Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: DLHC

#Property - Plans to develop “floating homes” in Dun Laoghaire Harbour — and refocus the area on accommodation as well as leisure — have moved a step forward as a formal procurement process is set to begin.

Last September, the Dun Laoghaire Harbour Company sought expressions of interest for plans comprising “a cluster of floating affordable homes” moored in the harbour.

“About two years ago we looked at the notion of a floating hotel,” Dun Laoghaire Harbour Company chief Gerry Dunne told the Sunday Independent. “This concept is the same — to utilise the water space for residential purposes, rather than just leaving it for leisure pursuits.”

The precise specification of the final homes has get to be determined, though a retail price of up to €350,000 is to be expected.

Dunne also expects that if the procurement process is completed in the first quarter of this year, “we could have the floating homes project up and running in 2019.”

The Sunday Independent has more on the story HERE.

#Property - Plans for “a cluster of floating affordable homes” in Dun Laoghaire could soon transform the look of the South Dublin port’s waterfront.

The Dun Laoghaire Harbour Company is seeking expressions of interest via the State’s eTenders website for the development of as many as 50 single-storey homes, which would float on a pontoon on the western side of the Coal Harbour Dock.

According to The Irish Times, harbour company CEO Gerry Dunne says the floating homes — around the size of the average two-bed apartment — would have a capital cost of between €250,000 and €300,000 and would be geared towards those looking for a “starter or retirement” home.

Dun laoghaire harbour ice house coal quay 1982The site identified for the new floating homes in Dun Laoghaire Harbour known locally as the 'ice house' at the Coal Quays Photo: Afloat.ie

Floating accomodation is already in use by businesses in the capital, such as at Grand Canal Dock, but this is the first proposal for such a residential development in Ireland.

The Irish Times as more on the story HERE.

Dún Laoghaire Harbour Company (DLHC) has issued a statement on its cruise berth facility following yesterday's court case decision in which environmental lobby group Save our Seafront, chaired by local TD Richard Boyd Barret, 'won its legal action against the decision to grant planning permission for the Dún Laoghaire Cruise Terminal'.

The Harbour Company maintain its 'Cruise berth facility is on track' as An Board Pleanála seek further information the state company.

The full ramification of this decision are still being fully analysed but the DLHC statement in full is below: 

'Dún Laoghaire Harbour Company (DLHC) has been informed that An Bord Pleanála will not be defending a Judicial Review of the decision of the Bord to grant planning permission to DLHC for the development of a cruise berth facility in the harbour. The Judicial Review had been taken on behalf of Save our Seafront, who had opposed the development. An Bord Pleanála has now determined that certain technical requirements of the Habitats Directive necessitate additional information to be supplied by DLHC. It is recommending that the planning application is sent back to the Bord for this additional information to be assessed. DLHC will co-operate fully with such a request by An Bord Pleanála.

Commenting, DLHC CEO Gerry Dunne pointed out that while the nature of the issues have yet to be outlined in detail they are believed to be “technical and not substantive”. Mr Dunne added that protecting the sensitive environmental and historical significance of the harbour and its environs remain a priority for DLHC.

The proposed 250 metre berth will, it is anticipated, attract c. 50 cruise calls a year (from May to September), an average of 2 a week. The money generated from these visitors will amount to €10m to the local economy annually'.

A statement from Save our Seafront, on yesterday's court case is here.

Published in Dublin Bay

As Dun Laoghaire residents await An Bord Pleanála's decision on the controversial cruise liner berth proposed for the town's harbour, local banker Paddy Shanahan took a look at the books of the Dun Laoghaire Harbour Company (DLHC) – and finds the whole situation wanting. Harbour CEO Gerry Dunne's response is also posted below.

I am a banker with over 30 years' experience working in New York and London. I have recently returned to Ireland. I am married with two small boys and I run a corporate finance and restructuring practice here in Dublin. I live in Sandycove and am part of Dublin Bay Concern, an organisation comprising many residents of Dun Laoghaire-Rathdown (DLR).

My concern relates to the future status of the Dun Laoghaire Harbour Company (DLHC). I am opposed to the planned super cruise berth terminal for the harbour and to the Masterplan submitted by the DLHC. An Bord Pleanála is currently deliberating on DLHC’s application following a month-long oral hearing.

Meanwhile, the Harbours Bill 2015 was recently introduced into the Oireachtas. This bill will decide the future of DLHC. We are presented with two options, one of which will be decided by Minister for Transport Paschal Donohoe:

a) DLHC becomes a wholly owned subsidiary of the chief executive DLR CoCo.
b) DLHC is dissolved and integrated into DLR CoCo.

On a matter of profound importance to the residents of DLR and to the hundreds of thousands who use the harbour as an amenity every year, there has been little to no communication by the relevant elected representatives back to their constituents on this matter, excepting Richard Boyd Barrett and his party People Before Profit.

Difficult financial situation

On my own volition, I obtained copies of DLHC’s accounts from 2012 to 2014. I have analysed these accounts and found the following:

DLHC’s financial position has been declining in recent years. In 2012 the company’s cash reserves declined by €2.0m and in 2013 by a further €1.3m. The decline in cash was much smaller in 2014 (€37,000) thanks to the receipt of a €406,420 grant, the provenance of which and use for is unidentified in their accounts.

At the end of 2014, DLHC had cash reserves of €3.5m. With no revenue from the Stena HSS in 2015, remaining cash reserves of €3.5m are rapidly dwindling.

DLHC had bank loans of €4.8m at the end of 2014 for which it does not appear to have sufficient cash or the prospect of sufficient cash to repay in future years.

Based on the above facts, it is clear to me that DLHC is in a difficult financial situation and has neither the reserves nor the ability to borrow the funds required to build the proposed cruise berth.

Notwithstanding its precarious financial position and ignoring the implications to the well-being of Dun Laoghaire Harbour, DLHC wishes to roll the dice and stake its future on providing giant cruise berth facilities – this despite the reality of Dublin Port.

Less than 5km from Dun Laoghaire, Dublin Port is a highly profitable world-class shipping port, and it is the preferred cruise ship destination offering quick access to Dublin city centre. It already receives over 80 super-sized cruise ships a year and has recently received planning permission to begin a €200m development which will double its large cruise ship capacity together with a state-of-the-art modern passenger terminal specifically being built for visiting cruise liners.

DLHC proposes a collusive duopoly for the cruise ship business with Dublin Port. Not only is this stupendously naïve, it is also illegal for State-owned bodies to distort the competitive environment, and elegantly demonstrates the flawed business case DLHC proposes – especially in light of the Stena HSS departing for good under DLHC’s watch.

'A likely white elephant'

The Code of Practice for the Governance of State Bodies issued by the Department of Finance in March 1992 and updated October 2001 states that:

“As the ultimate owners of, and investors, in State bodies, citizens and taxpayers have an important and legitimate interest in the achievement of value for money in the State sector. Whether commissioning public services or providing them directly, State bodies have a duty to strive for economy, efficiency, transparency and effectiveness in their expenditure.”

In 2012 and 2013 DLHC received €250,000 and €200,000 in grants from Dun Laoghaire-Rathdown County Council (DLRCoCo) in respect of DLHC’S Large Cruise Liners initiative. The former was for tendering facilities outside the harbour mouth; the latter was toward defraying costs relating to the planning application.

If it transpires that the €400,000 grant unidentified in the accounts for 2014 was from DLRCoCo, then it would appear that nearly €1m of DLR taxpayers' money has been paid over by the council toward the planning costs of building a likely white elephant.

Is it unreasonable to posit a conflict of interest where the executive branch of DLRCoCo making the payments to DLHC houses the same department that approved the planning application currently being decided by An Bord Pleanála? Is this like Hamlet without the prince? Have DLHC fulfilled their obligations under the code regarding transparency and governance? Clearly not. Where is the oversight? There isn’t any.

Allowing true oversight

Addressing the Dáil on the occasion of the Harbours Bill 2015 debate on amendments last Wednesday 2 December, Minister Donohoe specified there is to be an undefined period of due diligence and examination of DLHC prior to its future being decided by himself.

In the interests of democracy let us hope the minister dissolves the DLHC and transfers its unencumbered assets to the local authority, thus allowing true oversight and accountability.

Given the close relationship and history between the non-elected executive branch of DLRCoCo and DLHC, a decision by the minister that makes the DLHC a wholly owned subsidiary of the chief executive will be a step backwards and simply perpetuates the current unsatisfactory status quo.

The future of Dun Laoghaire Harbour should be decided by the elected representatives of DLRCoCo, the harbour’s genuine stakeholders, and its various community groups.

Dun Laoghaire Harbour, dear to the hearts of all residents of DLR, is being held hostage to the ambitions of a dysfunctional organisation that is running out of money and being supported in a clandestine manner against all principles of transparency and governance.

Response from Dun Laoghaire Harbour Company CEO

DLHC has decided that it is not appropriate to make further public comment while An Bord Pleanala is considering our planning application.
Suffice to make the following brief points ;
[a] the European Commission have stated that the grant of €20m towards the Dublin Port development is made on the basis that such support is not given to dedicated infrastructure and facilities for cruise ships. Therefore, Mr Shanahan is fundamentally incorrect in his belief that Dublin Port can provide dedicated cruise infrastructure/facilities
[b] Mr Shanahan might be very interested to know that the four Dun Laoghaire yacht clubs combined make only a very minor financial contribution of c.€70k annually towards the upkeep/maintenance of the infrastructure of the 200 year old man-made harbour. This annual contribution constitutes less than 2% of our annual operating/capital costs.

Gerry Dunne, CEO DLHC

#urbanbeach – Dún Laoghaire Harbour Company hopes to be in a position to open a floating swimming pool and urban beach at the historic East Pier of the Harbour for the 2016 summer season.

Permission was granted in late-2014 by Dún Laoghaire Rathdown County Council, but had been appealed as Afloat.ie reported at the weekend.

The project has been inspired by the popular Badeschiff facility in Berlin, a floating swimming pool on the River Spree. The plan for Dún Laoghaire Harbour includes a floating swimming pool containing heated and treated seawater, utilising a converted river barge which will be located within the Harbour. The facility will include an Urban Beach alongside the floating structure, on Berth 1 adjacent to the East Pier. Changing and toilet facilities, a café, an administration area, and security features are also planned.

The Harbour Company estimates that urban beach has the potential to attract 100,000 visitors per year and to generate over €1 million per annum for the local economy.

Dún Laoghaire Harbour Company hopes to be in a position to open the facility for the summer season in 2016.

According to Tim Ryan, Operation Manager, of DLHC: "Today's go-ahead by An Bord Pleanála is very welcome, and marks a vital step in realising the full potential of the Harbour as a marine, leisure and tourist destination of international calibre."

"The urban beach will be a hugely exciting project for Dun Laoghaire as a while. It is very much in keeping with the Government's National Ports Policy which designated Dún Laoghaire as a harbour focusing on marine leisure, marine tourism, and urban development. Today's decision allows us to follow through on our mandate.

Over the coming months, Dún Laoghaire Harbour Company Harbour is set to welcome a record 100,000 cruise passengers and crew. "Combined with the news of the urban beach, the future for Dun Laoghaire Harbour is really shaping up, as set out in the Company's Masterplan of 2011," added Tim.

#DunLaoghaire - Dun Laoghaire Harbour Company director Pam Kearney has resigned over a boardroom dispute over the company's 'master plan', according to yesterday's Sunday Business Post.

The article by Jack Horgan-Jones reports that Kearney tendered her resignation letter last week, citing concerns over "three of the four cornerstone projects" of the plan.

These were named as the diaspora centre (which was scrapped by the Government earlier this year), the cruise liner berth and the 'urban beach' planned for the East Pier.

Kearney's departure comes just weeks after Justin McKenna, Commodore of the Royal St George, also stepped down as a director over his own concerns with the cruise terminal plans.

But harbour company chief executive Gerry Dunne has denied any split in the boardroom, saying it "remains fully behind the implementation of the 2011 master plan".

The Sunday Business Post article also referenced an unpublished engineer's report commissioned by the harbour company that highlighted issues that could cost millions in repairs to the harbour's three main piers.

#dlhc – Royal St. George Yacht Club Commodore Justin McKenna has resigned as a board member of the Dun Laoghaire Harbour Company (DLHC) with immediate effect. 

McKenna told members of his decision at a meeting of the country's biggest sailing club last Friday. The meeting was held to discuss controversial DLHC proposals on the new cruise liner berthing arrangements inside the harbour that has drawn the ire of many Dun Laoghaire sailors.

The Minister of Sport appointed McKenna to the Harbour Company Board  in March 2014, as Afloat.ie reported at the time. 

As the Irish Times reported last Friday there is growing dissatisfaction among 5,000 sailing and boating fans over proposals that, say objectors, will curtail sailing inside the harbour walls.

Royal St. George members have been urged to let their views be known on the 435–metre long quay to be built next to their clubhouse. The club also wants individual sailing classes to make submissions.

It follows an online petition set up by sailors that has attracted 1500 signatures to save 'Dun Laoghaire dinghy sailing' 

Friday's meeting was followed by an open session for Royal St. George members. An 'abbreviated version' of the points raised has appeared on club facebook page as follows:

• The councillors should be advised that the city of Venice is considering banning all big cruise liners because they are causing untold damage to the fabric of the city. The income from these liners is valued at 10c per passenger

• Cruise ships are good for Dun Laoghaire, anchored in the bay and we welcome SMALL ships in the harbour.

• Each sailing class should make a submission and encourage submissions

• The economic benefit to Dun Laoghaire is not good from the passenger perspective. There will be initial public interest. However, this will fall off over time as people become bored with them

• The only beneficiaries will be the coach tour operators

• Some basic calculations would indicate that it will take + 100 yrs. to recover the construction cost

• The Dublin Port proposal is in direct competition yet it is only a few miles away.

• The consultation period closes next Monday and it is important that the club advises members to object to the planning board a.s.a.p.

• Dun Laoghaire is the major centre for youth training on the island of Ireland. This proposal will have a detrimental if not fatal effect on this activity

• The scale of the ships is difficult to comprehend and is out of character with a Victorian harbour.

• International Sailing events will not come to Dun Laoghaire. Tourism Ireland will not be happy.

• The Water wag class commenced sailing in the harbour in 1887 and is one of the oldest racing classes in the world.

• Irish Lights have conducted many studies of the harbour bed and a considerable area is covered in granite. Dredging cost numbers will be almost double the cost estimated and Dublin Port will be gaining from the anchoring dues.

DLHC says the plan is to facilitate some of the world's biggest cruise liners berthing inside the harbour. The aim is to regenerate the harbour and town following the loss of the HSS Stena car ferry between Dun Laoghaire and Holyhead in February.

A total of 22 cruise ships are expected to berth this summer, bringing up to 100,000 passengers and crew to the port bringing up to €7m in revenues, 30% of whicdh will be spent locally in Dun Laoghaire, according to DLHC.

A public consultation is underway following DLHC presentations with over 20 separate stakeholders groups.

Observations or comments can be submitted by email to [email protected] or by post to Jean Finnegan, Dun Laoghaire Harbour Company, Harbour Lodge, Crofton Rd, Dun Laoghaire, anytime up to 5pm on Monday, 13th April 2015.

A copy of the DLHC presentation is HERE.

#sdls –  A new group, Save Dun Laoghaire Sailing (SDLS), has come forward with radical proposals for a re-configuration of the harbour in order to accommodate the proposed Cruise Liner Berth in the harbour, (plans of which were revealed on Afloat.ie last Thursday), while at the same time maintaining the town's pre-eminent role as Ireland's greatest sailing centre.

A spokesperson for SDLS said that the new group's proposals were still only at a very preliminary stage, but the extremely short time lapse permitted for objections or modifications to the Harbour Company's plan has meant that they have had to act in great haste. 

However, the spokesperson asserted that the harbour's thousands of recreational sailors are so concerned at some elements of the new plan - such as the rumoured intention to forbid boats manoeuvring under sail only, let alone racing, within the harbour – that they have had no trouble in recruiting supporters, and an ad hoc inaugural meeting in recent days instructed an acting committee to proceed as rapidly as possible.

The underlying thinking behind SDLS's proposals is that the areas of activity for the different interests within the harbour should be clearly delineated. "Good fences make good neighbours" is the group's core philosophy, and with this in mind they have proposed two new in-harbour breakwaters in order that the large area in the centre of the harbour, which is intended for use by the new cruise liner berthing facilities, will be walled off from other areas of the port.

This will be done by a new in-harbour breakwater from St Michael's Pier to the outer end of the present East Pier, and another small in-harbour breakwater closing off the present outer entrance to the marina.

dlhr2.jpg

Dun Laoghaire Harbour with the Harbour Company's proposed Cruise Liner Berth occupying most of the space between St Michael's Pier and the harbour entrance

DL_HarbourSDLS.jpg

Radical proposals from SDLS (Save Dun Laoghaire Sailing) include new Eastern and Western entrances to the harbour, and two new in-harbour breakwaters which will clearly separate the cruise liner areas from the recreational sailing and boating areas. In effect, three new harbours will be created.

 In order to make this feasible, the group has come up with the visionary concept of giving Dun Laoghaire Harbour two additional entrances. The new entrance to the east would be created by making a gap in the existing East Pier, and would inevitably be expensive, as this is exposed to onshore winds, and thus would require a very substantial sheltering breakwater. However, it would still be as cost-effective as possible, as this new Eastern Entrance would not need to be nearly as wide as the current main entrance, as that was created in order to be negotiated by the cumbersome sailing ships of the early 19th Century.

When Afloat.ie pointed out to the spokesperson (who wishes to remain anonymous for the time being) that a gap in the East Pier would result in the ending of the time-honoured tradition of South Dubliners walking the length of the pier on a Sunday, the response was that the demographic is such that an increasing number of South Dubliners are so aged as to be no longer capable of walking the entire length of the East Pier, and thus they would welcome the shorter walk to the lighthouse which will be provided by the new inner breakwater direct from St Michael's Pier.

A further question about the need for manoeuvring space for the cruise liners between their proposed berth and the East Pier elicited the reply that the Harbour Company have already made it clear that they will have to dredge a ten metre channel from the present main entrance to the new berth to serve the deeper drafted liners. Therefore the building of a new pier along the eastern edge of this dredged channel will not impinge on the cruise liners' area of access, and will moreover restrain small craft which might be sailing or racing in the eastern harbour from straying into the liner area.

SDLS is particularly enthused about the possibilities offered by he new western entrance. "For far too long, the West Pier has been more like the Wild West Pier than part of a civilised harbour," we were told. Now, with the new entrance, it will be brought centre stage, and those dinghy sailors from the RIYC, the DMYC, the INSS and the Coal Harbour who were formerly reluctant to venture into the open waters of Dublin Bay will find they have easy access to the relatively sheltered Bay waters between the West Pier and Seapoint.

SDLS conclude their initial policy document by pointing out that their plan would in effect provide the benefit of having three harbours where at present only one exists. And for further diversity, they suggest that the central commercial area for the cruise liners could possibly, in time, also accommodate some working fishing boats, as the colourful activity of hardy fisherfolk is much appreciated by cruise liner passengers 

As to the fact that the creation of two new entrances means in effect that there will now be two completely separate leisure harbours on the south side of Dublin Bay with their entrances one and a half miles apart, SDLS argues that this is one of the most attractive features of their plan.

"Sailing enthusiasts from places blessed with natural advantages and numerous little ports of call, such as Cork Harbour, are always bemoaning the fact that when you sail out of Dun Laoghaire, there is nowhere convenient to go to within easy reach. But thanks to our plan, we can now envisage that a boat which has to go to sea via the new West Entrance could go out for a nice sail in Dublin Bay, and then go visiting in the eastern part of the harbour through the new Eastern Entrance, and vice versa.

Having considered these attractive options, we don't see the proposed new cruise liner berth as a problem. On the contrary, we see it as an opportunity to make Dun Laoghaire a much more interesting place to sail from".

dlhr4.jpg

Dun Laoghaire harbour largely as it is today, although the presence of the HSS ferry in port is now history and the contentious new library has been inserted in the tree-surrounded green space at right foreground. Photo courtesy ICC.

Editor's Note: Normally our April 1st special would be pulled at noon. But as virtually all plans for a totally artificial harbour at Dun Laoghaire, ever since the first ones more than two hundred years ago, have been initially treated as an April Fool joke, we think we'll let this one run. And further comments are welcome, for underlying the tomfoolery, a very serious situation is developing for the harbour's future.

Screenshot_2015-04-02_07.39.39.png

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023