Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Grand Canal

Waterways Ireland advises masters and owners of vessels on the Grand Canal that the jetty serving Lock C6 beside the Charlemont Luas over-bridge in Dublin City centre is closed until further notice in order to effect repairs.

Published in Inland Waterways

Waterways Ireland advises all users of the Royal Canal, Grand Canal and Barrow Navigation of a number of events scheduled to take place in the coming days and weeks on these inland waterways.

The Grand Canal will see the Shannon Harbour Canal Boat Rally this weekend from Friday 24 to Sunday 26 June, hosted by the Inland Waterways Association of Ireland (IWAI). Vessels attending are required to apply for a free visitors permit before entering the canal network.

On the Barrow Navigation, ad angling competition will take place in the St Mullins area from Saturday 25 to Monday 27 June. Masters of vessels are requested to proceed at slow speed and note any directions issued in the vicinity.

On the Royal Canal, a canoe polo event will be taking place in the Kilcock Harbour area this Sunday 26 June. Waterways Ireland requests that the polo pitch areas and harbour be kept clear of all vessels at this time to facilitate the events, and that masters of vessels should comply with instructions from marshals. 

And next month, Mullingar Harbour will host the IWAI’s Float to the Fleadh from Sunday 31 July to Sunday 7 August. As with the Shannon Harbour rally, vessels attending are required to apply for a free visitors permit before entering the canal network.

Published in Inland Waterways

Waterways Ireland advises masters and owners of vessels on the Grand Canal that the 24th level of the Barrow Line will be temporarily closed to navigation for essential maintenance and repairs from Monday 20 to Wednesday 22 June.

Passage from Rathangan to the 24th Lock and through McCartney’s Lock in Monasterevin will not be possible during this time, the cross-border body for Ireland’s inland waterways adds.

Published in Inland Waterways

Waterways Ireland wishes to advise masters and owners of vessels on the Grand Canal that Lock 3 on the main line is temporarily closed for essential maintenance and repairs until next Friday 20 May. Passage through the lock will not be possible until these works are completed.

Published in Inland Waterways

Waterways Ireland has issued notice that it plans to remove vessels in contravention of bye-laws from three of its inland waterways from early next month.

Vessels that appear abandoned or have no no permit (as per Bye Law 6(8), are doubled moored and/or causing obstruction (sunk) (Bye Law 27 (3)), or are deemed to be/likely to cause a hazard to navigation (Bye-Law 33(3)) will be removed from the Grand Canal, Royal Canal and Barrow Navigation from Wednesday 4 May.

Removed vessels may then be subsequently disposed of in accordance with Bye Law 34(2).

Affected vessels have been stickered where access allows and owners, where known, have been contacted, Waterways Ireland says.

Published in Inland Waterways

Waterways Ireland has provided an update for masters and owners regarding canal boat passage arrangements in and out of Dublin city for the 2022 boating season.

Movements in or out of the city on its inland waterways will continue to be organised by prior arrangement to take place as a single movement in one day.

Passage will be organised and assisted for craft if they have the valid permit(s) and arrangements in place with the Waterways Ireland inspectorate. Some flexibility may be required on dates/times of travel to align with staffing and other considerations.

In order to plan the necessary lock assistance for movements east of Lock 12 on either canal, masters are required to contact the Eastern Regional Office at [email protected] or +353 (0)1 868 0148 prior to making passage.

At time of making contact, masters should provide the following details:

  • Length, beam, water and air drafts of craft (provide approximates if don’t have exact dimensions)
  • Permit number and expiry date of current canal permit
  • Contact details for making arrangements

On the Grand Canal, a minimum of two days’ notice prior to intended passage must be given and, with the exception of pre-arranged events, a maximum of two boats per day will be taken through the locks, travelling either east or west.

Due to periodic anti-social activity along some of canal route into Dublin, boat passage will generally not be arranged in certain weather conditions and at weekends when less support is available. This can be planned for at time of making contact and suitable arrangements for passage made.

On the Royal Canal, repairs and upgrades continue to Spencer Dock Sea Lock, so boat passage (including Newcomen Bridge lifts) will be on a reduced schedule.

In addition, there will be no boat passages permitted through Locks 2 and 4 on Whitworth Road from next Tuesday 12 April for two weeks due to gate repair, gate measurement and associated works. Sections of towpath on the south side of the canal also require closure during this time.

Masters are asked to note that bridge lift dates are pre-set and as listed below, and normal restrictions will apply. Two weeks’ notice in advance of these is required; and lock assistance, bridge lift operation and sea lock passage will then be organised accordingly:

  • Sunday 1 May, 9am-1pm (Liffey Low Water at 0620, 1839)
  • Saturday 4 June, 9am-1pm (LW @ 0915)
  • Tuesday 21 June, 11am-1pm (LW @ 1156)

Masters and owners are also reminded to ensure that they have the following before making the passage through the city locks on either canal:

  • adequate fuel on board
  • competent and adequate crew to operate the boat and locks (minimum crew of 3)
  • a lock key on board their boat
  • mooring lines of adequate length to handle vessel through a lock (approx. 15m length)
  • no known mechanical problems with their boat

Waterways Ireland reserve the right to postpone passage to another day if all of these are not in place.

Lock passages can be arranged in the boating season from now until the end of October, subject to any other restrictions that may be advised by Notice from time to time.

Also note that aquatic weed is generally more prevalent as the season progresses which can hamper passage.

Boaters will be facilitated as far as practicable although Waterways Ireland cannot guarantee that passage will be possible on every planned date. Early contact will greatly assist planning and facilitate the making of the necessary arrangements.

Published in Inland Waterways

Waterways Ireland advises users of the Grand Canal’s Barrow Line that navigation between Spencer Lock in Rathangan and Macartney Lock in Monasterevin will be closed from Monday 21 March to Friday 1 April inclusive to facilitate dredging works.

Published in Inland Waterways

Waterways Ireland advises of a number of temporary closures and scheduled works across the inland waterways in the coming days.

On the Grand Canal, masters of vessels should note that there will be no boat passages permitted on the Nass Branch (NCB2) for six weeks from Monday 14 February to facilitate breast gate replacement and associated works.

On the Shannon Navigation, Athlone Lock will be closed to boat traffic from Wednesday 16 to Friday 18 February to allow for the relocation hydraulic and electrical services as part of recent flood relief works.

Further north, essential dredging works will see the closure of Portna Canal on the Lower Bann Navigation to boat traffic from Monday 14 to Monday 21 February.

And in Dublin, masters and users of the Royal Canal should note essential tree works taking place between the 12th Lock and Granard Bridge (Castleknock Road) from Monday 14 February.

These works are expected to last for 10 working days which may not be consecutive, weather and staff resources allowing. Vessel owners moored on the north band are asked to cooperate with the tree works contractor to access the bank area for tree removal.

While closure of the towpath is not foreseen, towpath users are asked to be mindful of the works ongoing.

Published in Inland Waterways

Waterways Ireland advises that the towpath on the south bank of the Grand Canal adjacent to Church Avenue in Sallins, Co Kildare will be closed from Tuesday 15 to Saturday 26 February.

This closure is to facilitate tree removal works for the new Grand Canal Greenway route, the cross-border body for Ireland’s inland waterways says. It follows a similar closure from Lucan to Hazelhatch that continues until this Sunday 6 February.

Published in Inland Waterways

Waterways Ireland advises users of the Grand Canal from Lock 12 in Lucan to Hazelhatch that the towpath on the north bank will be closed from Monday 10 January to Sunday 6 February inclusive.

This four-week closure is to facilitate site investigation works for the Grand Canal Greenway Project, the cross-border body for Ireland’s inland waterways says.

Published in Inland Waterways
Page 5 of 18