Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: 29er Europeans

The waters of Rungsted, Denmark were the theatre of last week’s 29er European Championships where four Irish partnerships competed in the 165-boat fleet, writes Thomas Chaix.

A full series of 17 races was delivered by the Royal Danish Yacht Club from Thursday 30 June to Tuesday 5 July in varied and certainly challenging conditions, with a few long days afloat chasing after the wind.

The nine-race qualifying series over the first three days saw mostly light and shifty westerlies. Day one started with Johnny Flynn and James Dwyer-Mathews taking the first race win of the event, the beginning of three days of ups and downs for the boys that unfortunately concluded with a BFD disqualification on the final race, costing them a Gold fleet qualification.

The Van Steenberge siblings, Clementine and Nathan, also suffered from an inconsistent series including a BFD. But their excellent speed downwind also earned them three runner-up finishes which were enough to make the Gold fleet cut.

Nathan and Clementine Van Steenberge had a golden few days in Denmark despite some devastating setbacksNathan and Clementine Van Steenberge had a golden few days in Denmark despite some devastating setbacks

Elsewhere, the Riordan sisters Emily and Jessica had a more consistent series but just short of the Gold fleet. And the youngest of the Irish teams, Lucia Cullen and Alanna Twomey, settled with Bronze despite the boost of a fourth-place finish in their first race. 

The finals started with a champagne sailing day. The wind had gone south and the bay delivered a great 15 knots of relatively steady breeze with big waves.

In Gold, disaster struck with the Van Steenberges suffering gear failure on race one after a solid start. The repair was challenging but achieved afloat and they could resume racing in races two and three, finishing the day with an excellent sixth.

In Silver, Johnny and James climbed into the top five with a solid 1-12-8 scoreline. The Riordans found the going harder and finished their day 33-UFD-22, dropping ranks overall. It was also a challenging day for Lucia and Alanna in Bronze, dropping outside top 10 (40-25-24).

Clementine and Nathan (3169) on the Gold fleet start lineClementine and Nathan (3169) on the Gold fleet start line

The breeze then went to the west again, delivering a return of crazy shifts, random gusts favouring the specialists of the game of snakes and ladders.

It was a challenging day in Gold with frustrating outcomes. Despite this, Clementine and Nathan got back into top 25 for the first time of the week with a scoreline of 34-3-32 and discarding the previous day DNC. Johnny and James came back strong after a disastrous first race (discarded) to climb to third in Silver (36-10-2 on the day). The Riordans sailed a consistent day with a 19-19-14 to climb ranks again. And Lucia and Alanna had a stronger day, climbing back in touch of the top 10 (14-3-4).

Two races were sailed on the final day. The Van Steenberges sailed very well, making gains all around the course on the first race, taking ninth and getting themselves within a hair of a podium finish in the mixed category. They kept the best for the final race, leading the fleet from the first windward to the finish. The race win allowed them to jump in 18th overall (15th Europeans) and squeeze into second in the Mixed category.

The Silver fleet podium that was narrowly missed by Johnny and JamesThe Silver fleet podium that was narrowly missed by Johnny and James

In Silver, Johnny and James had a lot of points to bridge to win silver but certainly gave it their all, winning the first race and then delivering what was probably the best catch-up of the event converting a deep first windward position into a fifth. A mere two points remained and they settled for second overall (42nd at the event).

Emily and Jessica Riordan had a solid seventh in the first race and completed their event 21st in Silver (61st overall). With a 13th and 4th, Lucia and Alanna also climbed back into the Bronze top 10 (7th; 89th overall).

Counting our best all boys, best all girls and best any gender team, Ireland finished once more near the front of the nations cup in sixth position overall.

The next outing for the Irish 29ers will be the Worlds in El Balís, Barcelona in August where eight partnerships will compete in a fleet of 240 boats and growing.

Published in 29er
Tagged under

#29er - Atlee Kohl and Chris Bateman followed their overall victory at last month’s 29er Nationals with a strong performance at the class Europeans in Helsinki this past week.

The Royal Cork youth duo, and the only Irish contingent at the Helsingfors Segelklubb in Finland’s capital, ranked 17th in the Gold fleet after a week of racing which wraps up today, Sunday 12 August.

Published in 29er

Ireland's Offshore Renewable Energy

Because of Ireland's location at the Atlantic edge of the EU, it has more offshore energy potential than most other countries in Europe. The conditions are suitable for the development of the full range of current offshore renewable energy technologies.

Offshore Renewable Energy FAQs

Offshore renewable energy draws on the natural energy provided by wind, wave and tide to convert it into electricity for industry and domestic consumption.

Offshore wind is the most advanced technology, using fixed wind turbines in coastal areas, while floating wind is a developing technology more suited to deeper water. In 2018, offshore wind provided a tiny fraction of global electricity supply, but it is set to expand strongly in the coming decades into a USD 1 trillion business, according to the International Energy Agency (IEA). It says that turbines are growing in size and in power capacity, which in turn is "delivering major performance and cost improvements for offshore wind farms".

The global offshore wind market grew nearly 30% per year between 2010 and 2018, according to the IEA, due to rapid technology improvements, It calculated that about 150 new offshore wind projects are in active development around the world. Europe in particular has fostered the technology's development, led by Britain, Germany and Denmark, but China added more capacity than any other country in 2018.

A report for the Irish Wind Energy Assocation (IWEA) by the Carbon Trust – a British government-backed limited company established to accelerate Britain's move to a low carbon economy - says there are currently 14 fixed-bottom wind energy projects, four floating wind projects and one project that has yet to choose a technology at some stage of development in Irish waters. Some of these projects are aiming to build before 2030 to contribute to the 5GW target set by the Irish government, and others are expected to build after 2030. These projects have to secure planning permission, obtain a grid connection and also be successful in a competitive auction in the Renewable Electricity Support Scheme (RESS).

The electricity generated by each turbine is collected by an offshore electricity substation located within the wind farm. Seabed cables connect the offshore substation to an onshore substation on the coast. These cables transport the electricity to land from where it will be used to power homes, farms and businesses around Ireland. The offshore developer works with EirGrid, which operates the national grid, to identify how best to do this and where exactly on the grid the project should connect.

The new Marine Planning and Development Management Bill will create a new streamlined system for planning permission for activity or infrastructure in Irish waters or on the seabed, including offshore wind farms. It is due to be published before the end of 2020 and enacted in 2021.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE.

There are a number of companies aiming to develop offshore wind energy off the Irish coast and some of the larger ones would be ESB, SSE Renewables, Energia, Statkraft and RWE. Is there scope for community involvement in offshore wind? The IWEA says that from the early stages of a project, the wind farm developer "should be engaging with the local community to inform them about the project, answer their questions and listen to their concerns". It says this provides the community with "the opportunity to work with the developer to help shape the final layout and design of the project". Listening to fishing industry concerns, and how fishermen may be affected by survey works, construction and eventual operation of a project is "of particular concern to developers", the IWEA says. It says there will also be a community benefit fund put in place for each project. It says the final details of this will be addressed in the design of the RESS (see below) for offshore wind but it has the potential to be "tens of millions of euro over the 15 years of the RESS contract". The Government is also considering the possibility that communities will be enabled to invest in offshore wind farms though there is "no clarity yet on how this would work", the IWEA says.

Based on current plans, it would amount to around 12 GW of offshore wind energy. However, the IWEA points out that is unlikely that all of the projects planned will be completed. The industry says there is even more significant potential for floating offshore wind off Ireland's west coast and the Programme for Government contains a commitment to develop a long-term plan for at least 30 GW of floating offshore wind in our deeper waters.

There are many different models of turbines. The larger a turbine, the more efficient it is in producing electricity at a good price. In choosing a turbine model the developer will be conscious of this ,but also has to be aware the impact of the turbine on the environment, marine life, biodiversity and visual impact. As a broad rule an offshore wind turbine will have a tip-height of between 165m and 215m tall. However, turbine technology is evolving at a rapid rate with larger more efficient turbines anticipated on the market in the coming years.

 

The Renewable Electricity Support Scheme is designed to support the development of renewable energy projects in Ireland. Under the scheme wind farms and solar farms compete against each other in an auction with the projects which offer power at the lowest price awarded contracts. These contracts provide them with a guaranteed price for their power for 15 years. If they obtain a better price for their electricity on the wholesale market they must return the difference to the consumer.

Yes. The first auction for offshore renewable energy projects is expected to take place in late 2021.

Cost is one difference, and technology is another. Floating wind farm technology is relatively new, but allows use of deeper water. Ireland's 50-metre contour line is the limit for traditional bottom-fixed wind farms, and it is also very close to population centres, which makes visibility of large turbines an issue - hence the attraction of floating structures Do offshore wind farms pose a navigational hazard to shipping? Inshore fishermen do have valid concerns. One of the first steps in identifying a site as a potential location for an offshore wind farm is to identify and assess the level of existing marine activity in the area and this particularly includes shipping. The National Marine Planning Framework aims to create, for the first time, a plan to balance the various kinds of offshore activity with the protection of the Irish marine environment. This is expected to be published before the end of 2020, and will set out clearly where is suitable for offshore renewable energy development and where it is not - due, for example, to shipping movements and safe navigation.

YEnvironmental organisations are concerned about the impact of turbines on bird populations, particularly migrating birds. A Danish scientific study published in 2019 found evidence that larger birds were tending to avoid turbine blades, but said it didn't have sufficient evidence for smaller birds – and cautioned that the cumulative effect of farms could still have an impact on bird movements. A full environmental impact assessment has to be carried out before a developer can apply for planning permission to develop an offshore wind farm. This would include desk-based studies as well as extensive surveys of the population and movements of birds and marine mammals, as well as fish and seabed habitats. If a potential environmental impact is identified the developer must, as part of the planning application, show how the project will be designed in such a way as to avoid the impact or to mitigate against it.

A typical 500 MW offshore wind farm would require an operations and maintenance base which would be on the nearby coast. Such a project would generally create between 80-100 fulltime jobs, according to the IWEA. There would also be a substantial increase to in-direct employment and associated socio-economic benefit to the surrounding area where the operation and maintenance hub is located.

The recent Carbon Trust report for the IWEA, entitled Harnessing our potential, identified significant skills shortages for offshore wind in Ireland across the areas of engineering financial services and logistics. The IWEA says that as Ireland is a relatively new entrant to the offshore wind market, there are "opportunities to develop and implement strategies to address the skills shortages for delivering offshore wind and for Ireland to be a net exporter of human capital and skills to the highly competitive global offshore wind supply chain". Offshore wind requires a diverse workforce with jobs in both transferable (for example from the oil and gas sector) and specialist disciplines across apprenticeships and higher education. IWEA have a training network called the Green Tech Skillnet that facilitates training and networking opportunities in the renewable energy sector.

It is expected that developing the 3.5 GW of offshore wind energy identified in the Government's Climate Action Plan would create around 2,500 jobs in construction and development and around 700 permanent operations and maintenance jobs. The Programme for Government published in 2020 has an enhanced target of 5 GW of offshore wind which would create even more employment. The industry says that in the initial stages, the development of offshore wind energy would create employment in conducting environmental surveys, community engagement and development applications for planning. As a site moves to construction, people with backgrounds in various types of engineering, marine construction and marine transport would be recruited. Once the site is up and running , a project requires a team of turbine technicians, engineers and administrators to ensure the wind farm is fully and properly maintained, as well as crew for the crew transfer vessels transporting workers from shore to the turbines.

The IEA says that today's offshore wind market "doesn't even come close to tapping the full potential – with high-quality resources available in most major markets". It estimates that offshore wind has the potential to generate more than 420 000 Terawatt hours per year (TWh/yr) worldwide – as in more than 18 times the current global electricity demand. One Terawatt is 114 megawatts, and to put it in context, Scotland it has a population a little over 5 million and requires 25 TWh/yr of electrical energy.

Not as advanced as wind, with anchoring a big challenge – given that the most effective wave energy has to be in the most energetic locations, such as the Irish west coast. Britain, Ireland and Portugal are regarded as most advanced in developing wave energy technology. The prize is significant, the industry says, as there are forecasts that varying between 4000TWh/yr to 29500TWh/yr. Europe consumes around 3000TWh/year.

The industry has two main umbrella organisations – the Irish Wind Energy Association, which represents both onshore and offshore wind, and the Marine Renewables Industry Association, which focuses on all types of renewable in the marine environment.