Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: Dublin Port

Dublin Port and the Embassy of Argentina in Dublin have welcomed one of the world’s largest Tall Ships, the 340-foot-long Libertad, on a two-day visit to Dublin. She is berthed at Berth 18, next to the 3Arena, and will be open to the public, free of charge, on Saturday 30th July, from 2 pm to 6 pm.

The Libertad last visited Dublin in November 2019 and is the first tall ship to be open to the public since before the pandemic.

Libertad lifts her anchor on Dublin Bay and heads into the Port for a two day visitLibertad lifts her anchor on Dublin Bay and heads into the Port for a two day visit Photo: Robbie Reynolds

Having arrived from Baltimore, USA, the Libertad will leave for Saint Malo, France, as part of its 149-day training voyage to 11 ports across nine countries (Brazil, Santa Lucia, Dominican Republic, Cuba, Mexico, USA, Ireland, France and Spain). Sailing with the crew are four Irish volunteers from the Atlantic Youth Trust. The volunteers boarded while the Libertad was anchored in Killala Bay and they have travelled with the ship to Dublin.

Libertad on the Liffey - the Libertad on the Liffey - This magnificent 340ft tall ship opens to the public to visit, free of charge on Saturday, 30th July 2022 from 2-6pm Photo: Robbie Reynolds

Led by Commanding Officer Captain Carlos Schavinsky Trinchero, the Libertad is the Argentinian Navy’s sail training ship and travels around the world carrying a message of goodwill. This will be the Libertad’s tenth visit to Irish waters since her maiden call in 1968. She subsequently visited the capital in 2012 as part of the Tall Ships festival and again in 2016 as part of her “bicentennial journey” to mark 200 years of Argentinian independence. This trip will include a trip to Foxford in Co. Mayo, the birthplace of Admiral William Brown, founder of the Argentinian Navy, to mark the 245th anniversary of his birth.

One of the world’s largest and fastest tall ships, the Libertad, arrived in the capital for a visit as part of the Argentinian Navy’s training voyage around the worldOne of the world’s largest and fastest tall ships, the Libertad, arrived in the capital for a visit as part of the Argentinian Navy’s training voyage around the world Photo: Robbie Reynolds

Members of the public visiting the ship on Saturday will be able to get a closer insight into life on board for the 289-strong crew and inspect the fine craftsmanship of the vessel.

Commenting on the tall ship’s visit, The Ambassador of Argentina to Ireland, Moira Wilkinson said; “This is a very poignant visit for everyone in our embassy, following the passing of my predecessor, Laura Bernal who passed away in 2020. For 75 years, Argentina and Ireland have enjoyed excellent diplomatic relations built on a shared sense of history and a mutual desire to strengthen our cultural, academic and trading ties. The arrival of the Libertad reminds us of the deep connection that exists between our two nations and symbolises the hand of friendship from Argentina to Ireland, and it is fantastic to begin another chapter of Argentinian-Irish relations. For most of the cadets on board, it will be their first visit to Ireland, which means it is a special opportunity to visit the birthplace of Admiral Brown and pay tribute to his service to Argentina and the Argentinian navy.”

Encouraging members of the public to visit over the weekend, Eamonn O’Reilly, Chief Executive, Dublin Port Company, said; “Dublin Port welcomes the Libertad on her first visit to Irish shores since before the pandemic. The Libertad is a magnificent vessel and one of the finest tall ships at sea. I would encourage people in the city to take a trip to Berth 18 and visit the ship over the weekend. Argentina’s naval history has deep roots in Ireland and the Libertad’s visit provides the public with a unique opportunity to learn more about this fascinating piece of history.”

Moored at Berth 18, Dublin 2, just east of the 3Arena and the Tom Clarke Bridge, members of the public can hop on board and inspect this majestic vessel up close with 289 crew on board.  Pic. Robbie ReynoldsMoored at Berth 18, Dublin 2, just east of the 3Arena and the Tom Clarke Bridge, members of the public can hop on board and inspect this majestic vessel up close with 289 crew on board.  Photo: Robbie Reynolds

Built in the Rio Santiago shipyards in Buenos Aires, the Libertad was launched in May 1956. In 1966, she set a record for the fasting crossing of the North Atlantic using only sail propulsion (with a time of eight days and 12 hours) between Cape Race, Canada and the English Channel – a record that still stands today.

Published in Tall Ships
Tagged under

Dublin Port Company has today, in co-operation with all seven unitised terminal operators at Dublin Port, launched a new port-wide safety initiative called Dublin SafePort.

The seven participating terminal operators are Dublin Ferryport Terminals, Doyle Shipping Group, Irish Ferries, P&O Ferries, Peel Ports Group (MTL), Seatruck Ferries and Stena Line. Together, they account for an estimated 75% of port workers on the estate.

The purpose of the initiative is to support and foster an enhanced safety culture among port workers which will see Dublin Port Company and the seven terminal operators increase their collaboration on standardising safety practices across the 260-hectare estate. 

New Road Safety Campaign in Dublin Port

A key part of Dublin SafePort is the roll out of ongoing safety awareness campaigns to promote a safer working port for all. The first kicks off today to promote road safety in Dublin Port. As part of the campaign, DPC teams will be on the ground to engage with road users on driver behaviour, safety etiquette, speed limits and significant changes to the port’s internal road network following major upgrade works.

A map of the new internal road network showing traffic flows, speed limits and other essential driver information has been launched today as part of the campaign and will be made available to port users including the thousands of HGV drivers who move through the port weekly.

Road Safety Authority Shuttle Bus Visit

Today also sees Dublin Port host the Road Safety Authority (RSA)’s Shuttle Bus, giving port workers a chance to interact with the campaign. On board the Shuttle, port workers can practice their driving and hazard perception skills in state-of-the-art simulators; experience first-hand the dangers of driving and texting and driver fatigue; and try out the brake reaction timer to see how driving environments and speed affect braking distances and learn about tyre safety.

New Internal Road Network – Main Works Complete

The focus on road safety follows completion of the main phase of Dublin Port’s internal roads project to upgrade and reconfigure the port’s internal road network. This includes the creation and upgrade of nearly four kilometres of road within the north port area, as well as major improvements to key junctions to increase capacity and flexibility of use, improving the existing network in advance of predicted increases in cargo traffic. Improved routes for cyclists and pedestrians are also being provided as part of the roads projects with an objective of having active travel needs fully met throughout the north port area by the end of next year.

The latest trade figures show Dublin Port volumes have returned to the record levels achieved in 2019 pre-pandemic and pre-Brexit.

The investment in roads, in active travel and the launch of Dublin SafePort are important steps in the safe development of Dublin Port in line with Masterplan 2040.

New Unified Ferry Terminal & 20km/h Speed Limits

Coinciding with the road safety campaign, a new 20km/h speed limit now applies at Dublin Port’s new Unified Ferry Terminal (UFT) which has recently come into use, replacing the previous system of separate entry and check-in points for vehicles boarding the Irish Ferries and Stena Line ferries. This is in addition to the 20km/h speed limit already applicable in the Common User Areas, some of the busiest and most densely populated parts of the port. DPC teams will be engaging with drivers on the 20km/h speed limits in both areas over the coming months to promote awareness and adherence.

Commenting on the launch of Dublin SafePort, Eamonn O’Reilly, Chief Executive of Dublin Port Company, said; “A port-wide safety culture is essential in a port as busy as Dublin"

“Today’s launch of Dublin SafePort is the result of extensive collaboration and alignment with all seven unitised terminal operators to ensure Dublin Port is a safe port for all who work and visit. By working together, we have created a single, unifying safety initiative that enhances port safety culture and practice for the long term.

“Now that the main works on our internal road network are complete, it’s time to kickstart our first campaign with a spotlight on road safety at Dublin Port this summer. We’ll be working with all port users ashore and afloat and supporting HGV drivers to understand the new internal road network.

“We are grateful for the support of key stakeholders, including An Garda Síochána, the Road Safety Authority and the HSA as this campaign gets underway. We look forward to working together as one team under Dublin SafePort.”

Published in Dublin Port
Tagged under

During its 1,200 and more years of active trading, the Port of Dublin has successfully emerged from many adversities to maintain its role as Ireland's premier trading hub. Despite all the international frustrations to smooth trade and the pandemic problems in everyday commerce in recent years, Chief Executive Eamonn O'Reilly reports this morning that trade volumes have almost recovered to pre-pandemic and pre-Brexit levels

Overall port volumes for the first six months of the year grew by +10.1% to 18.6 million gross tonnes and the number of ship arrivals increased by +150 to 3,694 versus the same period last year. The increase is a result of two strong performing quarters, with volumes up +13.7% in Q1 2022 and +7.0% in Q2 2022.

Four-fifths of Dublin Port’s cargo volumes are in the Ro-Ro and Lo-Lo modes and the number of trailers and containers that passed through Dublin Port in the first half of 2022 increased year-on-year by +7.6% to 742,000.

Compared to the first half of 2019, trailer and container volumes are only 5,700 or -0.8% lower than they were pre-pandemic and pre-Brexit. For context, the following figures have been compared to the first six months of 2019 to provide a clearer picture of the trends emerging post-pandemic and post-Brexit, with 2019 the busiest year on record for trade at Dublin Port.

Bulk commodity volumes increased by +20.0% to 3.5 million tonnes and, within this, petroleum imports increased by +25.6% to 2.3 million tonnes. At this level, petroleum imports are +4.3% higher than they were in the first half of 2019.

Similarly, Bulk Solid volumes (mainly animal feed) grew by +10.7% to 1.1 million tonnes and are +6.5% ahead of 2019 levels.

Trade vehicle imports declined by -3.6% to 47,000 in the first half of 2022 and are -23.7% behind the levels of 2019 due to the impact of the loss of lands given over to State services for border control facilities post Brexit.

Ferry traffic volumes recovered strongly during the first half of 2022 with passenger numbers more than doubling to 671,000 and tourist vehicle numbers more than trebling to 196,000.

However, compared to 2019, passenger numbers are -18.7% behind and tourist vehicle numbers are -15.9% lower than they were three years ago.

Commenting on the H1 2022 figures, Dublin Port’s Chief Executive, Eamonn O’Reilly, said:

“The first half trading results this year are the first opportunity for us to assess trends in Dublin Port’s volumes after two years of disruption caused by the pandemic and Brexit and what we are seeing is a return of the strong volume growth which has characterised Dublin Port for decades. This is driven by population growth as confirmed in the recent census. More people means more trade and more trade means greater volumes through Dublin Port.

“While overall port tonnages are -3.7% behind where they were in 2019, the number of containers and trailers passing through Dublin Port is less than one per cent behind. Additionally, bulk commodity imports such as petroleum and animal feed grew strongly in the first six months of the year and are actually ahead of their 2019 levels by +5.7%.

“The pattern we saw post-Brexit where the average cargo load per container and trailer reduced by -4.2% is now an established reality. It is a permanent inefficiency in logistics supply chains caused by the reintroduction of border controls on imports into Ireland from the UK. This is putting greater pressure on port lands as trade volumes climb back to record levels.

“We were fortunate that the investments we had been making under Masterplan 2040 in recent years gave Dublin Port the capacity it needed to cater for the large switch in volumes from Great Britain to Continental Europe. We have invested €500 million over the last ten years and will invest a further €500 million in the next five years alone to keep pace with the growth we are anticipating now that the long-run growth trends we have seen over many decades have re-established themselves.

“We have multiple planning consents in place already and are preparing to bring the third and final Masterplan project – the 3FM Project – to An Bord Pleanála next year to ensure that Dublin Port can develop the critical national infrastructure that will be needed on the Poolbeg Peninsula if a national port capacity deficit is to be avoided in the next decade. Big infrastructure takes a long time to plan and we have, as a matter of policy, always started early.”

H1 2022 Trade Results

H1 2022 Trade Results

Published in Dublin Port
Tagged under

Brexit has been a significant driver of change for Dublin Port as an increase in direct trade with the continent has accelerated the need for offsite capacity.

Dublin Port Company’s head of property Cormac Kennedy spoke to Independent.ie about this new direction focused on the development of the Dublin Inland Port at Kilshane Cross, close to Dublin Airport.

As previously reported on Afloat.ie, the two-phase project is intended to serve as a container depot that will free up space at the main port for expanded core usage — in particular unaccompanied Lo/Lo traffic bypassing the UK land bridge to European ports.

Kennedy says the first phase as been so busy that Dublin Port Company is ramping up its leasing plans to fill more of its approximately 22-hectare capacity — with 3.2 hectares of yard space expected to become available early next year.

“The port will reach its maximum capacity of 77 million tonnes throughput per annum by 2040,” Kennedy said, “and servicing that will require maximising the capacity of the port.”

Independent.ie has more on the story HERE.

Published in Dublin Port

The Lord Mayor of Dublin, Alison Gilliland, took to the waters of Dublin Bay to take part in the annual ‘Casting of the Spear’ ceremony, the first time the tradition has been observed since before the pandemic.

The ‘Casting of the Spear’ is a tradition dating back 531 years for the incumbent Lord Mayor, who becomes Honorary Admiral of Dublin Port. The title of Honorary Admiral of Dublin Port has been bestowed on the Lord Mayor of Dublin for over 20 years.

Historical records show that the maritime tradition of the Casting the Spear dates back to 1488 when Thomas Mayler, who was then Lord Mayor of Dublin, rode out on horseback and cast a spear as far as he could into the sea – this was to mark the city’s boundaries eastwards. Centuries later, the re-enactment ceremony reminds us of Dublin’s role as a port city in medieval times and highlights Dublin Port’s remarkable history since its establishment as a trading post some 1,200 years ago.

Lord Mayor of Dublin Alison Gilliland said: ''I am absolutely thrilled to have had the honour of Casting of the Spear and marking the eastern boundary of our City. I feel privileged being the Honorary Admiral of the Port for the duration of my term of office.

This ancient tradition of marking the City's maritime boundary with a spear has always fascinated me. It also highlights the strategic economic importance of Dublin Port to our City and indeed our country and how it has grown and developed over the centuries.''

Dublin Port CEO Eamonn O’Reilly commented at the ceremony: “I would like to thank Lord Mayor Gilliland for her participation in this year’s annual Casting of the Spear ceremony as we celebrate our heritage as a port city. It is heartening to be able to return to these time-honoured traditions after the disruption of the last few years. Looking back, now more than 530 years, it is extraordinary to think that our city’s boundaries were established by Thomas Mayler’s spear in the waters of medieval Dublin. Today’s re-enactment symbolises Dublin Port’s continued commitment to preserving an understanding of the history that binds the port and the city together.”

Published in River Liffey

Dublin Port Company (DPC) has announced the development of a second empty container depot as part of the 22-hectare first stage development of Dublin Inland Port.

Dublin Inland Port is located 14 kilometres from Dublin Port off the M2, with direct access to the M50 and to Dublin Port via the Dublin Port Tunnel. 

Coming to the market this week is a 3.2-hectare facility, construction of which will be completed by year end.

Caption: Dublin Inland Port is located 14 kilometres from Dublin Port off the M2, with direct access to the M50 and to Dublin Port via the Dublin Port TunnelDublin Inland Port is located 14 kilometres from Dublin Port off the M2, with direct access to the M50 and to Dublin Port via the Dublin Port Tunnel

When fully operational in early 2023, the new facility will have a storage capacity of 4,000 TEU. This will be in addition to the existing 6,000 TEU facility which commenced operations at the start of this year. It brings to €50 million DPC’s total investment to date in Ireland’s first inland port facility.

The further development of Dublin Inland Port continues the delivery by DPC of the commitment in Masterplan 2040 to maximise the use of existing port lands by relocating port-related, but non-core activities – including empty container storage – away from Dublin Port. It comes as unitised volumes - containers and trailers – grow back towards the peak volume levels of 2019.

Empty Container Storage to Reduce Further

One quarter of all containers moving through Dublin Port are empty because of the structural inefficiencies in container supply chains created by trade imbalances.

Given the pressure on land, storage facilities for mountains of slow-moving empty containers awaiting export can no longer be accommodated in Dublin Port.

Ten years ago, there were seven empty container depots in Dublin Port. Today there are four. Over the past ten years, the volume of containers moving through Dublin Port has increased by 60% to 843,000 TEU in 2021.

All four remaining empty container depots will be redeveloped to provide more throughput capacity on Dublin Port’s fixed footprint over the coming years as Dublin Inland Port develops.

Eamonn O’Reilly, Chief Executive of Dublin Port Company, said; “As we develop Dublin Port towards its ultimate throughput by 2040, capacity pinch points are already emerging and we have to make sure that all of the port’s lands are used exclusively for the transit storage of cargo, particularly trailers and containers. The removal of empty container depots to Dublin Inland Port is essential in achieving this objective. We expect to complete the Stage 1 development of Dublin Inland Port by the end of 2023 to provide capacity for all of the remaining port-related but non-core activities currently located in Dublin Port.

“Once this is done, we will develop capacity for the transit storage of laden containers and trailers at Dublin Inland Port. In addition to our efforts, other such facilities will need to be provided by private sector operators along the M1 and M7 corridors if Dublin Port is to continue to be able to handle future growth out to 2040.”

Cormac Kennedy, Head of Property, Dublin Port Company, said; “We have been working to relocate port-related but non-core activities such as empty container depot storage away from Dublin Port since 2014. The announcement today of the second depot facility coming to market is decisive and signals acceptance of the new realities in container supply chain operations.

“We expect to bring further sites to market this year and to complete the development of the first stage of Dublin Inland Port by the end of 2023. This first stage development will see Dublin Port investing €50 million in Dublin and Ireland’s first inland port facility.

“We are at a tipping point on land capacity in Dublin Port as port volumes grow back towards the record levels of 2019 and as demand increases on unitised services with Continental Europe. In addition, the loss of excessive land areas to State services has further constrained the port’s capacity to cater for growth post-Brexit.

“Dublin Inland Port’s role will intensify, with more customers required to move not only empty containers but also laden units out of the port and at off-peak times. The window of opportunity is now, and customers who adapt early will see the benefits in their business immediately. We foresee additional Inland Ports being developed over time by other parties looking to emulate DPC’s approach, with Dublin Inland Port the blueprint for such investment.

“For now, we are focused on getting this second development at Dublin Inland Port tendered, built and operational in the shortest time frame possible.”

Published in Dublin Port
Tagged under

Dublin Port Company (DPC) has today launched a new water safety awareness campaign, bringing comedy stars Darren Conway and Joe McGucken aboard to help spread the important message. The campaign is being launched ahead of the bank holiday to help promote the safe and responsible use of Dublin Bay for leisure and recreation this busy summer season and encourages anyone planning a trip on the water to “always think water safety”. According to a new survey on water safety commissioned by DPC, half of people say they are not well attuned to water safety.

In the past number of years, DPC has continued to observe an increase in the number of people enjoying water-based sports and activities in the surroundings of Dublin Bay and Dublin Port, often for the first time. Unfortunately, these same surroundings can be potentially very dangerous, including the active, busy shipping lanes, where large ferries and cargo ships operate year-round.

The survey undertaken by DPC indicated that swimming was the most popular water-based activity undertaken by the public, with 50% of participants having engaged in the activity. Only around 20% of swimmers always use a tow float when in the water, which is a simple safety device used to aid visibility. Swimming was followed by Canoeing/Kayaking and Rowing as the next most popular pursuits.

Only 10% indicated they were very familiar with various aspects of these large vessels that frequent Dublin Bay. Awareness surrounding large vessels is strongly influenced by water activity engagement; those who do not participate in any activity are significantly more likely to be unaware of aspects of the large vessels. While two-thirds indicated that they would be aware of basic safety protocol and equipment like lifejackets and first aid kits, only 26% said they were very familiar with VHF Radio, an important safety communications and alert system.

Members of the city’s established boat and water sports clubs will already be very familiar with the dos and don’ts of crossing Dublin Bay, navigating the shipping lanes at Dublin Port or enjoying the River Liffey. Nonetheless, less experienced members of the public can find themselves in dangerous circumstances, requiring assistance from the DPC team on occasion.

As part of the campaign, DPC has created a starter’s guide to basic safety etiquette on the water, including a new map showing a simplified version of the shipping lanes at Dublin Port where permission to cross is mandatory for all leisure craft users. This information, and more, is available at www.dublinport.ie/water-safety.

Dublin Port’s Shipping Lanes Map

Speaking about the campaign, Darren Conway said; “Having worked with Dublin Port on this campaign last year, I was delighted to be asked to come back and reprise my character of Backstroke Conway. Lads my age are the main people who might find themselves getting in trouble out there on the water so I’m more than happy to help spread this message, and have a bit of fun doing it!”

 Comedians Darren Conway and Joe McGucken with the Dublin Port water safety messageComedians Darren Conway and Joe McGucken with the Dublin Port water safety message Photo: Damien Eagers

Dublin Port Harbour Master, Captain Michael McKenna, said; “With almost 50 ship arrivals or departures per day, the shipping lanes of Dublin Bay and the River Liffey are very busy, with multiple vessels often moving at the same time. These large ships must navigate within the deep water of the shipping lanes, so it is vital that smaller vessels keep clear and stay safe.

We love to see the water enjoyed safely. By being aware of the risks, making safe decisions and having the appropriate safety equipment people can enjoy the magnificent environs of the river and bay.”

Note on Jet Skis and Personal Watercraft (PWC)

Jet ski and PWC users are reminded to adhere to the 6 knots speed limit when within 60 m of a pier, jetty, slipway, mooring, shore or another vessel and 120 m of a swimmer or dive flag. Freestyling is not permitted within 200m of swimmers, or the shoreline.

Download Dublin Port’s Water Safety Flyer and Dublin Port’s Shipping Lanes Map below 

Published in Water Safety
Tagged under

Dublin Port Company is supporting the State’s effort to recover from the Four Courts fire of 1922 by funding the conservation of 200-year-old records concerning Dublin Port.

On 30 June 1922, the Public Record Office of Ireland at the Four Courts was destroyed in the opening engagement of the Civil War. In the aftermath of the fire of 1922, over 25,000 sheets of paper and parchment were retrieved from the rubble. These records, which date from the fourteenth to the nineteenth centuries, are known as the ‘1922 Salved Records’. They are now held at the National Archives.

Most of this collection remained unopened until the last five years. As the successor of the Public Record Office of Ireland, the National Archives is a Core Partner in the Beyond 2022 project—an all-island and international research programme hosted at Trinity College Dublin and funded by the Department of Tourism, Culture, Arts, Gaeltacht, Sport and Media under Project Ireland 2040. The project is working to reconstruct what was lost in 1922.

During a recent investigation of unopened parcels of salved records through the Beyond 2022 project, archivists identified five parcels of significance to the history of Dublin Port.

The thousands of sheets of paper are historically significant both as survivors of the destruction of 1922, and as fresh evidence for the historical development of Dublin PortThe thousands of sheets of paper are historically significant both as survivors of the destruction of 1922, and as fresh evidence for the historical development of Dublin Port

Now, with generous support from Dublin Port Company, these records are being restored by the conservation team at the National Archives of Ireland. The conservation work is being undertaken by the Beyond 2022 Project Conservator, Jessica Baldwin, under the guidance of Zoë Reid, Keeper, Public Services and Collection. The documents all show some evidence of damage from the heat of the flames, as well damp and rain from exposure to the weather following the fire. Despite the damage, conservation will mean that documents not seen for 100 years can soon be consulted again by historians and the public.

The thousands of sheets of paper are historically significant both as survivors of the destruction of 1922, and as fresh evidence for the historical development of Dublin Port. These papers create an incredible snapshot of the bustling live of the busy port with hundreds of people from around the country, from ports in Killybegs, Strangford and Youghal coming to collect salaries, pensions and trade in goods. They contain details on salaries and compensations, and many names of inspectors and collectors of customs taxes. They provide accounts about wine, bounties on beef and pork, allowances on silk, detail repayments of taxes on fish, ash, salt, and linen. For example, over 50 documents relating to the Bounty Payments for Fish in the summer of 1817 give a fascinating insight, as they include information on the ship, listing crew members and detailing the size and type of catch. These are important details of trade and commerce in Dublin Port that do not exist elsewhere.

Following the conservation, the documents dating from 1817–1818 will be available for research and suitable for digitization.

Speaking about the partnership, Minister for Tourism, Culture, Arts, Gaeltacht, Sport and Media, Catherine Martin TD said: “This partnership between Beyond 2022, the National Archives and Dublin Port is an important and significant one. The process of saving the recovered records from the fire at the Public Record Office in June 1922 is a flagship project under the Government’s Decade of Centenaries Programme led by my Department's Commemorations Unit.

“The care that staff in the Public Record Office demonstrated over 100 years ago in their mission to save as many records as possible is now being continued by a highly skilled and committed team of archivists and conservators working together to uncover and reveal a snapshot of what life looked like at Dublin Port in 1922.”

Eamonn O’Reilly and Orlaith McBrideEamonn O’Reilly and Orlaith McBride examine the archive

Eamonn O’Reilly, Chief Executive, Dublin Port, said: “Our own rich archive is an important and actively used resource which we routinely rely on to tell the story of Dublin Port. We are delighted now to be able to add to the additional archive materials related to Dublin Port which the National Archives holds by supporting the conservation of records recovered after the burning of the Four Courts a century ago.”

Orlaith McBride, Director of the National Archives, said: “The conservation of these records represents a significant contribution to the State’s key legacy project from the Decade of Centenaries. The National Archives as successor institution to Public Record Office has held these records, salvaged from the fire in 1922, in its care for almost 100 years and has now begun the process of conservation. This support from Dublin Port is invaluable in terms of allowing us to progress this work.”

Dr Peter Crooks, Trinity College Dublin and Academic Director of the Beyond 2022 project, said: “As each page of these fascinating archives is restored, another page of Irish history is returned to the public record. These documents provide a fascinating insight into everyday life 200 years ago - not only in Dublin, with its extensive trading network, but also across Ireland at large.”

Published in Dublin Port
Tagged under

Dublin Port’s volumes have recovered strongly in the first quarter of 2022 with growth of 13.7% to 8.9 million gross tonnes compared to same period in 2021.

Reporting its trading figures for Q1 today (Wednesday 20 April), Dublin Port company also confirmed that imports from January to March grew by +14.2% to 5.4 million gross tonnes, and exports also grew, by 12.8% to 3.5 million gross tonnes.

Unitised trade (Ro-Ro and Lo-Lo) accounted for 82% of all cargo volumes in the quarter and the number of trailers and containers combined increased by +13.3% to 363,000 units.

Within this, there was a strong recovery in Ro‑Ro with growth of 22.9% to 250,000 units. This was partly offset by a decrease in Lo‑Lo of -3.5% to 112,000 units (equivalent to 202,000 TEU).

While overall unitised volumes grew to 363,000 units, trends were very different geographically:

  • Ro-Ro and Lo-Lo to and from ports in the Cherbourg to Rotterdam range increased by +1.8% to 152,000 units.
  • Unitised volumes (mainly Ro-Ro) to and from the GB ports of Holyhead, Liverpool and Heysham grew by 23.0% to 192,000 units.
  • Ro-Ro and Lo-Lo with other EU ports and with non-EU ports in the Mediterranean increased by +26.4% to 19,000 units.

Elsewhere in Dublin Port’s unitised trades, imports of new trade vehicles declined by ‑8.0% to 25,000 units as land constraints continue to impact the port’s transit storage capacity.

Bulk liquid imports of petroleum products returned to the pre-pandemic record levels of 2019 with strong growth of +20.2% to 1.1 million tonnes, emphasising Dublin Port’s importance as a national energy hub.

Bulk solids (including agri‑feed products, ore concentrates and cement products) finished the quarter +8.0% ahead at 0.6 million tonnes.

Outside of Dublin Port’s cargo business, passenger and tourism volumes have partially recovered post-pandemic. Passenger numbers on ferries (including HGV drivers) increased by more than 150% to 209,000 while tourist vehicles more than doubled to 58,000 (+238%).

However, both passenger numbers (-23%) and tourist vehicle volumes (-29%) remain significantly behind their pre-pandemic levels of 2019.

‘The level of growth we are now seeing at the start of 2022 suggests that record throughput levels will again be seen by 2023 or 2024’

Commenting on the Q1 2022 figures, Dublin Port’s outgoing chief executive Eamonn O’Reilly said: “Given that the first quarter of 2021 was very weak in the wake of Brexit — with overall cargo volumes back by -15% — we anticipated, and, duly saw, a strong recovery of +14% in the first quarter of the year to nine million gross tonnes.

“Dublin Port accounts for four-fifths of all trailers and containers handled in ports in Ireland and, in the first quarter of 2022, volumes grew strongly by +13% to 363,000 units.

“This recovery was driven, in large part, by the +23% growth to 192,000 units in freight volumes on services to the ports of Holyhead, Liverpool and Heysham. However, volumes on these routes are still -18% below their pre-Brexit levels

“Elsewhere, volumes of trailers and containers on services to the EU and beyond – which had increased by +18% last year – grew in the first quarter of 2022 by a further +2% to 171,000 units.

“Imports of petroleum through Dublin Port account for nearly one-third of all of the country’s energy needs and, in the first quarter, volumes of petrol, diesel and other fuels increased by one-fifth.

“Dublin Port’s last record year was 2019 and volumes in the first quarter of this year were -8% lower than they had been three years ago. The level of growth we are now seeing at the start of 2022 suggests that record throughput levels will again be seen by 2023 or 2024.

He added: “This growth maintains the pressure on us to continue to deliver our large capital programme at pace. This will not be easy against the background of high inflation which is particularly evident in the construction sector.”

Published in Dublin Port
Tagged under

Dublin Port Company has taken delivery of a new Pilot Boat named DPC Dodder.

The state-of-the-art vessel represents a significant investment to support the critical service performed by the pilots and pilot boat crews on the River Liffey and Dublin Bay.

Built by Goodchild Marine, the boat was accompanied on its journey home by its sister ship, the DPC Tolka and flanked by tug boats Beaufort and Shackleton.

Dublin Port Company has taken delivery of a new Pilot Boat, named DPC Dodder. The state-of-the art vessel, which represents a significant investment to support the critical service performed by the pilots and pilot boat crews, arrived in Dublin Port having set sail from Great Yarmouth last week.

Taking delivery of the 17.1 metre ORC vessel in Dublin Port was Harbour Master Captain Michael McKenna and Assistant Harbour Master Paul Hogan. The latest addition to the Port’s fleet is the second incarnation of the DPC Dodder, as the original was retired in 2020 following 23 years of service. The new Dodder joins pilot boats Liffey, Camac, and Tolka amongst the Port’s fleet of working vessels, which also includes tugboats Shackleton and Beaufort and multi-purpose workboat the Rosbeg.

Piloting the new vessel on her maiden voyage to Dublin was Alan Goodchild of the leading UK boat builder Goodchild Marine Services Limited, the Norfolk-based company that built DPC Dodder having secured the contract to construct the boat in 2020. This is the second pilot boat that Goodchild Marine has supplied to the Port in recent years, having delivered the DPC Tolka in 2019.Piloting the new vessel on her maiden voyage to Dublin was Alan Goodchild of the leading UK boat builder Goodchild Marine Services Limited, the Norfolk-based company that built DPC Dodder having secured the contract to construct the boat in 2020. This is the second pilot boat that Goodchild Marine has supplied to the Port in recent years, having delivered the DPC Tolka in 2019. Photo: Conor McCabe

Designed by French Naval Architect Pantocarene for both fuel efficiency and performance in challenging weather conditions, DPC Dodder features the latest navigational and safety equipment on board, including a dedicated Pilot workstation in the wheelhouse and hydraulic Man Overboard Recovery Platform at the stern.

With shipping companies increasingly deploying longer, deeper ships capable of carrying more cargo, DPC Dodder represents a vital upgrade and expansion in the provision of pilotage services at the Port and will allow Dublin Port’s team of highly skilled marine pilots to reach and board these ships in all weather conditions from a greater distance out into Dublin Bay.

Dublin Port Company has taken delivery of a new Pilot Boat named DPC Dodder.

Dublin Port Harbour Master, Captain Michael McKenna, said: “Dublin Port Company is delighted to take delivery of DPC Dodder, another state-of-the-art vessel from Goodchild Marine. Demand for pilotage continues to grow as the Port does, and DPC Dodder will help meet the operational and navigational needs of both regular customers and visiting vessels in the years ahead. We were delighted to work with Goodchild Marine again and thank them for their skills and workmanship in designing and delivering this vessel.”

Dublin Port Company has taken delivery of a new Pilot Boat named DPC Dodder.

Eamonn O’Reilly, Chief Executive, Dublin Port Company, said: “At Dublin Port we are always investing in infrastructure, but that is not simply confined to marine engineering works such as building quay walls, but also extends to the fleet that keeps the Port operational around the clock. Our pilots increasingly need to embark and disembark from much larger capacity ships, often in poor weather conditions or at peak times when demands for pilotage services are highest. DPC Dodder has allowed us to upgrade our equipment in line with customer investment in new ships and additional capacity on existing routes.”

Published in Dublin Port
Page 5 of 59

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023