Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: EastWest interconnector

#MARINE WARNING - The latest Marine Notice from the Department of Transport, Tourism and Sport (DTTAS) advises on cable laying operations in the Irish Sea commencing today 22 April.

Following preliminary work on the East-West Interconnector power cable earlier this month, as previously reported on Afloat.ie, cable laying works will be undertaken by AMC Connector (call sign LAKY7) for a duration of approximately 18 days, subject to weather delays.

Operations will involve deployment of cable and ROVs which will restrict the vessel’s ability to manoeuvre.

The vessel will operate on a 24-hour basis, displaying appropriate day shapes and lights during operations, and will transmit an AIS signal. The vessel will be keeping a listening watch on VHF Channel 16 at all times during the operations.

All vessels, particularly those engaged in fishing, are requested to give the AMC Connector a wide berth.

Complete details including co-ordinates of the work area are included in Marine Notice No 20 of 2012, a PDF of which is available to read and download HERE.

Published in Marine Warning

#MARINE WARNING - The latest Marine Notice from the Department of Transport, Tourism and Sport (DTTAS) advises on preliminary work on the East-West interconnector power cable in the Irish Sea between Ireland and Wales over the next few weeks.

Briggs Marine commenced pre-lay grapnel runs along the line of the cable route on Sunday 1 April, and this work will be carried out over three weeks from the vessel Kingdom of Fife (call sign 2BKR2).

This work will continue on a 24-hour basis, and the vessel will display appropriate day shapes and lights as required, with a continuous watch on VHF Channel 16 and DSC.

Complete details including co-ordinates of the work area are included in Marine Notice No 14 of 2012, a PDF of which is available to read and download HERE.

Published in Marine Warning