Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Erne System

Waterways Ireland advises masters and owners on the Erne System that the Erne Head of the River rowing race will take place in Enniskillen on Saturday 5 March.

The event will run from noon to 3pm, with the official race start at 1.30pm, the cross-border body for Ireland’s inland waterways says.

The route will start upstream of the Killyhevlin hotel and will race through to Enniskillen Royal Grammar School boathouse, a total length of 6km.

Entries are open until 7pm on Wednesday 23 February. For more see the race’s Facebook page.

Published in Rowing

All 16 locks on the Shannon-Erne Waterway will be out of service from today, Friday 24 December to Monday 3 January inclusive.

No lock passage by boat will be possible during this period. Normal service will resume at 9am on Tuesday 4 January.

Waterways Ireland adds that the service blocks at Aghalane and Haughton's Shore are closed until Monday 14 March. The service blocks at Ballyconnell, Ballinamore, Keshcarrigan and Leitrim shall remain open.

All associated land-based and water-based Blueway trails shall remain open, the cross-border body for Ireland’s inland waterways confirms.

In other updates: on the Erne System, Bellanaleck slipway is closed until further notice, while on the Shannon Navigation, Clarendon Lock in Co Roscommon will reopen to navigation on Tuesday 4 January following works in preparation for lock gate replacement, as previously reported on Afloat.ie.

Published in Inland Waterways

Inspections and repairs will be taking place on the Erne System later this month, according to Waterways Ireland.

On Upper Lough Erne, inspection work on the underside of Lady Brooke Bridge in Co Fermanagh will begin next Monday 11 October, continuing until Friday 22 October.

Pontoons will be in used to carry out the inspections and the bridge will be partially closed off to vessels during this period.

Masters of Vessels and waterways users are also advised that Corradillar Slipway and jetty will be used for assembly of the pontoons on 11 October and for disassembling the pontoons on 22 October.

Elsewhere, on Lower Lough Erne, major works will be taking place at Portora Lock gates outside Enniskillen on Thursday 14 and Friday 15 October.

The lock gates will be closed over these two days, from 8am on the Thursday to 7pm on the Friday.

Published in Inland Waterways

Waterways Ireland confirms it has been advised by DfI Rivers in Northern Ireland that users of the Erne System can expect reducing water levels throughout the navigation from this weekend.

It follows from the planned lowering of water levels on Lower Lough Erne from this Friday 1 October to a minimum of 149 feet (above Poolbeg Ordnance datum) in anticipation of increased rain during autumn and winter, as previously reported on Afloat.ie.

If water levels do fall, masters of vessels on the inland waterways of the Erne System should be aware of the following:

  • Navigation — To reduce the risk of grounding, masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.
  • Mooring of Vessels — Masters should be aware that water levels may change rapidly and that mooring lines will require adjustment therefore these should be checked regularly.
Published in Inland Waterways

Waterways Ireland advises all masters of vessels and users of the Shannon-Erne Waterway that tree trimming and hedge cutting will be carried out at various locations on these inland waterways during the autumn/winter period from this month until next February.

During this operation, floating pontoons will be located on the water with mechanical plant operating. Plant machinery will also be in operation along the banks of the waterway.

Masters of vessels will be advised by Waterways Ireland staff when making a passage.

In addition to this, Waterways Ireland says it anticipates DfI Rivers in Northern Ireland will advise that from 1 October, in keeping with water level management protocols, users of the Erne System can expect reducing water levels throughout the navigation.

Water levels on Lower Lough Erne are drawn down annually, weather permitting, to a minimum of 149 feet (above Poolbeg Ordnance Datum) in anticipation of increased precipitation during autumn and winter.

If water levels do fall, masters should be aware of the following:

  • Navigation — To reduce the risk of grounding, masters should navigate on or near the centreline of the channel, avoid short-cutting in dog-legged channels and navigating too close to navigation markers.
  • Mooring of Vessels — Masters should be aware that water levels may change rapidly and that mooring lines will require adjustment. Therefore mooring lines should be checked regularly.
Published in Inland Waterways

Waterways Ireland has issued a number of updates for inland waterways users on the Erne System, Grand and Royal Canals and Barrow Navigation.

On the Erne System, the Galloon Bridge refurbishment project southwest of Newtownbutler will commence next Monday 23 August.

Vessels will not be permitted to navigate under the bridge at Galloon due to these works, which are expected to continue for 16 weeks.

In addition, the Carrybridge jetty and slipway will be closed for five days from Monday 23 to Friday 27 August for the realignment of jetty fingers. The electrical supply to bollards and pump-out will be turned off during this period.

On the Grand Canal, low water levels are being experienced on both the main line and Barrow Line, which are currently 300mm down on normal levels.

Masters of vessels are advised to proceed with additional caution and to contact the relevant water patroller for latest advice and assistance.

On the Royal Canal, canoe polo events will take place in the Kilcock Harbour area this Friday 20 August.

Waterways Ireland requests that the polo pitch areas and harbour be kept clear of all vessels to facilitate the events, and that masters of vessels comply with instructions from marshals.

Meanwhile, on the Barrow Navigation masters and owners are advised that Clashganny Lock is now fully operational following its temporary closure for essential repairs.

Published in Inland Waterways

Following the recent reopening of inland waterways in the Republic, Waterways Ireland has given an update for all masters of vessels and water users on the Erne System, the Shannon-Erne Waterway (within Northern Ireland) and the Lower Bann Navigation.

In line with guidance provided by the Northern Ireland Executive, from this coming Monday 10 May all service blocks will reopen on these navigations.

On the Erne System and the portion of the Shannon-Erne within Northern Ireland,, pump-out facilities are available and local area access to jetties and moorings will be available in according with NI Executive guidance. All locks will also reopen on the Shannon-Erne.

On the Lower Bann, service blocks will reopen on Wednesday 12 May, with local area access to jetties and moorings as previously noted.

Portna, Movanagher and Cutts locks will also reopen on Wednesday. However, Toome Lock remains out of operation until Friday 28 May for works, and Carnroe Lock is closed until further notes pending ongoing engineering investigations.

Waterways Ireland reminds users when on jetties to be aware of others; wait or move aside to allow others to pass at a safe distance.

“We will continually review such measures in light of direction and advice from Government and health professionals,” the cross-border body adds.

Published in Inland Waterways

Waterways Ireland advises that Portora Lock on the Erne System near Enniskillen will be closed to boat traffic on Tuesday 19 and Wednesday 20 January to accommodate essential maintenance works to the lock gates.

Masters of vessels on this inland waterway are asked to heed all instructions from safety personnel who will be in the area.

Published in Inland Waterways

A series of consultative workshops on the feasibility of an iconic Pilgrim Way between the Shannon Navigation and Erne System took place earlier this month.

In late 2018, West Limerick Resources in partnership with Waterways Ireland and 13 local development companies (LDCs) and associated local authorities commissioned SLR Consulting and Alan Hill Tourism Development to investigate the feasibility of developing a 350km cross-border Pilgrim Way along the inland waterways.

The area under consideration is a 20km-wide corridor which uncovers a unique and vast pilgrim heritage on and along the inland waterways, from the Shannon estuary in Co Kerry northwards through the Shannon Navigation, Shannon-Erne Waterway, and Erne System in Co Fermanagh to Co Donegal.

The aim is to develop an iconic international ‘Pilgrim Way’ based on the rich early Christian and Viking heritage of the Early Medieval period in Ireland.

Well known ecclesiastical sites include Scattery Island, Iniscealtra (Holy Island, Clare), Clonmacnoise (Offaly), Quaker Island (Lough Ree), Boyle Abbey (Roscommon), Devenish Island (Lough Erne) and the iconic pilgrimage site at Lough Derg (St Patrick’s) in Donegal, among others.

Many more, lesser known sites are included in the overall analysis for a total of more than 100 sites in total. Waterways Ireland has more information about the project.

Published in Inland Waterways

#InlandWaters - Waterways Ireland advises that the electricity supply to power pedestals and the supply of water to taps on public moorings on the Shannon Navigation will soon be disconnected for the winter period.

The move is being made for environmental reasons and to reduce maintenance costs. Services will be restored prior to the commencement of the 2019 boating season.

Shore power supply at the Round ‘O’ and Carrybridge public moorings on the Erne System, as well was water supply to taps throughout that system, was already disconnected or winter as of Wednesday 7 November.

Published in Inland Waterways
Page 5 of 6

Cork Harbour Information

It’s one of the largest natural harbours in the world – and those living near Cork Harbour insist that it’s also one of the most interesting.

This was the last port of call for the most famous liner in history, the Titanic, but it has been transformed into a centre for the chemical and pharmaceutical industry.

The harbour has been a working port and a strategic defensive hub for centuries, and it has been one of Ireland's major employment hubs since the early 1900s. Traditional heavy industries have waned since the late 20th century, with the likes of the closure of Irish Steel in Haulbowline and shipbuilding at Verolme. It still has major and strategic significance in energy generation, shipping and refining.

Giraffe wander along its shores, from which tens of thousands of men and women left Ireland, most of them never to return. The harbour is home to the oldest yacht club in the world, and to the Irish Navy. 

This deep waterway has also become a vital cog in the Irish economy.

‘Afloat.ie's Cork Harbour page’ is not a history page, nor is it a news focus. It’s simply an exploration of this famous waterway, its colour and its characters.

Cork Harbour Festival

Ocean to City – An Rás Mór and Cork Harbour Open Day formerly existed as two popular one-day events located at different points on Cork’s annual maritime calendar. Both event committees recognised the synergy between the two events and began to work together and share resources. In 2015, Cork Harbour Festival was launched. The festival was shaped on the open day principle, with Ocean to City – An Ras Mór as the flagship event.

Now in its sixth year, the festival has grown from strength to strength. Although the physical 2020 festival was cancelled due to Covid-19, the event normally features nine festival days starting on the first week of June. It is packed full of events; all made possible through collaboration with over 50 different event partners in Cork City, as well as 15 towns and villages along Cork Harbour. The programme grows year by year and highlights Ireland’s rich maritime heritage and culture as well as water and shore-based activities, with Ocean to City – An Rás Mór at the heart of the festival.

Taking place at the centre of Ireland’s maritime paradise, and at the gateway to Ireland’s Ancient East and the Wild Atlantic Way, Cork is perfectly positioned to deliver the largest and most engaging harbour festival in Ireland.

The Cork Harbour Festival Committee includes representatives from Cork City Council, Cork County Council, Port of Cork, UCC MaREI, RCYC, Cobh & Harbour Chamber and Meitheal Mara.

Marinas in Cork Harbour

There are six marinas in Cork Harbour. Three in Crosshaven, one in East Ferry, one in Monkstown Bay and a new facility is opening in 2020 at Cobh. Details below

Port of Cork City Marina

Location – Cork City
Contact – Harbour Masters Dept., Port of Cork Tel: +353 (0)21 4273125 or +353 (0)21 4530466 (out of office hours)

Royal Cork Yacht Club Marina

Location: Crosshaven, Co. Cork
Contact: +353 (0) 21 4831023

Crosshaven Boatyard Marina

Location: Crosshaven, Co. Cork
Contact: +353 (0)21 4831161

Salve Marina Ltd

Location: Crosshaven, Co. Cork
Contact: +353 (0) 21 4831145

Cork Harbour Marina

Location: Monkstown, Co. Cork
Contact: +353 (0)87 3669009

East Ferry Marina

Location: East Ferry, Co. Cork
Contact: +353 (0)21 4813390

New Cove Sailing Club Marina

(to be opened in 2020)

Location: Cobh, Co. Cork
Contact: 087 1178363

Cork Harbour pontoons, slipways and ramps

Cork City Boardwalk Existing pontoon

Port of Cork 100m. pontoon

Cork city – End of Cornmarket St. steps and slip;

Cork city - Proby’s Qy. Existing limited access slip

Quays Bar & Restaurant, Private pontoon and ramp for patrons, suitable for yachts, small craft town and amenities

Cobh harbour [camber] Slip and steps inside quay wall pontoon

Fota (zoo, house, gardens) Derelict pontoon and steps

Haulbowline naval basin; restricted space Naval base; restricted access;

Spike Island pier, steps; slip, pontoon and ramp

Monkstown wooden pier and steps;

Crosshaven town pier, with pontoon & steps

East Ferry Marlogue marina, Slip (Great Island side) visitors’ berths

East Ferry Existing pier and slip; restricted space East Ferry Inn (pub)
(Mainland side)

Blackrock pier and slips

Ballinacurra Quay walls (private)

Aghada pier and slip, pontoon & steps public transport links

Whitegate Slip

Passage West Pontoon

Glenbrook Cross-river ferry

Ringaskiddy Parking with slip and pontoon Ferry terminal; village 1km.

Carrigaloe pier and slip; restricted space; Cross-river ferry;

Fountainstown Slip

White’s Bay beach

Ringabella beach

Glanmire Bridge and tide restrictions

Old Glanmire - Quay