Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Galway Harbour Company

#Exclusion - The only port in Ireland to be excluded from a special EU fund is Galway Harbour and it’s future could be in jeopardy unless the situation is tackled, reports Galway Bay FM.

CEO of Galway Harbour Eamon Bradshaw says that the recent downgrade of the facility to a Port of Regional Significance means it does not quality for European funding.

He says that only ports classified as tier one or tier two facilities are entitled to assistance from the Ten-T Connecting Europe programme – assistance that the Port urgently needs. For more click here.

Published in Galway Harbour

#GalwayPortPlan – The Connacht Tribune reports that the decision on Galway Harbour on the proposed redevelopment of the docks will be announced by An Bórd Pleanála next Friday, September 11.

The planning appeals board has been deliberating on plans for the €126 million redevelopment of the docks since an oral hearing took place in January.

The proposal has the potential to transform the face of Galway into the next century, according to proponents of the projects. The 85.4 hectare project, which is expected to take eight years to construct, will be built in four phases.

For more on the proposed expansion of the mid-west port, click this link.

Note the newspaper has a photo of the harbour showing leisure craft and commercial shipping sharing the port's Dún Aengus Dock.

On the right side can be seen the stern of the aptly named Galway Fisher, an oil products tanker that regularly calls to the port which requires a very skillful approach (see video) through the dock chamber.

Published in Galway Harbour

#BiggestCallerCrystal Symphony at 51,044grt is the biggest caller in tonnage terms to Galway Harbour this cruise season, yet her passenger capacity was surpassed by Thompson Spirit which called earlier this summer, writes Jehan Ashmore.

The 922 capacity Crystal Cruises operated vessel marks the sixth caller out of a total eight to include the 1,350 Thompson Spirit in May, making 2014 one of the busiest for Galway Harbour Company in recent years.

The mid-west port has proposed plans for a new port further out in Galway Bay to allow much larger cruiseships to dock. For further details visit their website HERE.

Crystal Symphony this morning anchored off Galway Harbour, close to Mutton Island having made as previously reported another anchorage call yesterday off Mouvile, Co. Donegal close to Greencastle on Lough Foyle.

It may be nearing the end of August, but the season continues as German operator, Phoenix-Reisen makes an appearance next Sunday with their Artania (44,348grt)

The one-time Royal Princess is due at the end of the month with a capacity of 1,260, making her the third largest caller of passengers.

At the other end of the spectrum, Club Med Cruises striking looking five mast sail-assisted Club Med 2 (14,983grt) with only 386 guests is scheduled to end the season in early September.

Published in Cruise Liners

#GalwayCruiseCalls-Galway Harbour Company is to have one of the busiest cruise seasons in recent years with the Norwegian owned expedition cruise ship Fram, which is to anchor offshore next Wednesday, writes Jehan Ashmore.

Fram is unique within the operations of Hurtigruten, as unlike her fleetmates, the expedition cruiseship does not serve along the Norwegian fjords on the daily service linking coastal communities in the combined role of car-ferry, cruiseship and cargoship.

Instead the forthcoming visitor to Galway is however more accustomed to exclusively 'cruising' deeper into the Arctic and Antarctic circles and also not to navigating to the rather more temperate climate of Galway.

Commenting to Afloat.ie, Captain Brian Sheridan, Galway Harbour Company Harbourmaster said, "the Fram will be the first of 8 cruise ships in 2014 which is the largest number of cruise ships in recent years, culminating on the 27 August with the arrival of the 6 star cruise ship Crystal Symphony".

Holland American Line's Prinsendam is returning to Galway again in 2014 after her call this summer. HAL was a regular caller to Galway in 1939 and when in total 56 calls were made. Prinsendam which is the smallest of the fleet, will however make up for generating a bigger presence when it comes to placing Galway on the global cruise map by another call to the City of the Tribes in 2015.

This call of Prinsendam will form a hat trick visit by the cruiseship to the mid-western seaboard port and that been served by one of the world's oldest cruise lines.

In addition to the constantly changing cruise scene, Thompson Cruises, P&O Cruises and Club Med are all new comers to Galway Harbour in 2014, which adds another significant milestone and boost in confidence to the port and that of the city.

The harbour company has development plans to extend land for a new outer port and asides improving cargo-handling operations will permit larger deep drafted cruiseships to dock alongside quays instead of anchoring offshore.

For further details visit the harbour company's dedicated port extension plans website HERE.

 

Published in Galway Harbour

#GalwayHarbour - Plans for the expansion of Galway Harbour are "99 per cent ready to go", as the Galway Independent reports.

Eamon Bradshaw, CEO of the Galway Harbour Company, said that the application for the new development would be submitted by the end of June.

As previously reported on Afloat.ie, the scheme will be the first Irish project lodged under new legislation that provides for planning permission on the grounds of "overriding public interest".

Bradshaw says that the necessary Natura Impact Statement has been completed, and economic and financial details were now being finalised for the redevelopment project at the harbour, recently recognised by the Government as a 'port of regional significance'.

Should it get the go-ahead from An Bord Pleanála, the new harbour will extend almost 1km out to sea with 660m of quay berth and plenty of space for cargo and container ships, oil tankers, fishing vessels and passenger ships.

The project will be completed in four phases, with the first €50 million phase extending the port by some 57 acres to accommodate a greater number of commercial ships and modern cruise liners.

Galway City Council recently granted extra time to the Galway Harbour Company for pre-expansion demolition works in the docks area.

The Galway Independent has much more on the story HERE.

Published in Galway Harbour

#GalwayPort - Galway Bay FM reports that the Galway Harbour Company has been given extra time by city councillors for the demolition of buildings in the docks area to make way for the upcoming port expansion.

Planning permission was granted five years ago for the removal of the Centre Pier building, which had been earmarked at the time as the location for a media centre for last summer's Volvo Ocean Race finale.

Now the Galway Harbour Company has three more years as it seeks further planning permission for the first phase of its expansion plans, as previously reported on Afloat.ie.

Published in Galway Harbour

#GalwayPort - Revived plans for the €200 million redevelopment of Galway Port may take a great leap forward in the next few weeks with the publication of a new policy document by the Minister for Transport.

The Galway City Tribune reports that Minister Leo Varadkar will release a 'Port Policy Statement' containing key recommendations for a development planning application to be made under IROPI (Imperative Reasons of Overriding Public Interest) legislation.

As previously reported on Afloat.ie, plans for a new deeper port in Galway Harbour were revived in August 2012 as harbour bosses sought to exercise a clause in the EU habitats directive.

Galway Harbour Company chief executive Eamon Bradshaw said at the time that the company was taking a new route after examining previous planning applications involving sensitive habitats.

He pointed out that under article 6.4 of the EU habitats directive, applications for projects classified under IROPI legislation allow developers to compensate for any infringement on sensitive habitats by restoring an area of a similar size in a different location.

It's now expected that the IROPI 'fast-track' will be approved if the Galway Harbour Company can prove that the port will have a significant economic benefit to bot the region and Ireland as a whole.

The Galway City Tribune has much more on the story HERE.

Published in Galway Harbour

#GALWAY BAY NEWS - The Connacht Sentinel reports that a series of steel piles in the River Corrib in Galway city centre are to be removed over concern at the danger posed to canoeists and kayakers.

The eight stanchions, which were installed at the mouth of the Corrib as part of the support structure for the temporary pedestrian bridge across the river during the Volvo Ocean Race finale last month, will be removed "as soon as possible" according to Galway City Council.

A spokesperson for the council said race organisers Let's Do It Global had encountered difficulties removing the steel piles from the stretch of water between the Spanish Arch and Claddagh Quay due to "unfavourable tides and poor weather".

Meanwhile, the Galway Harbour Company has declared that it made more profit from its car parking operation than from harbour activities.

Galway Bay FM reports that the company's accounts for 2011 show that more than 50% of its income is derives from car parking and rent.

Overall the harbour operator saw an 8% fall in revenue on the previous year, with a disappointing 18% drop in throughput. No comment has yet been made on these figures.

Published in Galway Harbour

#GALWAY HARBOUR - Galway Harbour management are looking forward to the prospect of Chinese investment in the port's redevelopment plans, the Galway Independent reports.

“Chinese investors clearly recognise not only the massive potential of ocean tourism, but also the specific potential for Galway as a destination port for cruise liners," said Fine Gael TD Brian Walsh, referring to discussions between the Government and Chinese officials in Beijing last week.

As previously reported on Afloat.ie, Galway Bay can expect to welcome at least nine cruise visits thus year, with the first scheduled to arrive late next month.

Walsh added: "Galway is an incredibly attractive city, and if we can make it accessible to the major players in the cruise-line market, the impact on the local economy would be immense.”

Galway Harbour Company CEO Eamon Bradshaw said that the port project had "illicited quite a bit of interest" when the company presented at the recent Chinese-Ireland Relations conference at NUI Galway.

"We’re confident that we do have a lot to offer and we are confident that an investor will come on board."

The Galway Independent has more on the story HERE.

Published in Galway Harbour
During the weekend call of L.E. Eithne to Galway Harbour, the Naval Service flagship shared the mid-west port with a Spanish oceanographic research vessel (RV) and a cargoship,writes Jehan Ashmore.
The port consists of a single basin named the Dún Aengus Dock where the Vigo registered RV Vizconde de Eza (2000/1,401grt) was berthed. The 53m vessel is run by the 'Secrataria General del Mer' (MARM) which is on an assignment to asses the abundance, estimation and distribution patterns of demersal-benthic species in the Porcupine Abyssal Plain. The port is of also the homeport to the Marine Institute RV vessels and their headquarters based in nearby Oranmore.

Also sharing the basin but located closer to the dock gates was Arklow Shipping Ltd's Dutch registered dry-cargo vessel Arklow Surf (2000/2,316grt). The dock is capable of handling more vessels simultaneously and of course used as a host-port of the high-profile Volvo Ocean Race which is due to return next year.

Galway and neighbouring Limerick City with its Ted Russell Dock, are the only dock-gate accessed ports on the island of Ireland. In the case of Galway there is an exception as freight operations are also available from an outer pier on the seaward side of Dún Aengus Dock though only for domestic purposes. From this pier the dedicated Aran Islands freight service is operated by Lasta Mara TEO's Blath na Mara (1983/330grt). As for Limerick, vessels can also berth outside the dock but they tend to be small port-work related craft that use the outer berth on the Shannon Estuary.

The Galway Harbour Company in recent years have proposed plans for a new outer port, to be built in four stages with a completion date set for 2017. This would enable larger deeper drafted vessels such as tankers and cruiseships to dock in the new port. In the meantime cruiseships anchor off Mutton Island. In addition a freight rail-link, berthing for an inshore fishing fleet and a 216 berth marina are proposed.

To read more about the port proposals visit http://www.galwayharbour.com/news.php?id=11and for aerial visual impressions click HERE.

Published in Galway Harbour
Page 1 of 2

Howth 17 information

The oldest one-design keelboat racing class in the world is still competing today to its original 1897 design exclusively at Howth Yacht club.

Howth 17 FAQs

The Howth 17 is a type of keelboat. It is a 3-man single-design keelboat designed to race in the waters off Howth and Dublin Bay.

The Howth Seventeen is just 22ft 6ins in hull length.

The Howth 17 class is raced and maintained by the Association members preserving the unique heritage of the boats. Association Members maintain the vibrancy of the Class by racing and cruising together as a class and also encourage new participants to the Class in order to maintain succession. This philosophy is taken account of and explained when the boats are sold.

The boat is the oldest one-design keelboat racing class in the world and it is still racing today to its original design exclusively at Howth Yacht club. It has important historical and heritage value keep alive by a vibrant class of members who race and cruise the boats.

Although 21 boats are in existence, a full fleet rarely sails buy turnouts for the annual championships are regularly in the high teens.

The plans of the Howth 17 were originally drawn by Walter Herbert Boyd in 1897 for Howth Sailing Club. The boat was launched in Ireland in 1898.

They were originally built by John Hilditch at Carrickfergus, County Down. Initially, five boats were constructed by him and sailed the 90-mile passage to Howth in the spring of 1898. The latest Number 21 was built in France in 2017.

The Howth 17s were designed to combat local conditions in Howth that many of the keel-less boats of that era such as the 'Half-Rater' would have found difficult.

The original fleet of five, Rita, Leila, Silver Moon, Aura and Hera, was increased in 1900 with the addition of Pauline, Zaida and Anita. By 1913 the class had increased to fourteen boats. The extra nine were commissioned by Dublin Bay Sailing Club for racing from Kingstown (Dún Laoghaire) - Echo, Sylvia, Mimosa, Deilginis, Rosemary, Gladys, Bobolink, Eileen and Nautilus. Gradually the boats found their way to Howth from various places, including the Solent and by the latter part of the 20th century they were all based there. The class, however, was reduced to 15 due to mishaps and storm damage for a few short years but in May 1988 Isobel and Erica were launched at Howth Yacht Club, the boats having been built in a shed at Howth Castle - the first of the class actually built in Howth.

The basic wooden Howth 17 specification was for a stem and keel of oak and elm, deadwood and frames of oak, planking of yellow pine above the waterline and red pine below, a shelf of pitch pine and a topstrake of teak, larch deck-beams and yellow pine planking and Baltic spruce spars with a keel of lead. Other than the inclusion of teak, the boats were designed to be built of materials which at that time were readily available. However today yellow pine and pitch pine are scarce, their properties of endurance and longevity much appreciated and very much in evidence on the original five boats.

 

It is always a busy 60-race season of regular midweek evening and Saturday afternoon contests plus regattas and the Howth Autumn League.

In 2017, a new Howth 17 Orla, No 21, was built for Ian Malcolm. The construction of Orla began in September 2016 at Skol ar Mor, the boat-building school run by American Mike Newmeyer and his dedicated team of instructor-craftsmen at Mesquer in southern Brittany. In 2018, Storm Emma wrought extensive destruction through the seven Howth Seventeens stored in their much-damaged shed on Howth’s East Pier at the beginning of March 2018, it was feared that several of the boats – which since 1898 have been the very heart of Howth sailing – would be written off. But in the end only one – David O’Connell’s Anita built in 1900 by James Clancy of Dun Laoghaire – was assessed as needing a complete re-build. Anita was rebuilt by Paul Robert and his team at Les Ateliers de l’Enfer in Douarnenez in Brittany in 2019 and Brought home to Howth.

The Howth 17 has a gaff rig.

The total sail area is 305 sq ft (28.3 m2).

©Afloat 2020