side of the river, the cross-border body for Ireland’s inland waterways confirms.

A buoyed navigation channel is being provided for 100 metres either side of the in river works. The barges and piling rig will be operating on the west side of the river from Thursday 1 June.

Masters of vessels are requested to proceed at slow speed (5 knots, no wash) with additional caution in the vicinity of the works and to follow the instructions of the safety boat crew as there are hazards such as mooring lines to navigate.

Published in Inland Waterways

Waterways Ireland advises masters of vessels on the Shannon Navigation that in-river works for the construction of the Killaloe Bypass bridge commence Monday 17 April and are expected to continue for several months until December.

The bridge is being constructed around 1km downstream of the existing Killaloe–Ballina bridge.

Plant and other equipment that will be operating on the navigation during these in-river works include the following:

  • Jack-up piling barge, 22m x 17m x 2.44m
  • Stabilising crane barge, 30m x 23m x 1.88m
  • Piling rig, 85t
  • Crawler crane, 130t
  • Tugboat/pusher boat Tiger 2
  • Dumb barge, 23m x 9m
  • Landing craft
  • Safety boat
  • Landing pontoon and gangways

Piling will commence on Tuesday 2 May with three bridge piers being constructed in the navigation by December, the cross-border body for Ireland’s inland waterways says.

A buoyed navigation channel has been provided for 100 metres either side of the in river works since Friday 14 April. The navigation channel will be to the west side of the barges/pontoons from Monday 17 April to Wednesday 31 May.

Masters of vessels are requested to proceed at slow speed, with additional caution in the vicinity of the works, and to follow the instructions of the safety boat crew.

Published in Inland Waterways

Waterways Ireland advises masters of vessels and waterways users on the Shannon Navigation that a series of events will take place in Killaloe next weekend (16-18 September) as part of the end-of-season LUA celebration of ‘wild water’ in the Co Clare village.

Friday 16 September will see the Lough Derg branch of the Inland Waterways Association of Ireland (IWAI) hold its end-of-season celebration with commodores John and Sandra Lefroy and Matt Daniels with guest of honour Mayor of Clare, Tony O’Brien. 
                                         
In addition, Norma Manly and band will be in concert at St Flannan’s Cathedral from 8pm.

On Saturday 17 September, there will be a presentation by Gary McMahon, director of the AKA Ilen project on sailing in Irish and international waters for over a century. This takes place at noon in St Flannan’s Cathedral.

It will be followed by a presentation by Martin Cooper on the cathedral’s distinctive bells at 3pm, honouring Bryan and Betty Brislane.

And at 8pm there will be a special concert — Killaloe: a musical celebration — featuring Mary Donahue, Paul Fitzpatrick and friends. Proceeds will go to the Lough Derg Coast Guard and Killaloe Fire and Rescue Services.

On Sunday 18 September, Caroline Rainsford will host a special hour-long session of tai chi by the waterside from 9am, free and suitable for all abilities.

At 11.30am, there will be an ecumenical service at St Flannan’s that will include a blessing of the waterways and environs, followed by a presentation to Sandra and John Lefroy of the famed steamboat Phoenix as well as a closing celebration hosted by the IWAI’s Lough Derg branch.

Throughout the weekend, St Flannan’s will also host a special art exhibition from local artist Trish Taylor Thompson on the theme of the waterways.

Meanwhile, Waterways Ireland advises masters of vessels that construction works have commenced on a new bridge across the Shannon Navigation around 1km downstream of the existing bridge in Killaloe.

A silt curtain has been installed in the navigation and construction works will be extending into the navigation over the next 12 months. Masters of vessels should proceed with additional caution in the vicinity of the construction works.

Published in Inland Waterways

The inland waterways will be celebrated at Killaloe next month, the quintessential waterways town on the River Shannon in Co.Clare.

Called ‘LUA’, it will be “a celebration of wild water at the ancient settlement of Killaloe, which is a gift of the Shannon, ” says Rev.Paul Fitzpatrick, Dean’s Vicar at St.Flannan’s Cathedral in Killaloe, who has designed the event “to explore our evolving engagement with wild water and how best to individually and collectively irrigate a more beneficial relationship with it, both culturally and environmentally.”

Rev Paul Fitzpatrick and members of his Killaloe congregationRev Paul Fitzpatrick and members of his Killaloe congregation

It will take place from Friday, September 16, through Saturday and Sunday, September 17 and 18, with an exhibition on the theme of waterways and the environment and a presentation by the Director of the AK ILEN project, Gary McMahon, about the restoration of Ireland’s last sailing schooner.

"Called ‘LUA’, it will be “a celebration of wild water at the ancient settlement of Killaloe"

Killaloe is “incredible with maritime history, rooted in the ancient and contemporary, revolving around the life and times of what is the treasure of the maritime and the inland waterways,” says Rev. Fitzpatrick, an enthusiastic boater on the Shannon himself.

Listen to him on the Podcast here

Published in Tom MacSweeney

BreakingNews.ie reports that a charity rower was left “shaken” after he was rescued from strong currents in the River Shannon at the Killaloe bridge.

Killaloe Coast Guard Unit were tasked at 2.40pm yesterday (Wednesday 25 September) to the scene where the rower had managed to secure his vessel to the navigation markers leading to the bridge.

The rescue team were with the rower within minutes and transferred him to safety while his vessel was taken under tow to the public slipway at Ballina.

BreakingNews.ie says the incident follows a “lucky escape” for three men last month whose lake boat collided with the same bridge.

Published in Rescue
Tagged under
Page 1 of 3

Port of Cork Information

The Port of Cork is the key seaport in the south of Ireland and is one of only two Irish ports which service the requirements of all six shipping modes i.e., Lift-on Lift-off, Roll-on Roll-off, Liquid Bulk, Dry Bulk, Break Bulk and Cruise. Due to its favourable location on the south coast of Ireland and its modern deep-water facilities, the Port of Cork is ideally positioned for additional European trading as well as for yet unexploited direct deep-sea shipping services.

The Port of Cork is investing €80 million in a container terminal development in Ringaskiddy. The Cork Container Terminal will initially offer a 360-metre quay with 13-metre depth alongside and will enable larger ships to berth in the port. The development also includes the construction of a 13.5-hectare terminal and associated buildings as well as two ship to shore gantry cranes and container handling equipment.

The development of new container handling facilities at Ringaskiddy was identified in the Port of Cork’s Strategic Development Plan in 2010. It will accommodate current and future container shipping which can be serviced by modern and efficient cargo handling equipment with innovative terminal operating and vehicle booking systems. The Port of Cork anticipates that Cork Container Terminal will be operational in 2020.

The Port of Cork is the key seaport in the south of Ireland and is one of just two Irish ports which service the requirements of all shipping modes.

The Port of Cork also controls Bantry Bay Port Company and employs 150 people across all locations.

A European Designated Core Port and a Tier 1 Port of National Significance, Port of Cork’s reputation for quality service, including prompt and efficient vessel turnaround as well as the company’s investment in future growth, ensures its position as a vital link in the global supply chain.

The port has made impressive strides in recent decades, most recently with the construction of the new €80m Cork Container Terminal in Ringaskiddy which will facilitate the natural progression of the move from a river port to a deepwater port in order to future proof the Port
of Cork. This state-of-the-art terminal which will open in 2020 will be capable of berthing the largest container ships currently calling to Ireland.

The Port of Cork Company is a commercial semi-state company responsible for the commercial running of the harbour as well as responsibility for navigation and berthage in the port.  The Port is the main port serving the South of Ireland, County Cork and Cork City. 

Types of Shipping Using Port of Cork

The Port offers all six shipping modes from Lift-on Lift-off, Roll-on Roll-off, Liquid Bulk, Dry Bulk, Break Bulk and Cruise liner traffic.

Port of Cork Growth

The port has made impressive strides in recent decades. Since 2000, the Port of Cork has invested €72 million in improving Port infrastructure and facilities. Due to its favourable location and its modern deepwater facilities, the Port is ideally positioned for additional European trading as well as for yet unexploited direct deep-sea shipping services. A well-developed road infrastructure eases the flow of traffic from and to the port. The Port of Cork’s growing reputation for quality service, including prompt and efficient vessel turnaround, ensures its position as a vital link in the global supply chain. The Port of Cork Company turnover in 2018 amounted to €35.4 million, an increase of €3.9 million from €31.5 million in 2017. The combined traffic of both the Ports of Cork and Bantry increased to 10.66 million tonnes in 2018 up from 10.3 million tonnes in 2017.

History of Port of Cork

Famous at the last port of call of the Titanic, these medieval navigation and port facilities of the city and harbour were historically managed by the Cork Harbour Commissioners. Founded in 1814, the Cork Harbour Commissioners moved to the Custom House in 1904.  Following the implementation of the 1996 Harbours Act, by March 1997 all assets of the Commissioners were transferred to the Port of Cork Company.

Commercial Traffic at Port of Cork

Vessels up to 90,000 tonnes deadweight (DWT) are capable of coming through entrance to Cork Harbour. As the shipping channels get shallower the farther inland one travels, access becomes constricted, and only vessels up to 60,000 DWT can sail above Cobh. The Port of Cork provides pilotage and towage facilities for vessels entering Cork Harbour. All vessels accessing the quays in Cork City must be piloted and all vessels exceeding 130 metres in length must be piloted once they pass within 2.5 nautical miles (4.6 km) of the harbour entrance.

Berthing Facilities in Cork Harbour

The Port of Cork has berthing facilities at Cork City, Tivoli, Cobh and Ringaskiddy. The facilities in Cork City are primarily used for grain and oil transport. Tivoli provides container handling, facilities for oil, livestock and ore and a roll on-roll off (Ro-Ro) ramp. Prior to the opening of Ringaskiddy Ferry Port, car ferries sailed from here; now, the Ro-Ro ramp is used by companies importing cars into Ireland. In addition to the ferry terminal, Ringaskiddy has a deep water port.

Port of Cork Development Plans

2020 will be a significant year for the Port of Cork as it prepares to complete and open the €86 million Cork Container Terminal development in Ringaskiddy.

Once operational the new terminal will enable the port to handle up to 450,000 TEU per annum. Port of Cork already possess significant natural depth in Cork harbour, and the work in Ringaskiddy Port will enable the Port of Cork to accommodate vessels of 5500 to 6000 TEU, which will provide a great deal of additional potential for increasing container traffic.

It follows a previous plan hatched in 2006 as the port operated at full capacity the Port drew up plans for a new container facility at Ringaskiddy. This was the subject of major objections and after an Oral Planning Hearing was held in 2008 the Irish planning board Bord Pleanala rejected the plan due to inadequate rail and road links at the location.  

Further notable sustainability projects also include:

  • The Port of Cork have invested in 2 x STS cranes – Type single lift, Model P (148) L, (WS) Super. These cranes contain the most modern and energy-efficient control and monitoring systems currently available on the market and include an LED floodlight system equipped with software to facilitate remote diagnostics, a Crane Management System (CMS) and an energy chain supply on both cranes replacing the previous preferred festoon cabling installation.
  • The Port of Cork has installed High Mast Lighting Voltage Control Units at its two main cargo handling locations – Tivoli Industrial & Dock Estate and Ringaskiddy Deep-water & Ferry Terminals. This investment has led to more efficient energy use and reduced risk of light pollution. The lights can also be controlled remotely.
  • The Port of Cork’s largest electrical consumer at Tivoli Container Terminal is the handling and storage of refrigerated containers. Local data loggers were used to assess energy consumption. This provided timely intervention regarding Power Factor Correction Bank efficiency on our STS (Ship to Shore) Cranes and Substations, allowing for reduced mains demand and reducing wattless energy losses along with excess charges. The information gathered has helped us to design and build a reefer storage facility with energy management and remote monitoring included.

Bantry Port

In 2017 Bantry Bay Port Company completed a significant investment of €8.5 million in the Bantry Inner Harbour development. The development consisted of a leisure marina, widening of the town pier, dredging of the inner harbour and creation of a foreshore amenity space.

Port of Cork Cruise Liner Traffic

2019 was a record cruise season for the Port of Cork with 100 cruise liners visiting. In total over 243,000 passengers and crew visited the region with many passengers visiting Cork for the first time.

Also in 2019, the Port of Cork's Cruise line berth in Cobh was recognised as one of the best cruise destinations in the world, winning in the Top-Rated British Isles & Western Europe Cruise Destination category. 

There has been an increase in cruise ship visits to Cork Harbour in the early 21st century, with 53 such ships visiting the port in 2011, increasing to approximately 100 cruise ship visits by 2019.

These cruise ships berth at the Port of Cork's deepwater quay in Cobh, which is Ireland's only dedicated berth for cruise ships.

Passenger Ferries

Operating since the late 1970s, Brittany Ferries runs a ferry service to Roscoff in France. This operates between April and November from the Ro-Ro facilities at Ringaskiddy. Previous ferry services ran to Swansea in Wales and Santander in Spain. The former, the Swansea Cork ferry, ran initially between 1987 and 2006 and also briefly between 2010 and 2012.

The latter, a Brittany Ferries Cork–Santander service, started in 2018 but was cancelled in early 2020.

Marine Leisure

The Port of Cork has a strategy that aims to promote the harbour also as a leisure amenity. Cork’s superb natural harbour is a great place to enjoy all types of marine leisure pursuits. With lots of sailing and rowing clubs dotted throughout the harbour, excellent fishing and picturesque harbour-side paths for walking, running or cycling, there is something for everyone to enjoy in and around Cork harbour. The Port is actively involved with the promotion of Cork Harbour's annual Festival. The oldest sailing club in the world, founded in 1720, is the Royal Cork Yacht Club is located at Crosshaven in the harbour, proof positive, says the Port, that the people of Cork, and its visitors, have been enjoying this vast natural leisure resource for centuries. 

Port of Cork Executives

  • Chairman: John Mullins
  • Chief Executive: Brendan Keating
  • Secretary/Chief Finance Officer: Donal Crowley
  • Harbour Master and Chief Operations Officer: Capt. Paul O'Regan
  • Port Engineering Manager: Henry Kingston
  • Chief Commercial Officer: Conor Mowlds
  • Head of Human Resources: Peter O'Shaughnessy