Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: ABP

The leading ports group in the UK, Associated British Ports (ABP) has published its Annual Review 2022 (download), reflecting on its success in “Keeping Britain Trading”, and its many achievements in the past year as it supported its customers throughout a challenging period.

ABP’s Annual Review 2022 demonstrates how ABP is investing to build more resilient, sustainable supply chains, embracing innovative new equipment and technology, building infrastructure, and enabling trade and economic growth in regions and coastal communities around the country.

The year saw several industry firsts in the field of technology and sustainability, including the arrival of two fully ‘mains powered’ electric cranes at Ipswich, and the world’s largest hydraulic crane at Immingham. ABP also became the first organisation in the UK to invest in innovative wearable safety devices and the first UK port operator to provide a new range of Personal Protective Equipment (PPE) workwear with an SA8000 certification of social responsibility.

ABP’s Chief Executive Officer, Henrik L. Pedersen said: “Our port operations continue to lead the industry thanks to our people and our continuous investments, such as upgrading our Humber container terminals, building new warehouses for our customers, and acquiring new cranes and port equipment, powered by biofuel, electricity, and a significant amount of solar power.

“In 2021, we invested over £150 million in our ports, as we continue to embrace technological advances, such as launching the first private 5G network of any UK mainland port and being the first to install commercial shore power connectivity in the UK at our Port of Southampton.”

Maritime Minister Robert Courts said: “New technology and sustainability are key to maintaining the UK’s strong position in international trade, and it’s great to see Associated British Ports take these all-important steps to secure our maritime sector's green legacy.

“We’ve faced unprecedented challenges over the last few years and this annual review shows just how innovative the UK’s maritime sector is.

“As we move towards net-zero emissions, I hope to see more industry leaders follow in their footsteps and strive towards a greener future.”

To date, ABP has invested over £60 million across its ports in electric/hybrid equipment and on-site solar arrays and wind turbines, which has contributed to a reduction of over 35% carbon emissions in its port operations. ABP is also at the heart of the renewable energy sector, supporting the continued growth of the Offshore Wind industry and the development deployment of new technologies such as hydrogen and carbon, capture and storage.

ABP’s ports are primed and ready for the UK’s transition to alternative and low carbon energy production and following the success of Green Port Hull, and Lowestoft Eastern Energy Facility (LEEF), ABP launched its ambitious plans for South Wales in its Future Ports: Wales Vision, with Floating Offshore Wind (FLOW) at its core in November 2021.

ABP’s five ports in south Wales, (from west to east): Swansea, Port Talbot, Barry, Cardiff, and Newport) will play a pivotal role in the coming transformation of logistics, energy generation and manufacturing towards a low carbon economy.

ABP’s 21 ports are delivering on their mission of Keeping Britain Trading, and leading the industry in safety, sustainability, and innovation.

Published in Ports & Shipping

The first ports group in Europe, Associated British Ports (ABP) is to use a new digital Master Pilot Exchange programme developed by Ports of Auckland, eMPX, simplifying the current process.

Already in use at ports in Australia and New Zealand, ABP’s 21 ports across the UK (among them Ayr, Barrow and Cardiff) will become the first European-based ports to roll out and use the software. After a successful trial completed in 2021, eMPX will assist all ABP marine pilots in helping to guide ships of all shapes and sizes into safe harbours.

eMPX, the new global standard for master-pilot exchange, is designed with cutting-edge technology, and provides pilots with an entirely digital experience, eliminating the need for paper-based processes.

Using an iPad, pilots will be able to plan ahead of a vessel’s arrival at port, before sharing the plans and port data with ships’ masters, with the ability to update the plan if a ship is delayed. Data can also be stored, with all data then stored in the cloud, readily available for future reference.

The use of eMPX at ABP’s ports is part of its long-term vision for digitalisation. Already in use amongst marine pilots in Southampton, ABP plans to roll out eMPX with pilots in its other 20 ports by the end of 2022.

Published in Ports & Shipping

The largest port operator in the UK, Associated British Ports (ABP), is bringing forward more than 1,000 acres of development land to support the UK’s supply chain, manufacturing and renewable energy sectors.

ABP operates 21 ports around the UK and is making 14 strategic sites, encompassing a total of 1,075 acres (435ha), available for a range of business uses.

ABP’s Chief Executive Officer, Henrik L. Pedersen, comments: “Our ports – with their superb connectivity both domestic and internationally, together with established infrastructure – already play a key role in the UK manufacturing, supply chain and energy sectors.

“This initiative will enable a growing number of businesses to leverage our land, property partnering expertise and power capacity. We believe this can make a significant contribution to the country’s economic vibrancy and supply chain efficiency."

“ABP is a strategic partner for UK businesses assisting the country’s post-pandemic recovery, and achieving the common goal of decarbonisation.

A first tranche of 14 sites is being brought forward at ports including: Cardiff, Immingham, Newport (see photo), Port Talbot, Southampton and Hull. Next year will see the release of further opportunities. All locations benefit from strong rail and road connectivity plus renewable energy generation.

During the next 18 months, ABP has committed to spending more than £5m to make the sites ready for development, obtaining appropriate outline planning consents, technical understanding and carrying out essential land preparation.

Enhancing the supply chain

Bruce Robertson, head of supply chain and consumer advisory at CBRE – which is advising ABP on the initiative – comments: “The country needs more distribution hubs adjacent to major conurbations with a good labour supply and which can connect into our road and rail networks. These ABP sites are superbly situated to do just that.

“The need for more warehouse space to fulfil online retailing – which is growing and was accelerated by the pandemic – plus ongoing labour shortages are putting unprecedented pressure on the UK’s supply chain.”

The UK currently has the third highest e-commerce penetration ratio globally at 24% with annual online spend of approaching £100bn. The online spending ratio is forecast to rise to 32% by 2025. It is estimated that for every additional £1bn of online spend around 1m sq ft of logistics space is needed to fulfil delivery.

Supporting manufacturing and green energy production

Port-centric manufacturing projects have already seen ABP partner with a wide range of businesses to co-invest in bespoke facilities. And as the UK reshapes its energy generation strategy, port locations will play an increasingly important role in supporting the offshore wind industry.

Henrik L. Pedersen added: “One of our biggest offshore wind projects is Green Port Hull – a £310m state-of-the-art production and assembly facility on which we partnered with the wind turbine supplier, Siemens Gamesa Renewable Energy.

“Facilities off the East Coast of the UK will play a pivotal role in green energy generation, and we believe our land development initiative can help anticipate future manufacturing demand for these facilities on the way towards a net zero carbon country.”

Full list of site locations and sizes:

ABP Business Park, Cardiff (36 acres)

Atlantic Side South Dock & West Way, Newport (two sites of 73 acres and 18 acres respectively)

Cliff Quay, Ipswich (11 acres)

Grimsby Automotive Park (92 Acres)

Harbourside, Port Talbot (85 acres)

Hull International Enterprise Park (468 acres)

Imm-Port and Queens Road, Immingham (two sites of 51 acres and 9 acres)

King George & Queen Elizabeth Dock, Hull (159 acres)

Redbridge and Site L, Southampton (two sites of 42 acres and 7 acres)

High Level North Dock & 1:40, Liverpool (two sites of 6 acres and 11 acres)

Published in Ports & Shipping

A major ports group owner and operator in the UK, Associated British Ports (ABP) has appointed a new Divisional Port Manager for ports in south Wales and south-west England.

ABP has welcomed Simon Brown for their Wales & Short Sea Ports (W&SSP) region where the new appointee will have responsibility for port activities across all five of ABP’s ports in South Wales located in Cardiff, Newport, Barry, Port Talbot and Swansea.

In addition the role of the manager includes ABP's south-west England ports of Plymouth and Teignmouth (where offshore cruiseships lay at anchor, see P&O story)

Brown will also be working closely with the W.E. Dowds team in South Wales to grow the role of Newport on the Bristol Channel as the UK’s number one port for finished steel.

Andrew Harston, ABP Wales and Short Sea Ports Director, said: “We’re delighted to welcome Simon to our team in the Wales & Short Sea Ports region. He will bring with him decades of experience, which will help deliver an exciting future and drive further growth and economic prosperity in both Wales and the South West of England.

Before joining ABP in November, Brown served as Port Director Mersey for Peel Ports (another UK ports group) where in the Port of Liverpool and prior to that, he had a long career in the shipping industry, working with the Maersk Company between 2006 and 2018. He then joined P&OCL as a graduate and worked in the UK, Kenya, Hong Kong, Singapore and the USA before Maersk acquired P&O Nedlloyd in 2005.

Published in Ports & Shipping

The Welsh capital of Cardiff is where its port celebrated the start of a new contract with Valero, a global refiner specialising in the manufacture of transportation fuels and petrochemical products. The development will help power the economy of the city and the wider region.

The new long-term agreement includes occupation of a 12-acre storage and distribution terminal adjacent to Associated British Ports (ABP)’s Roath Dock in Cardiff which will be fed by coastal tankers utilising the port's multimodal and deep-sea connectivity.

As part of the agreement, Valero will be importing predominantly road fuels, including petrol, ultra low sulphur diesel (ULSD) and biofuels, as well as heating fuels, into Cardiff for distribution to the regional market in south Wales.

Valero utilises a coastal shipping service linking its west Wales refinery in Pembroke (Port of Milford Haven) to its network of storage and distribution terminals around the UK and Ireland, with expectations to handle considerable liquid bulk tonnage through Cardiff every year.  

ABP’s Port of Cardiff’s strategic location facilitates access to a market of 1.5 million people living in the Cardiff Capital Region, which equals approximately half the population of Wales.

In preparation for the new contract, ABP has made significant investments in enhancing port infrastructure, including investing  more than £400,000 in jetty infrastructure upgrades and recently completion of a five year programme to replace both the inner and outer lock gates, representing a £5 million investment to secure  marine access for the next 50 years. ​​​​​​​

Andrew Harston, Regional Director for ABP’s Wales and Short Sea Ports, said: “Valero is a great example of a company that is able to use sea transport for the 100 mile journey from Pembroke to Cardiff.

“ABP has a longstanding relationship with Valero and we look forward to this continuing our collaboration into the future with this new agreement.”

ABP owns and operates 21 ports across the UK, located in close proximity to important domestic industrial clusters, logistics hubs and major conurbations. ABP owns a total of 3,743 ha of freehold land, which includes 960 ha of strategic development land in prime locations across the country.

Published in Ports & Shipping

#ports - The Irish Sea Port of Silloth operated by Associated British Ports (ABP) has handled the first delivery of wood pulp for its new Japanese customer.

According to ABP, the Futamura Group manufacture cellulose and polymeric films for the packaging industry who have a major production site in Cumbria where the north-west English port is located.

Wilson Blyth (see Dun Laoghaire call) delivered the 2,500 tonne wood pulp to Silloth, having loaded the import in South America. The cargo will be transported to the company’s production site in Wigton, Cumbria, which employs around 270 people. The wood pulp will be used to make packaging films for foodstuffs such as sweets, tea, coffee and snack products.

Carl Bevan, ABP Divisional Port Manager – North West, said: “We’re delighted to welcome Futamura Group as a new customer at our Port of Silloth and look forward to working together to support a prosperous future for the Cumbrian economy.”

Tom Ismay, Procurement Manager at Furtamura, said: “It has been a very smooth transition working with ABP and we are glad that our local infrastructure means we can easily bring goods in via such a convenient port. One bulk ship has taken approximately 200 lorry loads off the road. Sustainability is important to Futamura and we are working hard to make changes where we can."

Published in Ports & Shipping

#CruiseLiners - The deep blue-hulled Marco Polo, Cruise & Maritime Voyages veteran vessel as Afloat previously featured calling to Irish ports is among seven cruiseships that will use the UK Port of Hull this season, writes Jehan Ashmore.

The North Sea port located on the Humber estuary is operated by Associated British Ports (ABP) and has become an increasingly popular cruise calling destination and for those directly departing from the port in East Yorkshire. In order to further attract cruise-goers, ABP has invested in creating additional car parking for holidaymakers to ensure a stress-free trip embarking.

Marco Polo has called to the Port of Hull throughout the summer and Afloat will have more to report on a mini-cruise between Hull and Harwich in Essex.

In addition to CMV's Marco Polo, the first caller this season to Port of Hull was Silversea Cruises six-star expedition ship, Silver Cloud. The 250 passengers enjoyed a day trip to Hull, last year's UK City of Culture and to nearby historically-steeped York.

According to ABP, port apprentices and staff lined up to welcome the Silver Cloud passengers to Hull as they enjoyed canapés and jazz music prior to boarding. Also taking place was a traditional plaque exchange held on board between ABP, Silver Cloud’s Captain and Hull City Council’s Lord Mayor and Admiral of the Humber.

The 12 day Silversea Cruise toured the UK which concluded in the Pool of London where the 157m entered through the iconic Tower Bridge. Also this season, passengers boarded Silver Cloud from this central location on a cruise to include Ireland's Wild Atlantic Way. 

Hull is centrally located port on the Humber and is already home to daily P&O Ferries operated routes to Zeebrugge and Rotterdam. Together these overnight services annually handle just under one million passengers travelling to Belgium and The Netherlands.

Published in Cruise Liners
Tagged under

#Ports&Shipping - The Scottish south-western Ports of Ayr and Troon has been further reinforced by the completion of upgrades at Troon harbour, another project aimed at positioning the port for future growth.

According to Associated British Ports (ABP) following extensive off-site works over the winter period, Troon's East pier Ro Ro terminal saw the delivery and installation of six upgraded fender units to improve the ability of the pier to accommodate larger vessels on the berth in all weather conditions.

Completion of this upgrade will allow ferries and other vessels of up to 160m to berth and will also give access to the port’s massive 180 tonne capacity linkspan, which remains the largest on the Clyde.

ABP’s latest investment follows closely on from the delivery of the port’s new Pilot boat, the “MV Scotia” and reinforces gains made at both harbours in recent years.

Commenting on these recent developments Stuart Cresswell Port Manager for Ayr and Troon, said: “The world of shipping never stands still and with a growing trend towards building ever larger vessels, we understand that it is absolutely essential for us to keep investing in our infrastructure and equipment to ensure we can continue to provide an efficient service for all of our customers.

“The fender upgrade at Troon represents a £600,000 investment just shortly after we have taken delivery of our new £700,000 pilot boat. The combination of these improvements will allow us to berth the largest of vessels in all weather conditions, which is an essential requirement for the running any modern port.”

Published in Ports & Shipping
#FERRY – Following yesterdays High Court appointment of an interim examiner to the Fastnet Line Group, the ferry operator has issued two statements (click here) and an apology to passengers with the immediate closure of sailings, writes Jehan Ashmore.
As part of the examinership process, a re-structured business plan has been implemented with the Cork-Swansea service set to resume in the shoulder months starting on Easter's Good Friday, 6th April 2012 and throughout the high-season months, and ending the season on 29th September.

The discontinued winter sailing schedule for this year is also expected not to be repeated during October 2012-March 2013. Fastnet Line's decision to make the Celtic Sea route into a shoulder season and summer only service follows a similar path taken by Stena Line which withdrew Dun Laoghaire-Holyhead (HSS) sailings in mid-September, for report click here. The central corridor route is due to reopen sometime in April or May 2012.

Cork City and County council and Kerry County council have provided €700,000 to support Fastnet Line and yesterday they announced an additional €150,000 in co-funding for the period of the examinership. In order to stabilise finances the ferry company are to radically reduce passenger capacity of the Julia (see photo) from 1,500 down to 950. This is in line with the capacities of the Julia serving 'night' sailings.

She has a crew predominately from Eastern Europe and Irish and UK deck officers. The Bermuda flagged, Hamilton registered vessel is currently berthed at Ringaskiddy Ferry Terminal, Cork Harbour. At 154m she is the largest ferry to date capable of berthing in the limited confines of the swing basin in Swansea and with a draft of 5.8m in a port which is subject to a large tidal range on the Bristol Channel.

Operating costs on the 10 hour service has been severely hampered by continuing increases to world oil prices. From the year 2010 to this year, fuel costs rose by 27% and almost 50% from the original budget of 2009. The company claims that each crossing amounts to €18,560 alone in fuel costs.

Fastnet Line to date has carried 150,000 customers, of which 75% have originated from the UK market, generating on average €350 per person (€40m approx) exclusive of fare and on-board spend. This crucial market is core to the success of the company's direct 'gateway' route to scenic south-west Ireland, with Swansea connected to the M4 motorway linking midland population centres and London. The operator claims a saving of 600km driving based on a round trip compared to using rival ferries running on routes to Rosslare from Pembroke Dock and Fishguard.

Since the reinstatement of the service in March 2010, after Swansea Cork Ferries pulled the Superferry (photo) off-service in 2006, the loss to tourism generated revenue on both sides of the Celtic Sea was estimated to be £25m per annum according to the Welsh Assembly and a similar figure recorded in the Cork and Kerry region.

The company also outlines the reduction in carbon emissions saved from operating the only direct service specifically connecting the regions of Glamorgan and Munster. Some 500,000 freight miles alone were saved in the Welsh region since the service started instead of using alternative route running from Pembrokeshire ports.

Published in Ferry
As one of the consequences of the statutory transfer of operations from Dundalk Port Company to the Dublin Port Company in July, the grab-hopper dredger, Hebble Sand is up for sale, writes Jehan Ashmore.
Last year Dundalk Port Company had accumulated significant trading losses. Against such difficult conditions, Dublin Port Company decided to exit the businesses of dredging, ships agency and stevedoring in the Co. Louth port with effect from the end of September.

The Dublin Port Company has sought expressions from interested parties in undertaking the remaining activities of the port on an exclusive basis.

The Dundalk registered dredger arrived to the capital port on 14 July where she remains berthed at the Bulk Jetty in Alexandra Basin. Her previous owners, the Dundalk Port Company were unique in that they were the only port company to own and operate a dredger in the Republic. For many years the 757-tonnes dredger has carried out numerous contract assignments in ports throughout the island of Ireland including work on the Samuel Beckett swing-bridge and the most project was at Queens Quay, Belfast on the Lagan close to the city-centre.

Hebble Sand was launched by Richard (Shipbuilders) of Lowestoft for British Dredging and later used by Associated British Ports to serve a network of UK ports. Despite her age, the near fifty-year-old veteran vessel has been kept in excellent condition and this was evident during a rather unusual appearance for a ship of her type when attending the Dublin Docklands Maritime Festival in 2009.

She was made open for the public amongst the tall-ships that lined the Liffey Quays. Such an initiative was inspiring as it provided a rare opportunity for the public to access such a dredger which otherwise is not familiar compared to the popularity of visiting tall-ships and naval vessels.

The only other port to operate their own dredger is Londonderry Harbour Commissioners, whose Lough Foyle has worked on projects outside her homeport. This has included work at the new £40m Stena Line ferryport terminal on Loch Ryan close to Cairnryan and is due to open in November.

Published in Ports & Shipping

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023