Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Milford Haven

In south Wales, the Port of Milford Haven is to host two Annual Stakeholder Meetings this year so to update members of the community on its latest developments and listen to feedback from the public.

Tom Sawyer, the Port’s new Chief Executive who joined in April, along with Chair, Chris Martin, will provide an overview on the organisation’s performance and vision, as well as updates on projects such as Pembroke Dock Marine, Milford Waterfront and its core business - servicing shipping on the Waterway.

Tom commented “I’m looking forward to meeting our stakeholders, many of whom I won’t have come across yet, in Pembroke Dock and Milford Haven. The sessions are a chance for the public to hear about what has been happening at the Port over the past year as we start to recover from the effects of Covid, but also about how our plans for future growth are progressing.”

He continued “One area I’d welcome feedback on is how we can do more to help our local community in a time when the cost of living is increasing and having a huge impact on peoples’ daily lives. We want to help where we can and understanding the extent of the problem is the first step towards addressing this.”

The events take place on:

Thursday 28th July at the Pater Hall, Pembroke Dock, 4.30-6.30pm

Friday 29th July at the Pill Social Centre, Milford Haven, 3-5pm

To register please email: [email protected] or call 01646 696100 and specify which date you would prefer, along with any questions you would like to ask the team.

There will also be an opportunity to join the meetings online (visit: www.mhpa.co.uk/ASM for more details).

Published in Ports & Shipping

Global tug provider Svitzer will strengthen it's UK fleet and emergency towing capabilities in the south Wales Port of Milford Haven with a newly reaquired tug, while freeing up another to support its London operations (see related story). 

Svitzer, which is part of the Danish giant A.P. Moller-Maersk, has announced the purchase of a Svitzer Pembroke to support (tanker story) terminal operations in Milford Haven, UK.

The addition of the Svitzer Pembroke to the UK fleet will free up the 86-tonne bollard pull ASD tug Svitzer Ramsey for relocation to London to cater for expected growth at the River Thames and River Medway.

The Svitzer Pembroke was originally built for Svitzer at Zamakona Shipyard, Spain, but in 2014 the vessel was sold, and has operated under the name Boa Odin for the past eight years. The 100-tonne bollard-pull ASD tug has both aft towing winch and firefighting capabilities. This makes the Svitzer Pembroke uniquely suited to supporting Svitzer’s Terminal activities at Milford Haven and strengthens the existing fleet’s emergency response capability.

The arrival of the Svitzer Pembroke in Milford Haven allows Svitzer to redeploy the Svitzer Ramsey to London, where escort tugs with bollard pull from 80 tonnes and upward, plus fire fighting capabilities, are becoming increasingly important for serving customers effectively on River Thames and River Medway.

Commenting on the acquisition, Kasper Karlsen, Chief Operating Officer, Svitzer Europe and interim head of Svitzer in the UK said: “With the purchase of Svitzer Pembroke, we simultaneously accomplish two key goals. Increasing our minimum 80 tonnes bollard pull fleet in London from 6 to 7 tugs allows us to better meet current and future customer demands there. At the same time, we are able to strengthen our ability to provide emergency services and towing at Milford Haven. We are very pleased to once again have Svitzer Pembroke in our fleet.”

The newly reacquired tug has already arrived in the UK and will return to service in the coming months.

Svitzer currently operates more than 70 tugs in the UK and has around 650 employees.

The UK has been the launching off point for the company’s EcoTow project, with Svitzer’s entire fleet London, Felixstowe, Southampton and Scotland switching to low carbon biofuels. The service is set to be rolled out across the remaining ports in the UK and across Svitzer’s global operations.

Published in Ports & Shipping

Port scholarships for university students from Pembrokeshire, south Wales are being encouraged for them to apply to the Port of Milford Haven’s scholarship scheme.

The annual initiative offers undergraduate students the chance to apply for an award of £1,500, as well as a work placement at the UK’s largest energy port. To be eligible, applicants must have spent the majority of their secondary education in Pembrokeshire and be enrolled on an undergraduate course at a British university.

Sitting on the judging panel this year are Chris Martin, Chair of the Port of Milford Haven; Maxine Thomas, Designated Senior Lead for Safeguarding and Learner Wellbeing at Pembrokeshire College and Jane Harries, Headteacher at Haverfordwest High VC School. Interviews will take place with the shortlisted applicants in December.

Over seventy undergraduates have been awarded scholarships by the Port in a wide range of subjects since the scheme was launched in 2003 including engineering, nutrition, law and history.

Chris Martin, Chair at the Port, is looking forward to receiving this year’s applications:

“I am delighted to be part of the panel again. The standard of applications that we receive is consistently high, so much so that we awarded five scholarships instead of the usual four last year! In addition to the financial support that’s provided, we find that the placement offers huge benefits as the students are based in a real working environment assigned to meaningful projects that will hold them in good stead for the future.”

For more information and to submit an application please visit this link here.

Published in Ports & Shipping

On Monday of last week Afloat tracked a ferry arriving in the Port of Fishguard, Wales where two cruiseships one scheduled the other totally unexpected called to the scenic north Pembrokeshire port, writes Jehan Ashmore.

The ferry Stena Nordica (deputising for 'Europe') had departed Rosslare Harbour on a routine crossing of the St. Georges Channel to the Port of Fishguard is operated by Stena Line Ports. On arrival of the ferry into Fishguard Bay was the scene involving a pair of anchored cruiseships, one within the harbour while the other was offshore of the port's breakwater.

Of the pair, Aidavita was the scheduled caller to the Welsh port which was visited by the German operated cruiseship. The 1,266 passenger ship had previously arrived in the port at around dawn having made an overnight passage through the Irish Sea from Greenock, Scotland.

As for the second surprise ship, this was Seabourn Quest which departed the Bristol Channel from Portbury. The 450 guest cruiseship however did not call to another Welsh port as intended. The port been Milford Haven located in the south of Pembrokeshire.

Instead, Afloat noted the twin funnelled cruiseship took a course along the stunning rugged Pembrokeshire National Coastal Park to include taking a passage between the mainland and Skokholm Island. In addition while en route to Fishguard, the ship past Skomer Island.

The reason for the none show of the high-end luxury cruiseship was not due to operator Seabourn Cruise Line but the Milford Haven Port Authority which operates the Port of Milford Haven. The port is the UK's largest energy port and is capable of delivering 30% of the nation's gas demand.

In response to Afloat as to the reason for Seabourn Quest none show a spokesperson for the Port of Milford Haven commented: "We were extremely disappointed that Seabourn Quest was unable to call to Milford Haven. Unlike many Ports, at Milford Haven the tugs are not contracted to the Port but to our (energy) terminal customers and, on rare occasions, this does have the potential to impact on cruise calls as it did".

The Port added "that ultimately, the terminals will decide whether to release a tug for a cruise vessel based on their shipping requirements and the Port has to accept the decisions made. While this is the first time for many years that this situation has arisen, it clearly can occur.

So what was one port's loss was a gain for a neighbouring port on either side of the Welsh west coast region.

Seabourn Quest's unexpected call to Fishguard was a welcome boost to the port and the local economy. Reception teams organised by the Fishguard Bay Welcome (Tourism Information Centre) greeted passengers and crew ashore from tenders of both Aidavita and Seabourn Quest.

A more recent visitor took place last Friday when the mini superyacht like Variety Voyager made an appearance. The diminutive cruiseship operated by Variety Cruises has a capacity for just 71 guests.

Published in Cruise Liners

#fishing - The largest fishing port in Wales, at Milford Marina has welcomed the FPV Rhodri Morgan, one of five new fisheries patrol vessels taking to the waters in 2019.

The vessel was built by local company Mainstay Marine Solutions, and was named in Cardiff Bay in December, memorialising the former First Minister Rhodri Morgan.

At 26 metres long, weighing 75 tons, the vessel carries 11,000 litres of fuel. It also has room for a 6.5 metre sea-boat. It was built, along with four other vessels, to replace the previous fleet. This fleet will patrol Welsh waters looking for illegal fishing activity.

Melanie Durney, Docks and Marina Manager, Milford Marina, commented: “As Wales’ largest fishing port, we are honoured to have the FPV Rhodri Morgan here in the marina. It is an impressive vessel, and we are pleased to see that it will be part of the fleet patrolling the Welsh fishing grounds.”

The marina which is on the Milford Haven estuary is where the Port of Milford Haven is the UK’s top energy port and Wales’ busiest port handling around 20% of Britain’s seaborne trade in oil and gas.  It is widely recognised in the industry as the energy capital of the UK in addition to a ferryport in Pembroke where Irish Ferries operate to Rosslare Harbour. 

Published in Fishing
Tagged under

#Ports&Shipping - The UK’s largest energy port, the Port of Milford Haven in south Wales, has been awarded accreditation against the Investors in People Standard, demonstrating its commitment to high performance through good people management.

The Port (this year celebrates its 60th year), employs 181 staff at all levels within the diverse range of industries it serves. As well as being well known for its role in the global oil and gas industry, the Port has a Four Gold Anchor marina, is home to the largest fishing port in Wales and is involved in the ferry (see related coverage), cruise, general cargo, renewables and tourism sectors.

Investors in People is the international standard for people management, defining what it takes to lead, support and manage people effectively to achieve sustainable results. Underpinning the Standard is the Investors in People framework, reflecting the latest workplace trends, essential skills and effective structures required to outperform in any industry. Investors in People enables organisations to benchmark against the best in the business on an international scale.

Paul Devoy, Head of Investors in People, said: “We’d like to congratulate the Port of Milford Haven; Investors in People accreditation is the sign of a great employer, an outperforming place to work and a clear commitment to success. The Port should be extremely proud of their achievement.”

Commenting on the award Vidette Swales, HR Director at the Port of Milford Haven, said “We dedicate a great deal of time and effort to ensuring we provide a safe yet dynamic environment to work in. Employees are encouraged to embrace our core values of safety, collaboration and excellence in everything that they do and many take this to another level by regularly going the extra mile and getting involved in various committees and events. We are pleased to have retained IIP accreditation since 2004 – made possible by the passion and commitment shown by staff on a daily basis.”

For more information about Investors in People please visit: www.investorsinpeople.com

Published in Ports & Shipping
At 08.21 am, the FV 'About Time' which is an under 15 metre registered FV which operates out of Milford Haven called Coastguard on Channel 16 to report that he had lost a crewman.

There was three crew onboard and they had finished fishing and were heading back to Milford. One of the crewmen was determined to be missing one hour after being last seen by the other two crew.

The fisherman, who was of Latvian origin, was not wearing a life jacket.

Milford Haven MRCC initiated a mayday relay broadcast to secure any assistance from other vessels that may be in the immediate area.

They called out Coastguard rescue teams from Dale and Broad Haven and requested the launch of Angle and St David's RNLI lifeboats and inshore lifeboat. A rescue helicopter was also requested.

A search has been undertaken today by these SAR units and fourteen other vessels of different types. The search has now been terminated.

Nigel Yelland, Watch Manager, Milford Haven, said:

An extensive search has been undertaken by many vessels in the hope of finding this missing fisherman. Unfortunately, he was not wearing a lifejacket, which could have aided in his survivability in this incident.

Published in Coastguard
Tagged under
The New Ross based replica famine sailing barque Dunbrody opened yesterday to visitors for the first time this year after completion of a refit, writes Jehan Ashmore.
Since November the 458-tonnes barque (see photo) has been under maintenance in the dry-dock at the New Ross Boat Yard. On Saturday morning she was eased out of the dry-dock and was moored opposite on the far bank of the River Barrow at the Marshmeadows berth. It was not until yesterday morning that she made the short distance upriver to return to her County Wexford 'homeport'.

A grant of €1m from Fáilte Ireland was allocated towards the cost of the refit as part of the National Development Plan (NDP). Visitors can now take guided tours of the floating tourist attraction though access to the shoreside visitor centre remains closed due to an upgrade. Work on an extension of a new exhibition centre is expected to be completed in May or June.

Dunbrody is a full scale reconstruction of the 19th century replica famine-ship based on the vessel built in 1845 in Quebec, Canada for the Graves family of New Ross. Ireland's most inland port being made famous with the visit of President John F. Kennedy in 1963 to the same quayside where Dunbrody is berthed.

To date the Dunbrody's presence outside her homeport has been scarce. During the Waterford Tall Ships Festival in 2005 she took part in a memorable and historic 'Parade of Sail' where she formed as part of the trio of Irish tall ships that met together for the only time. The sailing spectacle of the international fleet was headed firstly by the Irish trio with Asgard II leading followed by Dunbrody and astern the Jeanie Johnston.

In the following year Dunbrody made her maiden and only international voyage to Milford Haven in south Wales. The Pembrokeshire estuary had hosted the new festival, Seafair Haven. On that occasion she had the honour of leading another parade of sail, under the command of Captain Tom McCarthy.

Dunbrody was last dry-docked in 2006 and also at the New Ross boatyard which lies on the Co. Kilkenny side of the riverbank. The 176 foot / 54 metre barque was built in 2001 and was last vessel completed at the boatyard. During her building the public could access the yard and the construction process could be viewed from above at a gallery set within the covered building hall.

The structure no longer exists but which was built originally for the Ross Company boatyard during the 1970's. The yard specialised in building barge pontoons for markets in the North Sea until the premises closed in the 1980's. In recent years and under new management the dry-dock (75m X 15m) has been upgraded with a new gate and pump.

Looking for further reading on Tall Ships in Ireland? Click the links below:

Click this link to read all our Tall Ships Stories on one handy page


Previewing Ireland's Tall Ships 2011 Season


Can Ireland Get a New Tall Ship?

Published in Tall Ships
4th November 2010

Woman Airlifted to Cliff Top

Earlier this afternoon Milford Haven Coastguard were alerted by local Police to an unfolding incident at Lydstep beach in Pembrokeshire, Wales involving a woman and two children.

The woman who is not local to the area was walking with her 10 and 17 year old sons and had climbed some rocks near the caravan park but had become stuck. The children had managed to scramble to the top of the cliffs and raise the alarm. They were unable to help their mother.

The weather this afternoon has been south westerly winds force 5 – 7 with occasional rain with low visibility.

The Tenby Coastguard Rescue Team which has a cliff capability, and Tenby RNLI all weather lifeboat with its 'Y' boat was asked to turn out, and the Coastguard Sector Manager for Pembroke also attended. The RNLI inshore lifeboat was also launched.

Due to the prevailing weather and surf conditions a rescue helicopter – Rescue 169 - from RAF Chivenor was also scrambled.

Bob Peel, Coastguard Watch manager at Milford haven Coastguard said

"Once the woman's location had been determined and a Coastguard lowered to her on the rocks it was agreed amongst all the rescuing parties that with the 2 lifeboat crewmen and 1 cliff man from the Coastguard with the woman, it was probably too dangerous to evacuate everyone by boat.

"There is dense gorse and blackthorn at the top of the cliff is and it would have proved difficult to recover her safely for the cliff team, so the rescue helicopter was requested.  By 4.00 pm the helicopter crew were winching the female and Coastguard up from the base of the cliff whilst the two crewmen returned to the all weather lifeboat by their Y boat. The woman was cold and shaken and had no need of medical attention.

"This is a salutary lesson in making sure that if you are in unknown terrain without the suitable climbing gear please don't attempt slippery cliff and rock faces, as inevitably rocky terrain can catch the unprepared out very quickly."

Published in Coastguard

I am aware that a number of groups are examining the possibility of launching a national sail training programme. I wonder if Waterford could be the place to lead it and be the base for national sail training. The marine sector suffers from the neglect and disregard of a disinterested Government so any revival will have to be outside of State support.

Waterford staged a hugely successful visit of the Tall Ships Race in 2005 and has been honoured with the hosting of the Race start next year. Bertie Ahern as Taoiseach snubbed the Race visit in 2005. It showed how little respect he had for the maritime sector. Half-a-million people visited the city, but Bertie couldn't be bothered to do so.

The city has been encouraging young people to get experience of crewing aboard Tall Ships. Twenty-year-old David Murray, a business information systems student at University College Cork, is becoming a sail training "veteran" through experience gained over the past two years.

He first 'shipped out' last year aboard the Tenacious operated by the Jubilee Sailing Trust of the UK, a registered charity which also operates the Lord Nelson. His first voyage, following which he sailed the north coast of Scotland on the Lord Nelson and this year became a Bosun's Mate, taking more responsibility aboard the Nelson on a voyage from Southampton to Glasgow. Then he joined the Dutch three-masted schooner, Eendracht, from Kristiansand in Norway to Hartlepool in the UK, where he disembarked and re-joined the Tenacious, again as Bosun's Mate, sailing to Bruges in Belgium and onto London. A few days later he was back aboard the Lord Nelson as Bosun's Mate from Falmouth to Milford Haven in Wales and then to Waterford, from where the Tall Ships Race will start next year,

"It's been a brilliant experience. I've met a great mix of people. Sail training is for everyone," he said. "It's been a very busy but great couple of summers with Tall Ships and I'm really looking forward to next year, especially with Waterford again hosting the fleet and crews from around the world coming to the city. I strongly recommend sail training and the fact that the races start from Waterford next summer makes it even easier for Irish young people to get involved."

DAVID_MURRAY

David Murray is a Tall Ships veteran at the age of 20

David comes from Butlerstown in Waterford. His pleasure in the experience of tall ship sailing underlines what has been lost by the shameful behaviour of the Government in closing down the sail training programme.

It will be a national disgrace if there is not an Irish tall ship flying the Tricolour at next year's Tall Ships Race start in Waterford. The city has done magnificent work in putting Ireland to the forefront in the world of tall ships. Perhaps Waterford should be the base for the creation of a new national sail training system.


• This article is reprinted by permission of the EVENING ECHO of Cork where Tom MacSweeney writes maritime columns twice weekly. Evening Echo website: www.eecho.ie

Published in Island Nation

About Dublin Port 

Dublin Port is Ireland’s largest and busiest port with approximately 17,000 vessel movements per year. As well as being the country’s largest port, Dublin Port has the highest rate of growth and, in the seven years to 2019, total cargo volumes grew by 36.1%.

The vision of Dublin Port Company is to have the required capacity to service the needs of its customers and the wider economy safely, efficiently and sustainably. Dublin Port will integrate with the City by enhancing the natural and built environments. The Port is being developed in line with Masterplan 2040.

Dublin Port Company is currently investing about €277 million on its Alexandra Basin Redevelopment (ABR), which is due to be complete by 2021. The redevelopment will improve the port's capacity for large ships by deepening and lengthening 3km of its 7km of berths. The ABR is part of a €1bn capital programme up to 2028, which will also include initial work on the Dublin Port’s MP2 Project - a major capital development project proposal for works within the existing port lands in the northeastern part of the port.

Dublin Port has also recently secured planning approval for the development of the next phase of its inland port near Dublin Airport. The latest stage of the inland port will include a site with the capacity to store more than 2,000 shipping containers and infrastructures such as an ESB substation, an office building and gantry crane.

Dublin Port Company recently submitted a planning application for a €320 million project that aims to provide significant additional capacity at the facility within the port in order to cope with increases in trade up to 2040. The scheme will see a new roll-on/roll-off jetty built to handle ferries of up to 240 metres in length, as well as the redevelopment of an oil berth into a deep-water container berth.

Dublin Port FAQ

Dublin was little more than a monastic settlement until the Norse invasion in the 8th and 9th centuries when they selected the Liffey Estuary as their point of entry to the country as it provided relatively easy access to the central plains of Ireland. Trading with England and Europe followed which required port facilities, so the development of Dublin Port is inextricably linked to the development of Dublin City, so it is fair to say the origins of the Port go back over one thousand years. As a result, the modern organisation Dublin Port has a long and remarkable history, dating back over 300 years from 1707.

The original Port of Dublin was situated upriver, a few miles from its current location near the modern Civic Offices at Wood Quay and close to Christchurch Cathedral. The Port remained close to that area until the new Custom House opened in the 1790s. In medieval times Dublin shipped cattle hides to Britain and the continent, and the returning ships carried wine, pottery and other goods.

510 acres. The modern Dublin Port is located either side of the River Liffey, out to its mouth. On the north side of the river, the central part (205 hectares or 510 acres) of the Port lies at the end of East Wall and North Wall, from Alexandra Quay.

Dublin Port Company is a State-owned commercial company responsible for operating and developing Dublin Port.

Dublin Port Company is a self-financing, and profitable private limited company wholly-owned by the State, whose business is to manage Dublin Port, Ireland's premier Port. Established as a corporate entity in 1997, Dublin Port Company is responsible for the management, control, operation and development of the Port.

Captain William Bligh (of Mutiny of the Bounty fame) was a visitor to Dublin in 1800, and his visit to the capital had a lasting effect on the Port. Bligh's study of the currents in Dublin Bay provided the basis for the construction of the North Wall. This undertaking led to the growth of Bull Island to its present size.

Yes. Dublin Port is the largest freight and passenger port in Ireland. It handles almost 50% of all trade in the Republic of Ireland.

All cargo handling activities being carried out by private sector companies operating in intensely competitive markets within the Port. Dublin Port Company provides world-class facilities, services, accommodation and lands in the harbour for ships, goods and passengers.

Eamonn O'Reilly is the Dublin Port Chief Executive.

Capt. Michael McKenna is the Dublin Port Harbour Master

In 2019, 1,949,229 people came through the Port.

In 2019, there were 158 cruise liner visits.

In 2019, 9.4 million gross tonnes of exports were handled by Dublin Port.

In 2019, there were 7,898 ship arrivals.

In 2019, there was a gross tonnage of 38.1 million.

In 2019, there were 559,506 tourist vehicles.

There were 98,897 lorries in 2019

Boats can navigate the River Liffey into Dublin by using the navigational guidelines. Find the guidelines on this page here.

VHF channel 12. Commercial vessels using Dublin Port or Dun Laoghaire Port typically have a qualified pilot or certified master with proven local knowledge on board. They "listen out" on VHF channel 12 when in Dublin Port's jurisdiction.

A Dublin Bay webcam showing the south of the Bay at Dun Laoghaire and a distant view of Dublin Port Shipping is here
Dublin Port is creating a distributed museum on its lands in Dublin City.
 A Liffey Tolka Project cycle and pedestrian way is the key to link the elements of this distributed museum together.  The distributed museum starts at the Diving Bell and, over the course of 6.3km, will give Dubliners a real sense of the City, the Port and the Bay.  For visitors, it will be a unique eye-opening stroll and vista through and alongside one of Europe’s busiest ports:  Diving Bell along Sir John Rogerson’s Quay over the Samuel Beckett Bridge, past the Scherzer Bridge and down the North Wall Quay campshire to Berth 18 - 1.2 km.   Liffey Tolka Project - Tree-lined pedestrian and cycle route between the River Liffey and the Tolka Estuary - 1.4 km with a 300-metre spur along Alexandra Road to The Pumphouse (to be completed by Q1 2021) and another 200 metres to The Flour Mill.   Tolka Estuary Greenway - Construction of Phase 1 (1.9 km) starts in December 2020 and will be completed by Spring 2022.  Phase 2 (1.3 km) will be delivered within the following five years.  The Pumphouse is a heritage zone being created as part of the Alexandra Basin Redevelopment Project.  The first phase of 1.6 acres will be completed in early 2021 and will include historical port equipment and buildings and a large open space for exhibitions and performances.  It will be expanded in a subsequent phase to incorporate the Victorian Graving Dock No. 1 which will be excavated and revealed. 
 The largest component of the distributed museum will be The Flour Mill.  This involves the redevelopment of the former Odlums Flour Mill on Alexandra Road based on a masterplan completed by Grafton Architects to provide a mix of port operational uses, a National Maritime Archive, two 300 seat performance venues, working and studio spaces for artists and exhibition spaces.   The Flour Mill will be developed in stages over the remaining twenty years of Masterplan 2040 alongside major port infrastructure projects.

Source: Dublin Port Company ©Afloat 2020.