Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: port of Cork

9th February 2024

Port of Cork CEO to Leave

The Chief Executive of Cork Port is leaving after four years in the post.

Eoin McGettigan announced his intention to step down from his role in May today.

“This is not a decision I’ve taken lightly as it has been an honour to lead the Port of Cork through such a transformative period for the company. The Port has celebrated many significant milestones over the last four years. The opening of a €94m new terminal in Ringaskiddy, the moving of 70% of the Port’s activities from Cork City to the deeper waters of the lower harbour, as well as the launch of the Port Masterplan 2050 which sets out the Port’s exciting ambitions for the future. I’ve thoroughly enjoyed my time with the Port of Cork and working with the excellent team here, but I feel the time is right for me to focus on further professional goals I hope to achieve.

Michael Walsh, Chairman of the Port of Cork, said the CEO’s “careful stewardship,” had achieved a great deal.

“We wish him well in his future endeavours. Our focus remains on continuing to further strengthen and evolve our business and looking ahead to an exciting transformative period for Port of Cork.”

Published in Port of Cork
Tagged under

The Port of Cork Company has issued a warning to all mooring holders in Cork Harbour that it is going to remove all unauthorised, unpaid or poorly marked moorings in Cork Harbour.

“It is the responsibility of the mooring holder to ensure that their mooring is in the correct position and is clearly marked at all times with the correct mooring number,” the Port Company says. “We hereby give notice that it is the intention of the Port of Cork Company to remove all unauthorised, unpaid or poorly marked moorings over the coming months, from the week commencing 26th of February.”

It has “suspended” the issuing of mooring positions for applications received after 10th of January, “until these works have been completed” and says it will resume “issuing mooring positions on 1st April 2024.”

Published in Port of Cork

Supporting the accelerated growth of the fixed offshore renewable energy (ORE) sector is a key component of the Port of Cork Masterplan 2050, which was launched on Friday (19 May) by Transport Minister Eamon Ryan and Finance Minister Michael McGrath.

The Port of Cork Company Masterplan (read the executive summary HERE) outlines its plans and ambitions over the next three decades and provides an integrated framework for the port to strategically plan and adapt to meet the needs of Ireland’s future social, economic and environmental development.

It includes plans to support the green energy sector and a roadmap outlining the port’s ‘River to Sea’ journey, consolidating all activities in the lower harbour by 2050.

Minister Ryan, who is also Minister for Environment, Climate and Communications, said: “I am delighted to be on site today to be guided through the Masterplan and to see first-hand the world-class facilities that are already in place at the Port of Cork.

“Cork Harbour is one of the largest natural harbours in the world. It has been a working port for centuries and is one of Ireland’s major employment hubs. The Port of Cork Masterplan offers a strategic blueprint towards the future, with the facilitation of fixed Offshore Renewable Energy as a central part of the plan, with full planning permission already in place to provide essential onshore infrastructure resources.

“I also welcome the port's ambitions to achieve a 51% reduction in overall greenhouse gas emissions by 2030, reaching NetZero emissions by 2050, in accordance with the government’s Climate Action Plan 2023. This new plan is definitely charting a course to a new sustainable and secure future for the port.”

Eoin McGettigan, chief executive officer at the Port of Cork Company said: “Historically, the Port of Cork has been an energy hub for the region by facilitating the import of fuels such as coal, oil, timber and land-based wind turbines.

“As we make the necessary move away from fossil fuel consumption, the Port of Cork will continue to play a key role in facilitating the future energy needs of the country as a hub for renewable fuels, transition fuels and offshore energy streams.“”

McGettigan added: “The Port of Cork is a commercial port and to ensure its ongoing competitiveness, we must adapt to the rapidly changing customer expectations which are pressuring the shipping industry to deliver goods in a faster, more flexible, and sustainable manner at low delivery cost. To do this, we must provide our customers with reliable, safe, high-performing facilities and services, and be an efficient link in the logistics chain.

“Despite this commercial ambition, we are extremely aware of our heritage and the role we play in our local community. As we endeavour to meet changing demands, the well-being of the people of Cork and its environment will continue to be embedded in our values, and be reflected in every decision we make.”

Published in Port of Cork

The ESB and the Port of Cork Company have signed a memorandum of understanding regarding joint plans for Ireland’s offshore wind and green hydrogen development, as the Irish Examiner reports.

A key factor of Port of Cork’s masterplan is aiming to position the city and its natural, deep-channel harbour at the forefront of Ireland’s growing offshore renewable energy sector.

And with the ESB’s Net Zero by 2040 seeing collaboration as critical to the development of green energy in Ireland, the partnership comes at an opportune time.

The Irish Examiner has more on the story HERE.

Published in Power From the Sea

The Port of Cork Company (PoCC) looks forward to welcoming the return of cruise ships this spring in Cork Harbour as it announces its Cruise Liner Schedule for 2023. Anticipating a strong year, PoCC sees bookings return to pre-pandemic levels, with 113 vessels expected in 2023, compared to 100 vessels in 2019.

The first cruise liner of the season, ‘The Ambience’, will dock in Cobh on Monday, 10th April.

Speaking about the 2023 Cruise Schedule, Conor Mowlds, Chief Commercial Officer at the Port of Cork Company stated, “Last year, we were delighted to welcome over 115,000 passengers on 90 cruise ships to Cork following a two-year pause as a result of the pandemic. Now, we look forward to what is expected to be a thriving year in the cruise liner industry, as bookings return to pre-pandemic levels, which will have a really positive impact on the local region’s tourism and trade. All of us here at the Port of Cork look forward to welcoming the cruise liners, passengers and crew in the coming months.”

Conor Mowlds, Chief Commercial Officer at the Port of CorkConor Mowlds, Chief Commercial Officer at the Port of Cork

Johanna Murphy, President of Cobh and Harbour Chamber said: “We’re looking forward to once again welcoming cruise passengers and crew back to Cobh. The cruise season is always a huge lift for everyone in Cobh and the local harbour community, so we look forward to what is anticipated to be a busy year of cruise liners which will boost local trade in the town.”

Johanna Murphy, President of Cobh and Harbour ChamberJohanna Murphy, President of Cobh and Harbour Chamber

The Ambience cruise ship is due to dock quayside in Cobh Cruise Terminal at 12:00pm and is scheduled to depart at 19:00pm on April 10th 2023.

Published in Port of Cork
Tagged under

Cork Port Company has formally opened its €89m deepwater container terminal at Ringaskiddy with an announcement that it is formulating a development plan for the harbour up to 2050.

The new terminal is described as "the largest single investment in marine infrastructure of any Irish port over the last 100 years." It has been operational since April, providing multimodal berths in the world, 13-metres in depth and 360 metres in length.

The Port Company says: "When fully operational, on completion of the M28 road network" it will have the capacity to handle 330,000 TEUs. . This road is the subject of protests and concerns from local residents but has Government approval.

At today's official launch Minister Hildegarde Naughton with special responsibility for transport and logistics, said that "Maritime transport accounts for more than 90% of Ireland's international trade, and the Port of Cork has played an integral role in keeping Ireland connected, as part of the global transport system."Cork and Dublin are the only ports in Ireland capable of servicing all six shipping modes – lift-on/lift-off, roll-on/roll-off, liquid bulk, dry bulk, break bulk and cruise.' 

Cork Port Company Chairperson, Michael Walsh, said the container port is only the first phase of an overall proposed development plan for the Port of Cork:

"This is the beginning of an exciting new chapter at Port of Cork as we seek to meet the next phase of needs of our community and customers. As we look forward towards a Vision for 2050, we see huge potential for our harbour to continue its role as a focal point for our community to live in and enjoy, as well as a key gateway for global.

"We would like everyone’s help in developing a new Masterplan to 2050, which will act as a blueprint for the future growth and development of the Port of Cork. I encourage our local community, customers and national stakeholders to share their ideas when we launch a consultation on our draft plan in the coming weeks.” 

The Ringaskiddy development went ahead only after intense local opposition. 

Details of a "blueprint for the growth to 2050" are to be delivered "in the months ahead, following public consultation," according to the Port Company.

Eoin McGettigan, Port CEO, PoCC, said: “It is really important to us that we work with our colleagues, neighbours and customers in the local area to make sure that the development of the Port of Cork is something that everyone is proud of."

Published in Port of Cork
Tagged under

A memorandum of understanding has been signed today between Ireland’s first green hydrogen company, EIH2, the Port of Cork and the Port of Amsterdam.

This partnership will enable Ireland to maximise its use of offshore wind as a source of energy, by providing an alternative route to market for such renewable electricity. Earlier this year, the Irish Government identified an additional 2GW of offshore wind to be used for green hydrogen production, and this partnership provides the route to market that is needed for Ireland to become a net exporter of energy over time.

This partnership will help to enable the establishment of a supply chain for green hydrogen between Ireland and Europe via the port of Amsterdam.

This partnership agreement reflects the high level of collaboration between Ireland and The Netherlands and the European approach of working together to become the first Net Zero continent. The event forms part of a major offshore wind mission organised by the Netherlands Embassy in Ireland from 11th to 14th September and held in Cork. The purpose of the mission is to increase collaboration on the energy transition between Ireland and The Netherlands at a national level and business to business.

The event will bring together key stakeholders from the wind sector in Ireland and The Netherlands including supply chain, developers, academics, utilities, policy writers and policy influencers.

The signing ceremony of the Memorandum of Understanding was attended by the Dutch Minister for Climate and Energy Policy, Mr. Rob Jetten, and the Irish Minister of State for Public Procurement, eGovernment and Circular Economy, Mr. Ossian Smyth, as official witnesses to the agreement. Also represented were Lord Mayor Cork City, Cllr Deirdre Forde and Deputy Lord Mayor of the County of Cork, Cllr Anthony Barry.

Pearse Flynn, EIH2’s founder said: “Our goal at EIH2 is to help both Ireland and Europe achieve their ambitious energy targets. The recent RePowerEU plan quadruples the role for Green Hydrogen in Europe. This was reflected in Ireland’s recent carbon budgets, with an additional 2GW of offshore wind planned specifically for green hydrogen production. This partnership is the beginning of a supply chain for green hydrogen from Ireland where there is a lot of wind but not a lot of hydrogen demand to Europe where the situation is reversed.”

Conor Mowlds, Chief Commercial Officer of the Port of Cork Company said: “At the Port of Cork Company, we see significant opportunities for Cork Harbour to become a hub for renewable energy, which will benefit the environment, local businesses and create employment in the region. We hope to utilise our facilities at this strategic location, working together with like-minded partners to support the development of renewable energy opportunities.”

Ireland and the Netherlands have traditionally enjoyed strong and historic trade relations and both countries have placed strategic priority on the development of production capacity and international distribution of green hydrogen.

Gert-Jan Nieuwenhuizen, Director Business Development Cargo of Port of Amsterdam said: “Port of Amsterdam is very pleased with the signing of this MoU with such valuable partners. It underlines both the strong ties between Ireland and our port and the increasing importance of green hydrogen. For Port of Amsterdam, priorities are to make green hydrogen available to the large industrial clusters in the greater Amsterdam area, as well as to serve as a gateway to the European hinterland, including regions with high potential demand in Germany. The developments in the south of Ireland and the technical proficiency of Irish parties, mean the country will be well positioned for the future export of this new energy source. The port of Amsterdam will offer a route to market for Irish green hydrogen, both in our port itself, and in the rest of Europe.”

Published in Port of Cork
Tagged under

Crowds lined the Riverside from Monkstown to Cobh in Cork Harbour this afternoon as the Big Lift Baffin left Cork Dockyard with three heavy lift cranes aboard bound for New York.

Two Cork Port tugs assisted the ship leaving the Dockyard. It went astern out to the centre of Monkstown Bay and was then turned bow on to leave the harbour down past Cobh, Whitegate and Roche"s Point for the ten-day voyage to the US.

Big Lift heading for sea and New YorkBig Lift heading for sea and New York

For more read Afloat's earlier report on the Big Lift Baffin here

Crowds watching Big Lift Baffin depart Cork DockyardCrowds watching Big Lift Baffin depart Cork Dockyard

Bob Bateman's Big Lift Photo Gallery Below

Published in Port of Cork

The largest single objects ever engineered in Ireland, to be shipped out of the country, have been loaded aboard The Big Lift Baffin at Cork Dockyard in Cork Harbour.

These are three ship-to-shore container cranes built by the Liebherr factory in Killarney, destined for the Maher Terminals at the Port of New York and New Jersey, on the east coast of the United States. These are amongst the world's largest shipping terminals.

The three cranes were designed and manufactured in Liebherr's facility in Killarney, which specialises in cranes for shipping terminals and port operations. The various parts of the crane were manufactured in Killarney and shipped to Cork, either by road, or by sea from Fenit Harbour. They were then assembled in DSG's 44-acre Cork Dockyard terminal, the former Verolme Cork Dockyard. 

Cork's Doyle Shipping Group (DSG) is handling transport operations, including commissioning the Big Lift Baffin, On arrival in the US, the ship will anchor off Sandy Hook, where preparations for passing under Bayonne Bridge, which connects New York to New Jersey will be made.

The Big Lift Baffin will take ten days for the voyage to the US.

"These cranes are the largest single objects ever engineered in Ireland to be shipped out of the country. Months of planning have gone into the process with extensive coordination between DSG, Liebherr and the Port of Cork. It highlights the capability and suitability of Cork Harbour for such operations. There is no air draft, so there are no wires or bridges to impede transport. Once they leave the terminal here, there is direct access to the open Atlantic," said Eoin O'Sullivan, director with DSG.

Published in Port of Cork
Tagged under
19th August 2022

Cork Port Marks 250 Years

The 250-year history of Cork Port underscores the importance of the maritime sphere of the maritime sphere's importance to the region, its Chief Executive told a National Heritage Week event in the Crawford Art Gallery in the city, which was the site of the original Custom House on Leeside.

The Port gifted its collection of maritime paintings and artefacts, worth an estimated €1m.to the Gallery last year after it sold its city centre offices and moved to Ringaskiddy deepwater centre in the lower harbour.

The collection, on exhibition until August 28, comprises 17 paintings dating back to the 1800s by several renowned artists, such as Cobh-born marine painter George Mounsey Wheatley Atkinson. The collection includes a Ship's Register from Cork Harbour Commissioners dating back to 1912, referencing both the Titanic and Lusitania, an illuminated address to Charles Stewart Parnell (1846-1891), and a silver Admiralty Oar from 1686.

A painting by George Mounsey Wheatley Atkinson of a Barque Glenlara off Cork Harbour c.1865 from the Crawford Art Gallery Cork Collection A painting by George Mounsey Wheatley Atkinson of a Barque Glenlara off Cork Harbour c.1865 from the Crawford Art Gallery Cork Collection

"As a company, we are very proud of our heritage, which spans over 250 years. These unique maritime artworks by renowned artists, offer a fascinating insight into the operations of Cork Harbour at that time and underscore the Port's long-standing international significance for commerce and trade, "said Port Chief Executive Eoin McGettigan. "Not only does the collection signify the history of our great Port and harbour, but it also showcases how far the Port has come regarding leisure, operations, scale and trade. We are delighted this collection has found such a welcoming home at The Crawford Art Gallery."

The original gallery building, dating from 1714, was Cork's Custom House.

"This special collection of unique maritime artworks has been one of our most popular exhibitions," said the Director of the Crawford Art Gallery, Mary McCarthy.

"It acts as a visual reminder of this building's connection with Cork's Maritime past as well as showcasing the strong heritage of this great port, city and county."

Published in Port of Cork
Tagged under
Page 1 of 30

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023