Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Belview

At the historic Port of New Ross shipping will soon be run by Belview Port in Waterford, in a controversial move planned by Wexford County Council.

As the New Ross Standard reports, the Director of Services for Economic Development Tony Larkin made the announcement at the first meeting of the new Wexford County Council term on Friday.

In an update to councillors ahead of the imminent transfer of the port from the state to Wexford County Council, Mr Larkin said: 'We are taking over the operation of the port. We have been in due diligence for two years.'

Mr Larkin said he was informed last week that the takeover process has been completed, save for three ministers signing the document which will formally allow the transfer.

'The process of having the ministers sign it has now commenced. Immediately upon transfer all assets and staff will transfer to us and we will have responsibility as the port authority. We are not in the shipping business. We are in discussions with the Port of Waterford at Belview about them acting as our agents managing the shipping for a fee.'

To read further comments from Mr Larkin and more click here. 

Published in Irish Ports

Shipyards

Afloat will be focusing on news and developments of shipyards with newbuilds taking shape on either slipways and building halls.

The common practice of shipbuilding using modular construction, requires several yards make specific block sections that are towed to a single designated yard and joined together to complete the ship before been launched or floated out.

In addition, outfitting quays is where internal work on electrical and passenger facilities is installed (or upgraded if the ship is already in service). This work may involve newbuilds towed to another specialist yard, before the newbuild is completed as a new ship or of the same class, designed from the shipyard 'in-house' or from a naval architect consultancy. Shipyards also carry out repair and maintenance, overhaul, refit, survey, and conversion, for example, the addition or removal of cabins within a superstructure. All this requires ships to enter graving /dry-docks or floating drydocks, to enable access to the entire vessel out of the water.

Asides from shipbuilding, marine engineering projects such as offshore installations take place and others have diversified in the construction of offshore renewable projects, from wind-turbines and related tower structures. When ships are decommissioned and need to be disposed of, some yards have recycling facilities to segregate materials, though other vessels are run ashore, i.e. 'beached' and broken up there on site. The scrapped metal can be sold and made into other items.