Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Border Post Site

The ferry port of Holyhead has been confirmed by the Welsh Government for the site of a planned new Border Control Post (BCP).

Physical checks are required on certain goods entering the UK from the EU due to Brexit and the deal struck by the UK Government.

Further controls on imports are due to be introduced in phases this year by the UK Government.

Checks were due to be introduced in stages from 1 April and from 1 July, but most import checks have now been pushed back to January 1 2022.

Border Control Posts (BCPs), where the required physical inspections will take place, are being established across the UK.

At Holyhead inspections will be required on goods such as animals, plants and products of animal origin entering Wales from the Republic of Ireland. These checks are the responsibility of the Welsh Government and will be in place in order to ensure goods entering the UK do not pose a risk to public health, or to the spread of animal or plant diseases.

Welsh Government has announced that Plot 9 at Parc Cybi has been selected as the site for the post.

A planning consultation under a Special Development Order will begin shortly.

For much more reading on this development, NorthWalesLive reports including an image of the BCP plot site. 

Published in Ferry