Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: Liverpool

Preparations by the Isle of Man Packet Company reports 3FM are to see the ferry operator start trials and safety training at their new terminal in Liverpool.

The infrastructure built by a UK arm of the Irish contractor, John Sisk & Co as Afloat previously reported is located at Princes Half Tide Dock. The Department of Infrastructure is also working to ensure the berth will be ready for sea-trials to take place in early March.

This is to see the Steam Packet’s fast-craft, Manannan become the first vessel to berth at the new link-span which is less than a 1 km downriver of The Pier Head, the existing ferry terminal on Merseyside.

As long as such works can be put in place, the company expects the new terminal will be enabled to undertake Manannan’s mooring trials and familiarisation to be concluded towards the end of March.

According to the Steam Packet, the main priority is for Manannan to be in operation from Liverpool also at the end of the same month on the route to Douglas. Should it arise, a contingency plan will be put into effect for its first sailing to take place using the Pier Head terminal.

A fleetmate, flagship Manxman is also to make a debut at the new ferry facility for berthing trials in April, providing that everything goes according to plan. The flagship’s inaugural commercial call, however will be later in the year, when the terminal is scheduled for such sailings in November.

More here on the new Irish Sea terminal.

Published in Ferry

The UK's second largest ports operator, Peel Ports Group is investing £28 million in a new facility at the Port of Liverpool, its biggest single investment in warehousing this year.

Construction of the 240,000 square foot warehouse at the port operator’s Alexandra Dock is to begin in the coming days.

The new facility, referred to as Alexandra Dock Multi-User Warehouse (MUW), will be the length of up to five football pitches (400 metres) and used for the handling and storage of cargo at the port.

It will be able to store a variety of commodities, both unitised and non-unitised requiring indoor storage.

The facility will also have 300 metres of dedicated quayside and state-of-the-art cranes to optimise vessel discharge as part of the new development.

David Huck, Chief Operating Officer at Peel Ports Group, said: “We’re very pleased to be announcing the construction for this major purpose-built space at the Port of Liverpool.

“We’ve seen a significant increase in demand for warehousing, and this huge new facility provides an opportunity for new customers looking for capacity to grow their business, as well as allowing existing customers the chance to expand their operational capacity at the port.

“This also represents a very important milestone for Peel Ports Group, enhancing both our warehousing and distribution offerings while enabling more sustainable port-centric solutions.

“We’ve long argued the benefits of the Port of Liverpool’s central location, and this new facility will also provide real cost, carbon and congestion supply chain benefits to the market.”

The new state-of-the-art, dynamic storage facility has been maximised for storage volumes, discharge performance and fast HGV turnaround times.

The project is expected to be completed in April 2024 and the work will be carried out by leading construction company Glencar.

Commenting on the project, Peter Goodman, Managing Director – Midlands & North, said: “Working with some of the UK’s leading asset managers, developers and occupiers, Glencar has developed a market leading reputation in the delivery of industrial and logistics facilities.

“We understand the commercial imperative to produce sustainable and high-quality structures, often at speed, creating lasting value for asset owners and are delighted to be working for leading UK Port Operator Peel Ports to construct this multi-user warehouse development.

“Ports serve as a critical part of the UK Supply Chain and multi-users facilities of this type contribute towards the continuation of the import and export of vital goods. We look forward to working with the full project team progressing the project to a successful end product.”

Published in Ports & Shipping

Shipping company WEC Lines has expanded its existing service into the Port of Liverpool with a new series of weekly calls to the UK port from northern Spain, Portugal, north Africa and the Canary Islands.

The Dutch (Rotterdam based) company is operating weekly services in addition to existing Spanish and Portuguese routes since 2019 to the Merseyside port that is part of the Peel Ports Group.

The new direct weekly services from Bilbao, Vigo and Gijon in Spain, Casablanca in Morocco, Setubal and Leixoes in Portugal and Santa Cruz and Las Palmas in the Canaries commenced this month.

The services will import a range of southern European and north African products.

Roger Megann, Managing Director from WEC Lines said: “This is a significant upgrade and expansion of our service, offering our customers weekly reliability and new direct connections to and from Portugal, Spain, Canaries and north Africa to Liverpool.

“WEC Lines is committed to providing excellence in its products and customer service. Our partnership with Port of Liverpool is a key element of this development.”

David Huck, Chief Operating Officer at Peel Ports said: “We are delighted to welcome WEC Lines’ significant expansion of services into the Port of Liverpool.

“This multi-continental weekly service is a further vote of confidence in the port and the trans-shipment opportunities of these routes further expand Liverpool’s global network and reach.

“The Port of Liverpool’s unrivalled location provides significant advantages as a more efficient and closer-to-end destination option, which reduces the road miles and congestion seen at other UK ports.”

 

Published in Ports & Shipping

One of the UK's biggest ports, the Port of Liverpool is where dock workers have announced they have called off a planned strike after reaching a deal on pay.

Dockers numbering almost 600 and who are members of the union Unite at the Port of Liverpool had taken part in previous strikes. Further action was scheduled to take place on 14 November after the union said pay talks had ended in "chaos".

The port's operator, Peel Ports Group said an agreement had been reached and would be put to union members in a vote that is to take place later in the week.

Details of the dockers deal have not been released.

BBC News has more on the Merseyside port where strike action had only affected container operations.

Published in Ports & Shipping

At one of the UK’s largest container ports, dock workers in their hundreds are beginning a fresh two-week strike in a dispute over pay, which could further disrupt the country’s supply chains.

The union Unite which nearly has 600 members at the Peel Ports owned Port of Liverpool, will strike again from Monday (24 October), after the union said talks designed to resolve the dispute ended “in chaos”.

The union had accused the board of operator Peel Ports of intervening to stop a deal, which it said had been agreed in principle, from going ahead.

According to Unite’s general secretary, Sharon Graham, said the Unite team had “negotiated in good faith with Peel Ports”. “But the talks ended in farce, with the deal agreed between Unite and senior management being pulled by the board,” she said. “Strike action by our members and with the full support of Unite will go ahead.”

For more on this latest strike, The Guardian reports.

Published in Ports & Shipping

Halloween decorations, DIY materials and heavy machinery deliveries bound for Ireland could face delays as a two-week dockers’ strike at the port of Liverpool gets underway.

At least 560 workers were due to walk out of the port last night in a dispute over pay, according to the Unite trade union, just hours after Queen Elizabeth’s funeral and the end of a 10-day national mourning period.

The strike will affect the Port of Liverpool’s container division until October 3, although other operations – cruises, trailer traffic and bulk cargo – will be unaffected, the port said in a statement.

Although Liverpool does not handle time-sensitive food or other perishable goods bound for Ireland, it is a hub for goods coming in via container ship from Asia and the United States including goods destined for Irish retailers.

“Any disruption in England has a knock-on impact for Ireland,” said Aidan Flynn, chief executive of the Freight Transport Association of Ireland. “It’s like a concertina effect. Things get squeezed.” 

Independent.ie has more here on the strike on Merseyside. 

Published in Ports & Shipping

A new bridge will be part-funded by Liverpool City Council which will spend £200,000 on the project to connect Princes Dock to the new Isle of Man ferry terminal.

The Isle of Man Government says this will provide a more direct link to the city centre for ferry foot passengers than following a route along roads.

Council documents show the bridge will cost a total of £298,138.52.

Developer Liverpool Waters says the bridge will be ready for the opening of the new ferry terminal expected in June 2023.

As Manx Radio reports the development is expected to be ready when the terminal opens.

Published in Ferry

The Isle of Man Minister for Infrastructure doesn't think the ferry terminal project will cost more than already requested.

The minister doesn't believe work to the Liverpool Ferry Terminal project will cost more than has already been requested by his predecessor.

The project is expected to cost more than double what was initially requested of Tynwald.

Chris Thomas insists the June 2023 deadline is still realistic and says whilst not everything was straight forward with this project - he believes it's not right to penalise other off-Island projects in future.

ManxRadio reports including a link to the podcast with the Minister spreaking on the terminal that is to serve the route to Douglas Harbour.

Published in Ferry

Chaos outside Paris’ Stade de France at the Champions League final is leading this morning’s headlines — and among the fans in the city were a group of resourceful Liverpool supporters who travelled part of the way by speedboat.

As the Liverpool ECHO reports, Paddy O’Toole said friends’ original travel plans appeared to have been scuppered by the cancellation of their EasyJet flight to Paris for the crunch football final.

After dashing from Liverpool to London, the group managed to get on a flight from Heathrow to Jersey in the Channel Islands, where Paddy lives, but that still left them hundreds more kilometres short of the French capital.

Enter Paddy’s friend Garry Brennan, whose local business has a fleet of motor vessels including the 12-person RIB that carried the intrepid group to the French mainland on Friday (27 May) in plenty of time to join thousands of other Liverpool away fans.

The Liverpool ECHO has more on the story HERE.

Published in RIBs
Tagged under

UK ports group, Peel Ports has partnered with social enterprise Innovate Her to encourage diversity and inclusion across the organisation and promote STEM subjects to hundreds of female students across Liverpool.

The national port operator has pledged its support to the organisation after recognising that the maritime sector must become more inclusive and support greater gender diversity.

The latest collaboration is among several initiatives from Peel Ports to encourage more women into the business.

Innovate Her is a values-led social enterprise based in the North West, that aims to equip more women with the skills and confidence to pursue STEM-related careers. It specialises in delivering education and coaching to young people and has been operating since 2013.

Peel Ports has signed up to the organisation’s Impact Her package, which will see the port group attend community learning and networking events, host masterclasses in schools and virtual forums, and support up to 600 female students across Liverpool.

The announcement comes after the port group previously signed the Women in Maritime Pledge, overhauled its on-site PPE to accommodate female workers and has improved many of its employee-related procedures, including enhancing its maternity policy.

As part of the partnership, Peel Ports has already partnered with St Mary’s College in Sefton and employees from the Port of Liverpool are working with the school to promote STEM subjects to groups of students getting ready to pick their GSCE and A-level subjects in 2022.

Charlotte Havers, Senior HR Advisor at Peel Ports said: “We are aware of the gender gap that exists across the maritime sector as a whole and, while we are actively working to make the industry more inclusive for women, we recognise that there is still much work to be done.

“Partnering with like-minded organisations such as Innovate Her will help us to meet the challenges around diversity and inclusion at both a national and regional level. We aim to empower more young women with the confidence to complete STEM subjects and look forward to meeting some fantastic students, hopefully we can inspire them to consider careers in maritime.”

Mica Howarth, Marketing Manager at Innovate Her said: 'We are delighted to announce Peel Ports LTD as a partner. It's really great to see a powerhouse like them so passionate about our mission. We are very much looking forward to collaborating with Peel Ports on nourishing full career journeys of local teens, from igniting an initial flame of interest in STEM, to offering outstanding opportunities in the industry.”

Published in Ports & Shipping
Page 1 of 5

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023