Menu

Ireland's sailing, boating & maritime magazine

Displaying items by tag: Inis Ealga Marine Energy Park

Volunteer coastal cleaners in East Cork have gained the support of the joint venture behind a new proposed offshore wind farm project to boost their efforts in tackling the scourge of marine litter on the Irish coast.

As the Irish Examiner reports, Clean Coasts Ballynamona have inked a sponsorship deal with the Inis Ealga Marine Energy Park which will enable them to purchase a boat and other equipment to expand their abilities to clean and protect some 80km of coastline.

Clean Coasts Ballynamon comprise more than 300 volunteers who do regular beach cleans — and also manage 34 acres of coastal habitat to promote biodiversity in East Cork.

The Irish Examiner has more on the story HERE.

Published in Coastal Notes

DP Energy Ireland Ltd is undertaking geophysical surveys at the proposed Inis Ealga Marine Energy Park off Cork and Waterford, outside the 12-nautical-mile limit.

Works were set to begin on Friday 2 September and last for five days, subject to weather, carried out from the ILV Granuaile (callsign EIPT) on a 24-hour basis.

The reconnaissance geophysical survey is being performed using a hull-mounted multibeam echosounder (MBES) and towed seismic system (maximum towed length 60m), running widely spaced lines across the array investigation area.

Communication on marine band radio VHF Channel 16 will be conducted with other ships and vessels to notify them of the operations.

In addition, ILV Granuaile is restricted in its ability to manoeuvre during this operations and will display appropriate shapes and lights. All other vessels operating within this area are requested to keep their distance and pass at a minimum speed to reduce vessel wash.

Coordinates and a map of the survey area as well as contact details are included in Marine Notice No 60 of 2022, attached below.

DP Energy, one of Ireland’s leading developers of renewable energy projects, is planning to carry out a geophysical survey beyond the 12 nautical mile limit at their proposed Inis Ealga Marine Energy Park off the coasts of Cork and Waterford.

The survey, which will cover approximately 900 Km2, will begin on 8th September and will take place for a period of five days. The work will be undertaken by Hydrographic Surveys of Crosshaven onboard the Commissioners of Irish Lights vessel, ILV Granuaile, a multifunctional ship which is equipped to operate in difficult sea conditions.

The Inis Ealga Marine Energy Park is a 1,000 MW (1GW) offshore wind project which will use floating platform technology anchored to the seabed. Once operational, the proposed wind farm will generate enough clean renewable energy to power the equivalent of nearly one million homes. Delivery of this scheme, planned to be operational by 2030, will significantly contribute to Ireland’s Climate Action Plan target of 7 Gigawatts of offshore wind energy by 2030 and the longer-term target of net-zero emissions by 2050.

To develop the Inis Ealga Marine Energy Park project, DP Energy has partnered with global energy leader Iberdrola, one of the world’s largest renewable energy producers. Iberdrola has substantial experience in offshore wind development and, importantly, shares DP Energy’s commitment to a sustainable and ethical approach to development.

The upcoming survey of the Inis Ealga Marine Park location will provide valuable information on the make-up of the seabed and this will be used to inform the project design, siting of turbines and construction methods for the proposed park. The results will also assist in the preparation of specifications for additional future geophysical and geotechnical surveys.

Adam Cronin, Head of Offshore at DP Energy, outlines the processes that will be used:

“The equipment we are planning to use includes a hull mounted multibeam sonar and sub bottom profiler. This survey will provide information about the seabed make-up at various depths. We will be able to image the sediment and rock layers beneath the surface of the seabed giving us crucial information on sediment layers for design. The data obtained from the surveys will be utilised in the design of the project and the design will be in the public domain as part of the Development Consenting process.”

Commenting on the announcement Dave Ward, Commercial Manager at Commissioner of Irish Lights said: “Granuaile is a key asset of Irish Lights in delivery of its navigation safety service around the coast of Ireland. Irish Lights can provide a range of services, statutory and commercial to support local partners in the transition to offshore renewable energy. We are pleased to support DP Energy to enable and harness Irish natural resources in offshore wind, in order to drive the establishment of an indigenous Irish supply chain while underpinning marine based employment.”

Headquartered in Buttevant in North Cork and operating across the world, DP Energy is committed to using the most sustainable and environmentally responsible methods in all of their energy developments. Currently, DP Energy has a 5,000+ megawatt (MW) portfolio of wind, ocean and solar energy projects in development stages across Ireland, Australia, the UK and Canada.

In addition to the Inis Ealga project, DP Energy, in conjunction with Iberdrola, has also submitted Foreshore Licence applications for Clarus Offshore Wind Farm, off the coasts of Clare and Kerry (floating) and Shelmalere Offshore Wind Farm, off the coasts of Wicklow and Wexford (fixed).

Published in Power From the Sea

National Watersports Campus, Dun Laoghaire

Dun Laoghaire Harbour Stakeholders combined forces in 2019 to promote a project to improve the Harbour’s infrastructure resulting in improved access, job creation and greater tourism potential. 

A grant application to government made by Dun Laoghaire Rathdown County Council (DLRCoCo) assisted by stakeholders was successful with the announcement of a €400k feasibility study grant from the Large Scale Sport Infrastructure Fund (LSSIF) in January 2020.

It meant plans for the €8m National Watersports Campus at Dun Laoghaire Harbour got the green light from Government and came a step closer to reality.

The project recognises deficits in the current set up in the harbour, proposing the construction of an all-tide publicly-accessible slipway (none currently in the Greater Dublin Area) as well as a marine services facility, providing a much-needed home for the supporting industry. 

The campus also seeks to provide a marketing framework to make boating more accessible to the general public.

The benefits of such an increase might be obvious for the Dun Laoghaire waterfront but there are other spin-offs for the harbour town in the creation of the sort of jobs that cannot be shipped abroad.

Centre for Community Watersports activity and public slipway

  • High-Performance coaching centre
  • Flexible Event Space for hosting national and international events
  • Multipurpose Building
  • Campus Marketing and Promotional Centre
  • Accommodation for Irish Sailing and Irish Underwater Council
  • Shared NGB Facility
  • Education Centre for schools, community groups and clubs
  • Proposed site – Carlisle Pier

Watersports Campus FAQs

Similar to the National Sports Campus in Abbotstown, the watersports campus will provide quality, public, recreational and high-performance facilities for the many watersports participants. The Campus will considerably enhance the services currently provided by more than 30 clubs and activity centres to over 50,000 annual users of the harbour.

The passing of control of the harbour to DLRCC, the public appetite for a community benefitting project and the capital funding for sports infrastructure in the Project 2040 National Plan have aligned to create an opportunity to deliver this proposal.

Dun Laoghaire Rathdown County Council (DLRCC) and the Irish Sailing Association (Irish Sailing) are the project leads, endorsed by the National Governing Bodies of other Irish watersports and clubs and activity providers.

The National Sports Policy, published in 2018, established the Large Scale Sport Infrastructure Fund (LSSIF) to provide Exchequer support for sports facility projects. In some cases, these may be projects where the primary objective will be to increase active participation in sport. In other cases, these may be venues where the focus is more related to high-performance sport.

Government has allocated at least €100m over the term to 2027 to successful applicant projects.

The Watersports Campus was one of seven successful applicants for Stream 1 funding allowing planning to commence on the project design and feasibility. €442,000 has been granted in this phase.

NThe project will provide for a municipally-owned public access facility to include a small craft slipway that is accessible at all stages of the tide (currently none in public ownership in the greater Dublin area), storage and lock-up resources, watersports event management space, a high-performance centre and NGB accommodation.

The project aims to enhance the profile of Dun Laoghaire as a major international venue for maritime events, shows and conferences. Establish Dun Laoghaire as the 'go-to place' for anything marine – generating revenues Create employment in the county - attract businesses, visitors and events. Grow the market for watersports Promote the services of activity providers to the public. Complement the plan to develop Dun Laoghaire as a 'destination.'

As of January 1 2021, The Department of Transport, Tourism and Sport has approved the applicant project and DLRCC are expected to appoint a team to further advance the project.

©Afloat 2020