Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Marine Notice

The European Communities (Safe Loading and Unloading of Bulk Carriers) (Amendment) Regulations 2024 (SI No 110 of 2024) entered into force on 27 March 2024.

Changes to the regulations for the safe loading and unloading of bulk carriers now apply to all shipping terminals visited by bulk carriers for the loading or unloading of solid bulk cargoes, except those which are only visited by bulk carriers in exceptional circumstances.

The update also clarifies the requirements for regular verifications and unannounced inspections to be carried out by the Maribe Survey Office (MSO), and sets out the revised penalties for infringements.

For further details on the new regulations, see Marine Notice No 22 of 2024 attached below.

Published in Ports & Shipping

The Department of Transport has been notified by JD-Contractor that they will be performing out-of-service cutting and route clearance works on behalf of Nexans for CIDAC as part of the Celtic Interconnector Project.

The works will be located at various points along the planned subsea electricity cable route between the southeast coast of Ireland and the northern coast of France.

Works will begin on Wednesday 24 April and will continue for approximately 10 days, subject to weather and operational constraints.

The out-of-service (OOS) cable-cutting operations will be conducted within the cable corridor extending plus or minus 50 metres each side of planned cable centreline. The relevant waypoints can be found in Marine Notice No 20 of 2024, attached below.

The works will be conducted by the vessel MV Detector (callsign OUIV2) which will display the relevant lights and shapes during periods of restricted manoeuvrability and adhere to the International Regulations for the Prevention of Collisions at Sea (COLREGS) and all licensing requirements.

During OOS cutting operations, the vessel will keep a listening watch on VHF Channel 16 and will actively transmit an AIS signal. A listening watch will also be maintained on VTS VHF channels as appropriate. The vessel will broadcast daily, and at shorter intervals as may be required by passing traffic, the vessel position, operational information and planned operations for the next 24 hours.

Maps and coordinates as well as contact details are included in the Marine Notice below.

Published in Power From the Sea

The Department of Transport has been advised by Dublin Array that they will be conducting geophysical, geotechnical and environmental surveys for the Dublin Array offshore wind farm project.

Site investigation operations for the wind farm and the Expert Corridor Route (ECR) between the coast of Dublin and Wicklow will take place between Friday 19 April and the end of July, subject to weather and operational constraints.

The geophysical survey will be carried out by the vessel Fugro Helmert (callsign C6FT8). During these operations, the vessel will be towing equipment at a depth of up to five metres below the surface and extending some 300 metres astern.

The geotechnical survey will be carried out by the vessel M/V Flat Holm (callsign GHLZ) at fixed stations. The environmental survey will be carried out by the vessel Ros Áine (callsign EIZG5) in daytime hours only.

All vessels will be mobilised from Dun Laoghaire and will be restricted in their ability to manoeuvre, therefore all other mariners are advised to provide a wide berth and navigate with caution in the relevant area.

Coordinates and a map of the survey area, as well as contact details, can be found in Marine Notice No 18 of 2024, attached below.

Published in Power From the Sea

Fuinneamh Sceirde Teoranta (FST) will be undertaking both a geotechnical survey and geophysical survey for the Sceirde Rocks Windfarm Project in the Western Coastal Area (Connemara/Outer Galway Bay) and Atlantic Ocean, between Monday 15 April and Monday 10 June, subject to weather and operational constraints.

These surveys follow last September’s geophysical survey and will be undertaken by the multi-purpose offshore vessel Dina Polaris (callsign CQOF), which is fitted with a geotechnical drilling rig, and the research vessel Lady Kathleen (callsign EIXT2). Both vessels will operate up to 24 hours per day and will be displaying the appropriate lights and shapes.

During operations, the vessels will be restricted in their ability to manoeuvre. Therefore, passing vessels are requested to leave a wide berth during the deployment operations. Radio transmissions will be conducted with other seafarers to notify them of the operations. The vessels will be monitoring VHF Channel 16 at all times for safety purposes.

The equipment for each survey will be deployed within the bounds of the survey areas detailed in Marine Notice No 17 of 2024, attached below.

Published in Power From the Sea

Following cable lay operations set to conclude this weekend, Greenlink Interconnector Ltd will perform cable burial and trenching activities along the planned interconnector route.

These activities will be undertaken between Saturday 13 April and Thursday 20 June, subject to weather and operational constraints.

Operations will take place along the planned interconnector route between the landfall location near Baginbun Beach in Co Wexford and the middle of the Irish Sea. Coordinates and maps can be found in Marine Notice No 21 of 2024, attached below.

The works will be performed by the trenching support vessel Symphony (callsign LXTT). This vessel will have a trenching vehicle deployed or a remotely operated vehicle for survey activities deployed over the side.

As the work vessel will be restricted in its ability to manoeuvre, all other vessels operating within this area are requested to keep a wide berth and pass at minimum speed to reduce vessel wash. The work vessel will be listening to VHF Channel 16 and can set any other channel as required.

For further details, including contact information, see the Marine Notice below.

Published in News Update

Following the first and second legs in February and March, the third leg of this year’s Irish Anglerfish and Megrim Survey (IAMS 2024) is being carried out from Friday 12 to Sunday 21 April.

Surveys will be conducted to the North and North-West Coasts of Ireland by the Marine Institute in fulfilment of Ireland’s obligations under the Common Fisheries Policy (CFP).

Leg 3 is a demersal trawl survey consisting of approximately 50 otter trawls, each of 60 minutes duration, in ICES area 6a. Fishing in 2024 will take place within a three-nautical-mile radius of the positions indicated in Appendices 1 and 2 of Marine Notice No 12 of 2024, a PDF of which is attached below.

The survey will be conducted by the RV Celtic Explorer (callsign EIGB) which will display appropriate lights and signals. The vessel will be towing a Jackson demersal trawl during fishing operations.

The Marine Institute requests that commercial fishing and other marine operators keep a 3nm radius area around the tow points clear of any gear or apparatus during the survey period.

Further details are included in the Marine Notice below.

Published in Fishing

The Department of Transport has been advised that Next Geosolutions will perform shallow geotechnical surveys, pUXO ID surveys and KP5 Omega Loop surveys as part of the Celtic Interconnector Project cable route between the South-East Coast of Ireland and the coast of France.

The survey is expected to be completed over a 10-day period from this Wednesday 10 April, subject to weather and operational constraints.

Survey operations will be conducted within the cable corridor extending around 50m each side of the planned cable centreline.

The survey vessel NG Worker (callsign ICID) will carry out the survey works. Mariners are advised to provide a wide berth and navigate with caution in the area.

During survey operations, the vessel will keep a listening watch on VHF Channel 16 and will actively transmit an Automatic Identification System (AIS) signal. A listening watch will also be maintained on VTS VHF channels as appropriate.

The survey vessel shall broadcast daily, and at shorter intervals as may be required by passing traffic, the vessel position, operational information and planned operations for the next 24 hours. It is requested that fixed fishing gear within 1,000m of the route centreline be removed.

Coordinates and a map of the survey area as well as contact details can be found in Marine Notice No 13 of 2024 attached below.

Published in Power From the Sea

Following the recent pre-lay grapnel run, Greenlink Interconnector Ltd will be conducting offshore and nearshore operations for its electricity interconnector from Friday 22 March to Sunday 14 April, subject to weather and operational constraints.

Beach-pull operations in the nearshore are to be undertaken within around one nautical mile of Baginbun Beach. The cable lay operations following the beach pull operations, involving divers, will take place along the planned interconnector route from the landfall location at Baginbun Beach towards the middle of the interconnector route.

The operations will be conducted by three survey vessels: the multicat Forth Warrior (callsign 2JHR8), Connector (DP3) (callsign LXEV) and CRC Voyager (callsign MBZZ7).

These vessels carrying out the works will be restricted in their ability to manoeuvre, therefore all other passing vessels are requested to keep a wide berth and pass at minimum speed to reduce vessel wash. The vessels will display the appropriate lights and shapes if applicable (two black spheres and in the middle a black diamond shape, in a vertical line) and will monitor VHF Channel 16 at all times.

Coordinates and a map of the work area as well as contact details can be found in Marine Notice No 16 of 2024 attached below.

Published in News Update

As previously reported on Afloat.ie, Greenlink Interconnector Ltd is proposing to develop an electricity interconnector to allow for offshore cable installation and burial at a later stage.

A pre-lay grapnel run (PLGR) will be performed along the planned interconnector route to ensure clearance of debris from this Friday 15 March to next Tuesday 19 March, subject to weather and operational constraints.

During the PLGR, a grapnel shall be deployed on the planned cable route and dragged over the seabed. Whenever an increase in tension is recorded or in any case at five-kilometre intervals, the grapnel will be recovered cleaned and inspected. Afterwards, the grapnel will be redeployed to the seabed. The operation will be repeated until the complete route of about 80km has been finished.

The PLGR operations will take place along the planned interconnector route from the landfall location at Baginbun Beach towards the middle of the interconnector route.

Operations will be performed by the Forth Warrior (callsign 2JHR8). The vessel will have the PLGR grapnel deployed on the bow roller.

As the vessel will be restricted in its ability to maneuver, all other vessels operating within this area are requested to keep a wide berth and pass at minimum speed to reduce vessel wash. The vessel will be listening to VHF Channel 16 and can set any other channel as required.

Coordinates and a map of the work area as well as contact details can be found in Marine Notice No 15 of 2024, available to read or download HERE.

Published in News Update

The Marine Survey Office (MSO) of the Department of Transport has appointed four companies to the panel as Recognised Security Organisations (Ports) for the period covering 1 January 2024 to 31 December 2028.

These companies appointed as RSOs for the creation of port security assessments, port facility security assessments, port security plans and port facility security plans are as follows:

CMG (Crime Management Group),
Regus House,
Harcourt Road,
Dublin,
D02 HW77
Tel: +353 1 417 4242
Email: [email protected]

Crime Management Services,
Block B, The Crescent Building,
Northwood, Santry,
Dublin D09 C6X8
Tel: +353 1 893 4906
Email: [email protected]

Bureau Veritas Marine and Offshore UK and Ireland
1 & 2, Keel House,
South Shields
NE34 9PY, United Kingdom
Tel: +44 (0) 191 427 8170
Email: [email protected]

Seaport Services Crann Centre,
Classis, Ovens,
Co Cork P31 TX39
Tel. +353 86 190 1913/+353 87 237 8103
Email: [email protected]

The appointment will cover work as an RSO in relation to both Regulation (EC) No 725/2004 and Directive 2005/65/EC on Port Security.

Published in Ports & Shipping
Page 1 of 54

Royal St. George Yacht Club

The Royal St George Yacht Club was founded in Dun Laoghaire (then Kingstown) Harbour in 1838 by a small number of like-minded individuals who liked to go rowing and sailing together. The club gradually gathered pace and has become, with the passage of time and the unstinting efforts of its Flag Officers, committees and members, a world-class yacht club.

Today, the ‘George’, as it is known by everyone, maybe one of the world’s oldest sailing clubs, but it has a very contemporary friendly outlook that is in touch with the demands of today and offers world-class facilities for all forms of water sports

Royal St. George Yacht Club FAQs

The Royal St George Yacht Club — often abbreviated as RStGYC and affectionately known as ‘the George’ — is one of the world’s oldest sailing clubs, and one of a number that ring Dublin Bay on the East Coast of Ireland.

The Royal St George Yacht Club is based at the harbour of Dun Laoghaire, a suburban coastal town in south Co Dublin around 11km south-east of Dublin city centre and with a population of some 26,000. The Royal St George is one of the four Dun Laoghaire Waterfront Clubs, along with the National Yacht Club, Royal Irish Yacht Club (RIYC) and Dun Laoghaire Motor Yacht Club (DMYC).

The Royal St George was founded by members of the Pembroke Rowing Club in 1838 and was originally known as Kingstown Boat Club, as Kingstown was what Dun Laoghaire was named at the time. The club obtained royal patronage in 1845 and became known as Royal Kingstown Yacht Club. After 1847 the club took on its current name.

The George is first and foremost an active yacht club with a strong commitment to and involvement with all aspects of the sport of sailing, whether racing your one design on Dublin Bay, to offshore racing in the Mediterranean and Caribbean, to junior sailing, to cruising and all that can loosely be described as “messing about in boats”.

As of November 2020, the Commodore of the Royal St George Yacht Club is Peter Bowring, with Richard O’Connor as Vice-Commodore. The club has two Rear-Commodores, Mark Hennessy for Sailing and Derek Ryan for Social.

As of November 2020, the Royal St George has around 1,900 members.

The Royal St George’s burgee is a red pennant with a white cross which has a crown at its centre. The club’s ensign has a blue field with the Irish tricolour in its top left corner and a crown towards the bottom right corner.

Yes, the club hosts regular weekly racing for dinghies and keelboats as well as a number of national and international sailing events each season. Major annual events include the Volvo Dun Laoghaire Regatta, hosted in conjunction with the three other Dun Laoghaire Waterfront Clubs.

Yes, the Royal St George has a vibrant junior sailing section that organises training and events throughout the year.

Sail training is a core part of what the George does, and training programmes start with the Sea Squirts aged 5 to 8, continuing through its Irish Sailing Youth Training Scheme for ages 8 to 18, with adult sail training a new feature since 2009. The George runs probably the largest and most comprehensive programme each summer with upwards of 500 children participating. This junior focus continues at competitive level, with coaching programmes run for aspiring young racers from Optimist through to Lasers, 420s and Skiffs.

 

The most popular boats raced at the club are one-design keelboats such as the Dragon, Shipman 28, Ruffian, SB20, Squib and J80; dinghy classes including the Laser, RS200 and RS400; junior classes the 420, Optimist and Laser Radial; and heritage wooden boats including the Water Wags, the oldest one-design dinghy class in the world. The club also has a large group of cruising yachts.

The Royal St George is based in a Victorian-style clubhouse that dates from 1843 and adjoins the harbour’s Watering Pier. The clubhouse was conceived as a miniature classical Palladian Villa, a feature which has been faithfully maintained despite a series of extensions, and a 1919 fire that destroyed all but four rooms. Additionally, the club has a substantial forecourt with space for more than 50 boats dry sailing, as well as its entire dinghy fleet. There is also a dry dock, four cranes (limit 12 tonnes) and a dedicated lift=out facility enabling members keep their boats in ready to race condition at all times. The George also has a floating dock for short stays and can supply fuel, power and water to visitors.

Yes, the Royal St George’s clubhouse offers a full bar and catering service for members, visitors and guests. Currently the bar is closed due to Covid-19 restrictions.

The Royal St George boathouse is open daily from 9.30am to 5.30pm during the winter. The office and reception are open Tuesdays to Fridays from 10am to 5pm. The bar is currently closed due to Covid-19 restrictions. Lunch is served on Wednesdays and Fridays from 12.30pm to 2.30pm, with brunch on Saturdays and Sundays from noon to 3pm.

Yes, the Royal St George regularly hosts weddings and family celebrations from birthdays to christenings, and offers a unique and prestigious location to celebrate your day. The club also hosts corporate meetings, sailing workshops and company celebrations with a choice of rooms. From small private meetings to work parties and celebrations hosting up to 150 guests, the club can professionally and successfully manage your corporate requirements. In addition, team building events can utilise its fleet of club boats and highly trained instructors. For enquiries contact Laura Smart at [email protected] or phone 01 280 1811.

The George is delighted to welcome new members. It may look traditional — and is proud of its heritage — but behind the facade is a lively and friendly club, steeped in history but not stuck in it. It is a strongly held belief that new members bring new ideas, new skills and new contacts on both the sailing and social sides.

No — members can avail of the club’s own fleet of watercraft.

There is currently no joining fee for new members of the Royal St George. The introductory ordinary membership subscription fee is €775 annually for the first two years. A full list of membership categories and related annual subscriptions is available.

Membership subscriptions are renewed on an annual basis

Full contact details for the club and its staff can be found at the top of this page

©Afloat 2020

RStGYC SAILING DATES 2024

  • April 13th Lift In
  • May 18th & 19th Cannonball Trophy
  • May 25th & 26th 'George' Invitational Regatta
  • July 6th RSGYC Regatta
  • August 10th & 11th Irish Waszp National Championships
  • August 22- 25th Dragon Irish National Championships / Grand Prix
  • Aug 31st / Sept 1st Elmo Trophy
  • September 6th End of Season Race
  • September 7th & 8th Squib East Coast Championships
  • September 20th - 22nd SB20 National Championships
  • September 22nd Topper Ireland Traveller Event
  • October 12th Lift Out

Featured Sailing School

INSS sidebutton

Featured Clubs

dbsc mainbutton
Howth Yacht Club
Kinsale Yacht Club
National Yacht Club
Royal Cork Yacht Club
Royal Irish Yacht club
Royal Saint George Yacht Club

Featured Brokers

leinster sidebutton

Featured Webcams

Featured Associations

ISA sidebutton
ICRA
isora sidebutton

Featured Marinas

dlmarina sidebutton

Featured Chandleries

CHMarine Afloat logo
https://afloat.ie/resources/marine-industry-news/viking-marine

Featured Sailmakers

northsails sidebutton
uksails sidebutton
watson sidebutton

Featured Blogs

W M Nixon - Sailing on Saturday
podcast sidebutton
BSB sidebutton
wavelengths sidebutton
 

Please show your support for Afloat by donating