Larne Harbour on the east coast of Antrim in Northern Ireland is currently the base for the MPI Resolution, the world's first purpose-built vessel for installing offshore wind turbines, foundations, and transition pieces.
The ship is working out of Larne to provide Operations and Maintenance services to the UK west coast wind farms and has been using Larne as the base port for these operations.
The 2003-built vessel is 130 metres in length overall and has a 38-metre beam.