Menu

Ireland's sailing, boating & maritime magazine

Inland afloat headers

 

Displaying items by tag: SailGP

SailGP has been called out by Greenpeace’s executive director in New Zealand/Aotearoa over its response to a race cancellation prompted by the presence of dolphins on the racecourse.

Racing was postponed on Saturday 23 March at the second annual New Zealand Sail Grand Prix in Christchurch, leading to a so-called ‘Super Sunday’ where Australia’s SailGP team suffered a massive collision that forced their retirement.

Following the event, SailGP co-founder Sir Russell Coutts had harsh words for what he described as an “extreme marine mammal management plan forced upon us”.

But Greenpeace’s chief in New Zealand wasn’t having any of that.

In an opinion piece for the NZ Herald, Dr Russel Norman characterised Sir Russell’s comments as “a Trumpian outburst”, emphasising that SailGP was fully aware of the Lyttelton Harbour venue’s status as a protected area for endangered Upokohue/Hector’s dolphins.

“So much for all the greenwash that SailGP cares about the environment,” Dr Norman says.

The NZ Herald has more HERE.

Published in SailGP

Australia’s SailGP team suffered a massive collision that forced their retirement from the second annual New Zealand Sail Grand Prix in Christchurch at the weekend.

As Marine Industry News reports, Tom Slingsby and his crew were rocked by the collision with a course mark during the first fleet race on Sunday (24 March) — a so-called ‘Super Sunday’ due to the cancellation of Saturday’s racing over dolphins on the racecourse.

While the crash was a devastating blow for the team, who celebrated victory in their home event last month, it could have been much worse for them and for Canada’s F50 as it was the result of a split-second manoeuvre to avoid a catastrophic clash between the two boats.

“It all happened so quickly but at that moment I knew that we were going to hit Canada, so I had a choice to make and I wanted to keep people safe so I turned the boat as hard as I could into the course mark,” Australia Team driver Slingsby said. “I knew the mark was there but it was either that or go straight through Canada.”

New Zealand’s Peter Burling and crew went on to take the victory in their home race in this ninth round of the SailGP’s fourth season.

Marine Industry News has more on the story HERE.

Published in SailGP

Australia claimed its first SailGP Season 4 win by triumphing over ROCKWOOL Denmark and New Zealand in an action-packed, three-boat Final on Sydney Harbour at the weekend.

A dominant performance on home waters throughout the weekend saw the Aussies qualify for the Final alongside the Kiwis and ROCKWOOL DEN, with France once again falling short of a top-three finish by the narrowest of margins.

And following a hard-fought battle in the event-deciding clash, it was Tom Slingsby's team who secured the victory to delight the watching crowds who lined the shores of Genesis Island and Sydney Harbour this weekend.

Australia's Home Triumph at SailGP Sydney HarbourAustralia's Home Triumph at SailGP Sydney Harbour

Published in SailGP
Tagged under

New Zealand did the double in the UAE to secure back-to-back victories after winning the Mubadala Abu Dhabi Sail Grand Prix presented by Abu Dhabi Sports Council. Mastering the light conditions and its nemesis - the 29 metre wing - New Zealand beat Spain and the United States in front of a sold out crowd. In a change of favour, overall leaders Australia missed out on its first event final of the season to finish seventh.

The new-look US team - with Taylor Canfield in the driving seat - sailed well to secure a fourth and third, to make it into the first final since the team was sold, with the final spot secured by the Burling's Kiwi's.

In the three-boat event final, the Kiwis had the strongest start, crossing the line first and leading round the first mark from Spain and the United States.

The results from this weekend closes the gap between the Aussies - who still remain first overall on the leaderboard - ahead of New Zealand who have bumped their way up to second place - with only a six point gap between first and second. The Kiwis now record the most event wins across Season 4. A podium result for the US, sees them move up the leaderboard from fifth to third.

The SailGP fleet packs up and leaves the UAE and arrives at its first stop in APAC for the eighth event of Season 4 in the heart of Sydney, Australia. Fans don't have long to wait for their next fix of SailGP as the KPMG Australia Sail Grand Prix in Sydney takes place on February 24-25.

Mubadala Abu Dhabi Sail Grand Prix Presented By Abu Dhabi Sports Council // Final Standings //

1 // New Zealand 10 points
2 // Spain 9 points
3 // United States 8 points
4 // France 7 points
5 // Germany 6 points
6 // Canada 5 points
7 // Australia 4 points
8 // Emirates GBR 3 points
9 // ROCKWOOL Denmark 2 points
10 // Switzerland 1 point

Published in SailGP
Tagged under

British sailing legend Sir Ben Ainslie is stepping down as driver of Emirates Great Britain SailGP Team, as Marine Industry News reports.

The Olympic Games’ most successful sailor to date will be succeeded by fellow Olympic medallist and America’s Cup teammate Giles Scott as he intends to set his focus on the latter event.

Sir Ben will continue as chief executive and majority owner of Emirates GBR.

Announcing his decision just weeks after his final SailGP race as driver in Dubai, Sir Ben said it is “time for the next generation to come through”.

He added: “As the CEO of both Emirates GBR and the INEOS Britannia America’s Cup Team, and most importantly, a husband and father, at some point, you’ve got to realise that you can’t do everything.”

Marine Industry News has more on the story HERE.

Published in SailGP
Tagged under

SailGP has cancelled its upcoming event scheduled for Auckland next March over a reported legal issue concerning land for a spectator stand.

According to Marine Industry News, a dispute has arisen over how much land would be made available for the seating area at Wynyard Point, a zone of reclaimed land on Waitematā Harbour where remediation works are ongoing and which is currently leased to America’s Cup winners Emirates Team New Zealand.

The city of Auckland said that it presented alternatives to SaulGP organisers but “the unavailability of Wynyard Point land as a spectator facility proved to be a barrier to holding the event in Auckland”.

A spokesperson for SailGP said that it “continues to work…to progress planning for its Season 4 New Zealand event, 23-24 March 2024”.

Marine Industry News has more on the story HERE.

Published in SailGP
Tagged under

Recently crowned World Sailor of the Year, Tom Slingsby will miss the upcoming Emirates Dubai Sail Grand Prix, it has been confirmed.

The Australian driver, who leads the three-time reigning and defending team, will skip the event to be with his wife Helena, who is expecting their first child.

It means a substitute driver will take the reins of the Flying Roos, who will continue their hunt for an elusive first win when Season 4 arrives in the United Arab Emirates next month. It is understood the identity of the driver will be revealed in the run-up to the event, which takes place on December 9-10.

Despite not winning an event so far this season, Australia currently sits at the top of the overall Championship leaderboard with 43 points. The Aussies have appeared in all five Finals of Chicago, L.A., Saint-Tropez, Taranto and Cadiz, but failed to clinch the overall victory. Speaking after Cadiz, Slingsby said he was 'sick of losing Finals' and reflected on the team's last win - the Season 3 title in San Francisco in March.

Nicolai Sehested's ROCKWOOL DEN currently sit in second place with 36 points thanks to consistent fleet racing, while the United States soared up the leaderboard to third with 32 points after winning in Cadiz.

Published in SailGP
Tagged under

Triple SailGP champions Australia have risen to the top of the leaderboard after the first day of aggressive racing in Cádiz on Saturday, but has just a one-point lead heading into day two.

Nicolai Sehested’s ROCKWOOL DEN are breathing down their necks in second place with 24 points after a day of consistent racing, while home favourites Spain are in third thanks to winning the first race of the day.

Despite a lukewarm 5th place in Fleet Race 1, Australia battled back to finish second in Fleet Race 2 and take the win in the final race of the day, topping the metrics of highest average speed, fly time, distance and manoeuvres.

Speaking after racing, driver Tom Slingsby said the team had worked hard to improve on their ‘shocking’ performance in practice racing.

“We learned a lot overnight; we looked at our rivals and saw what they were doing differently - it was just a few things we tidied up, but all in all we sailed way better,” he said.

It was a day of erratic performances, aggressive racing and tight boat-on-boat situations as the notoriously unstable sea state of Cádiz challenged flight controllers.

The first fleet race was packed with drama, with Switzerland disqualified after attempting to barge into the start line, forcing ROCKWOOL Denmark to avoid a collision.

A close call between France, Canada and Emirates GBR in the approach to the finish line almost resulted in a collision, and an 11th-hour penalty sent France to the back of the fleet.

Erik Heil’s Germany had a shocking start to the second fleet race when it was squeezed out of the line by the Swiss. Quentin Delapierre’s France meanwhile converted a dominating start into a commanding lead and took the second win of the day.

Elsewhere, a growing feud between the Spanish and Canadians - sparked by a fallout over a collision in Saint-Tropez - saw aggressive match racing tactics deployed by Phil Robertson’s Canada to land a painful penalty on Spain.

Switzerland had another close situation on the start line of the third fleet race with France, but Australia looked untroubled as they stretched away from the fleet to secure the last race win of the day.

New Zealand had a lukewarm return despite a convincing performance in practice racing, picking up 4-5-8 race results to finish 6th at the end of the day.

Ben Ainslie’s Emirates GBR also had a tricky day despite winning the last two events in Taranto and Saint-Tropez. The team suffered technical issues ahead of racing and finished with 8-10-6 results, making it almost impossible for the Brits to make tomorrow’s Final.

Racing resumes at 15:30 CEST on October 15.

Published in SailGP
Tagged under

New Zealand bounced back from its enforced racing hiatus by picking up two race wins and ending Cadiz’s practice racing at the top of the leaderboard, tied on points with ROCKWOOL DEN.

The result comes the day before the Spanish Sail Grand Prix at Andalucía-Cádiz on Saturday, October 14.

The Kiwis picked up a 1-4-1 race record across the three practice races, ending the day with 27 points. It comes after the team suffered significant wing damage at the end of the Saint-Tropez Race Day 1, which ruled them out of racing on day two and for the entire Taranto event.

The Kiwis currently sit 5th on the Season 4 Championship leaderboard and is under pressure to claw back precious points when the 5th event of the season gets underway in Cadiz.

ROCKWOOL DEN, which has had a strong season start, also performed well, picking up three 2nd place finishes in a consistent showing.

Meanwhile, Jimmy Spithill’s United States finished the day in 3rd with 23 points, picking up 4-3-3 finishes despite the absence of flight controller Hans Henken who is recovering from injuries sustained in Taranto. Former flight controller Taylor Canfield is subbing into the role at this event.

Elsewhere, it was a tricky day for Quentin Delapierre’s France, which finished the day at the bottom of the leaderboard, below Canada, Switzerland and Australia.

Emirates GBR also had a rocky practice day despite coming to Cadiz from back-to-back wins in Saint-Tropez and Taranto, finishing the day in 6th. The surprise of the day was the solid performance of Erik Heil’s young German team, which finished in 5th overall. Home favourites Spain meanwhile picked up one race win and finished the day in 4th.

The Spain Sail Grand Prix | Andalucía-Cádiz takes place on October 14-15, with racing scheduled between 15:30-17:00 CEST.

Published in SailGP
Tagged under

Emirates GBR has secured its second consecutive event win in the three-boat Final in Taranto at the Italian SailGP regatta.

However, the race was terminated due to light winds, resulting in the top three teams, namely Australia, the United States, and Emirates GBR, failing to reach the third gate within the 16-minute race time limit. As a result, the top team from the fifth fleet race, Emirates GBR, clinched the overall event win, while Australia and the United States finished second and third, respectively.

Emirates GBR was the highest-performing team throughout the weekend, finishing never below third throughout all five fleet races. Ben Ainslie, the driver of the winning team, praised his squad's commendable efforts throughout the competition, saying, "The team did a great job all weekend - certainly we were lucky in that last race." He also lauded his team's consistency throughout the event.

Although Race Day 2 was entirely different from the high-octane racing of Taranto's opening day, Emirates GBR repeated their impressive opening day performance, securing a race win and a second-place finish in the final two fleet races. Meanwhile, the United States team, led by Jimmy Spithill, made a commendable comeback after an athlete's injury on day one, securing a third and first-place finish in fleet racing.

France was set to take the third place in the Final, but Canada pipped Quentin Delapierre's team to the finish line in Fleet Race 5, resulting in the United States taking the third position instead. Despite being unable to complete the Final, Spithill's team finished third overall, the team's best result since Sydney in Season 3.

Spain also proved itself as a light wind specialist, making a comeback from its 8-8-7 record on Race Day 1, securing a second and third-place finish in the last two fleet races.

SailGP fans can witness the F50 fleet in action at the Spain Sail Grand Prix | Andalucía Cádiz, scheduled on October 14-15.

Published in SailGP
Tagged under
Page 1 of 5

General Information on using Waterways Ireland inland navigations

Safety on the Water

All users of the navigations are strongly recommended to make themselves aware of safety on the water for whatever activity they are involved in and to read the advice offered by the various governing bodies and by:

The Dept. of Transport, Ireland: www.gov.ie/transport and The Maritime and Coastguard Agency, UK, The RNLI – Water Safety Ireland for information in terms of drowning prevention and water safety.

Registration of Vessels

All vessels using the Shannon Navigation, which includes the Shannon-Erne Waterways and the Erne System must be registered with Waterways Ireland. Only open undecked boats with an engine of 15 horsepower or less on the Shannon Navigation, and vessels of 10 horsepower or less on the Erne System, are exempt. Registration is free of charge.

Craft registration should be completed online at: https://www.waterwaysireland.org/online-services/craft-registration

Permits for use of the Grand and Royal Canals and the Barrow Navigation

All vessels using the Grand and Royal Canals and the Barrow Navigation must display appropriate valid Permit(s) i.e A Combined Mooring and Passage Permit (€126) and if not intending to move every five days, an Extended Mooring Permit (€152).

Permit applications should be completed online at: https://www.waterwaysireland.org/online-services/canal-permits

Passage on the Royal and Grand Canals – Dublin Area

For boat passage through the locks east of Lock 12 into / out of Dublin on either the Royal or Grand Canals, Masters are requested to contact the Waterways Ireland Eastern Regional Office (M-F 9.30am-4.30pm) on tel: +353(0)1 868 0148 or email [email protected] prior to making passage in order to plan the necessary lock-keeping assistance arrangements.

On the Grand Canal a minimum of two days notice prior to the planned passage should be given, masters should note that with the exception of pre-arranged events, a maximum of 2 boats per day will be taken through the locks, travelling either east or west.

Movements in or out of the city will be organised by prior arrangement to take place as a single movement in one day. Boaters will be facilitated to travel the system if their passage is considered to be safe by Waterways Ireland and they have the valid permit(s) for mooring and passage.

Newcomen Lifting Bridge

On the Royal Canal two weeks’ notice of bridge passage (Newcomen Lifting Bridge) is required for the pre-set lift date, and lock assistance will then also be arranged. A minimum of 2 boats is required for a bridge lift to go ahead.

Waterways Ireland Eastern Regional Office (Tel: +353(0)1 868 0148 or [email protected] ) is the point of contact for the bridge lift.

A maximum number of boats passing will be implemented to keep to the times given above for the planned lifts (16 for the Sat / Sun lifts & 8 for the weekday lifts). Priority will be given on a first come first served basis.

On day of lift, boaters and passengers must follow guidance from Waterways Ireland staff about sequence of passage under bridge & through Lock 1, and must remain within signed and designated areas.

Events Held on the Waterways

All organised events taking place on the waterways must have the prior approval of Waterways Ireland. This is a twelve week process and application forms must be accompanied with the appropriate insurance, signed indemnity and risk assessment. The application should be completed on the Waterways Ireland events page at :

https://www.waterwaysireland.org/online-services/event-approval

Time Limits on Mooring in Public Harbours

On the Shannon Navigation and the Shannon-Erne Waterway craft may berth in public harbours for five consecutive days or a total of seven days in any one month.

On the Erne System, revised Bye Laws state that: No master or owner shall permit a vessel, boat or any floating or sunken object to remain moored at or in the vicinity of any public mooring, including mooring at any other public mooring within 3 kilometres of that location, for more than 3 consecutive days and shall not moor at that same mooring or any other public mooring within 3 kilometres of that location within the following 3 consecutive days without prior permission by an authorised official.

Winter Mooring on the Shannon Navigation and Shannon Erne Waterway

Winter mooring may be availed of by owners during the period 1 Nov to 31 Mar by prior arrangement and payment of a charge of €63.50 per craft. Craft not availing of Winter Mooring must continue to comply with the “5 Day Rule”. Winter Mooring applications should be completed online at : https://www.waterwaysireland.org/online-services/winter-moorings-booking

Owners should be aware that electricity supply and water supply to public moorings is disconnected for the winter months. This is to protect against frost damage, to reduce running costs and to minimise maintenance requirements during the winter months.

Vessel owners are advised that advance purchasing of electricity on the power bollards leading up to the disconnection date should be minimal. Electricity credit existing on the bollards will not be recoverable after the winter decommissioning date. Both services will be reinstated prior to the commencement of the next boating season.

Smart Cards

Waterways Ireland smart cards are used to operate locks on the Shannon Erne Waterway, to access the service blocks, to use the pump-outs along the navigations, to avail of electrical power at Waterways Ireland jetties.

Berthing in Public Harbours

Masters are reminded of the following:

  • Equip their vessel with mooring lines of appropriate length and strength and only secure their craft to mooring bollards and cleats provided for this purpose.
  • Ensure the available berth is suitable to the length of your vessel, do not overhang the mooring especially on finger moorings on floating pontoon moorings.
  • Ensure mooring lines, electric cables and fresh water hoses do not create a trip hazard on public jetties for others users.
  • Carry sufficient fenders to prevent damage to your own vessel, other vessels and WI property.
  • Allow sufficient space between your vessel and the vessel ahead /astern (c.1m) for fire safety purposes and /or to recover somebody from the water.
  • Do not berth more than two vessels side by side and ensure there is safe access/egress at all times between vessels and onto the harbour itself.
  • Do not berth in such a way to prevent use of harbour safety ladders, slipways or pump-outs.
  • Do not allow the bow of your vessel to overhang the walkway of a floating mooring thus creating a hazard for others with an overhanging anchor or bow fendering.
  • Animals are not allowed to be loose or stray at any time.
  • Harbour and jetty infrastructure such as railings, power pedestals, fresh water taps, electric light poles, safety bollards, ladders etc are not designed for the purpose of mooring craft , they will not bear the strain of a vessel and will be damaged.
  • At Carrybridge on the Erne System, Masters of vessels are not permitted to use stern on mooring. Masters of vessels must use the mooring fingers for mooring of vessels and for embarkation / disembarkation from vessels.

Passenger Vessel Berths

Masters of vessels should not berth on passenger vessel berths where it is indicated that an arrival is imminent. Passenger vessels plying the navigations generally only occupy the berths to embark and disembark passengers and rarely remain on the berths for extended periods or overnight.

Lock Lead-in Jetties

Lead-in jetties adjacent to the upstream and downstream gates at lock chambers are solely for the purpose of craft waiting to use the lock and should not be used for long term berthing.

Vessel Wake

Vessel wake, that is, the wave generated by the passage of the boat through the water, can sometimes be large, powerful and destructive depending on the hull shape and engine power of the vessel. This wake can be detrimental to other users of the navigation when it strikes their craft or inundates the shoreline or riverbank. Masters are requested to frequently look behind and check the effect of their wake / wash particularly when passing moored vessels, on entering harbours and approaching jetties and to be aware of people pursuing other activities such as fishing on the riverbank.

Speed Restriction

A vessel or boat shall not be navigated on the Shannon Navigation at a speed in excess of 5 kph when within 200 metres of a bridge, quay, jetty or wharf, when in a harbour or canal or when passing within 100 metres of a moored vessel or boat.

Vessels navigating the Shannon-Erne Waterway should observe the general 5 kph speed limit which applies along the waterway. This is necessary in order to prevent damage to the banks caused by excessive wash from vessels.

Vessels navigating the Erne System should observe the statutory 5kt / 6mph / 10kph speed limit areas.

A craft on the Royal and Grand canals shall not be navigated at a speed in excess of 6km per hour.

A craft on the Barrow Navigation shall not be navigated at a speed in excess of 11km per hour except as necessary for safe navigation in conditions of fast flow.

Bank Erosion

Narrow sections of all the navigations are particularly prone to bank erosion due to the large wash generated by some craft. Masters are requested to be vigilant and to slow down to a speed sufficient to maintain steerage when they observe the wash of their craft inundating the river banks.

Unusual Waterborne Activity

Unusual waterborne vessels may be encountered from time to time, such as, hovercraft or amphibious aircraft / seaplanes. Masters of such craft are reminded to apply the normal “Rule of the Road” when they meet conventional craft on the water and to allow extra room to manoeuvre in the interest of safety.

Sailing Activity

Mariners will encounter large numbers of sailing dinghies from late June to August in the vicinity of Lough Derg, Lough Ree and Lower Lough Erne. Sailing courses are marked by yellow buoys to suit weather conditions on the day. Vessels should proceed at slow speed and with due caution and observe the rules of navigation when passing these fleets, as many of the participants are junior sailors under training.

Rowing

Mariners should expect to meet canoes and vessels under oars on any part of the navigations, but more so in the vicinity of Athlone, Carrick-on-Shannon, Coleraine, Enniskillen and Limerick. Masters are reminded to proceed at slow speed and especially to reduce their wash to a minimum when passing these craft as they can be easily upset and swamped due to their very low freeboard and always be prepared to give way in any given traffic situation.

Canoeing

Canoeing is an adventure sport and participants are strongly recommended to seek the advice of the sport’s governing bodies i.e Canoeing Ireland and the Canoe Association of Northern Ireland, before venturing onto the navigations.

Persons in charge of canoes are reminded of the inherent danger to these craft associated with operating close to weirs, sluice gates, locks and other infrastructure particularly when rivers are in flood and large volumes of water are moving through the navigations due to general flood conditions or very heavy localised precipitation e.g. turbulent and broken water, stopper waves. Shooting weirs is prohibited without prior permission of Waterways Ireland.

Canoeists should check with lockkeepers prior entering a lock to ensure passage is done in a safe manner. Portage is required at all unmanned locks.

Canoe Trail Network – "Blueways"

Masters of powered craft are reminded that a canoe trail network is being developed across all navigations and to expect more organised canoeing along these trails necessitating slow speed and minimum wash when encountering canoeists, rowing boats etc

Rockingham and Drummans Island Canals – Lough Key

It is expected that work on Rockingham and Drummans Island Canals on Lough Key will be completed in 2021. Access to these canals will be for non-powered craft only, eg canoes, kayaks, rowing boats.

Fast Powerboats and Personal Watercraft (Jet Skis)

Masters of Fast Powerboats (speed greater than 17kts) and Personal Watercraft (i.e.Jet Skis) are reminded of the inherent dangers associated with high speed on the water and especially in the confines of small bays and narrow sections of the navigations. Keeping a proper look-out, making early alterations to course and /or reducing speed will avoid conflict with slower vessels using the navigation. Personal Watercraft are not permitted to be used on the canals.

Towing Waterskiers, Wakeboarders, Doughnuts etc

Masters of vessels engaged in any of these activities are reminded of the manoeuvring constraints imposed upon their vessel by the tow and of the added responsibilities that they have to the person(s) being towed. These activities should be conducted in areas which are clear of conflicting traffic. It is highly recommended that a person additional to the master be carried to act as a “look-out” to keep the tow under observation at all times.

Prohibition on Swimming

Swimming in the navigable channel, particularly at bridges, is dangerous and is prohibited due to the risk of being run over by a vessel underway in the navigation.

Age Restrictions on operating of powered craft

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the minimum age for operating of powered craft. The Statutory Instrument contains the following requirements:

- The master or owner of a personal watercraft or a fast power craft shall take all reasonable steps to ensure that a person who has not attained the age of 16 years does not operate or control the craft

- The master or owner of a pleasure craft powered by an engine with a rating of more than 5 horse power or 3.7 kilowatts shall take all reasonable steps to ensure that a person who has not attained the age of 12 years does not operate or control the craft.

Lifejackets and Personal Flotation Devices (PFDs)

Lifejackets and PFD’s are the single most important items of personal protective equipment to be used on a vessel and should be worn especially when the vessel is being manoeuvred such as entering / departing a lock, anchoring, coming alongside or departing a jetty or quayside.

In the Republic of Ireland, Statutory Instrument 921 of 2005 provides the legal requirements regarding the wearing of Personal Flotation Devices. The Statutory Instrument contains the following requirements:

- The master or owner of a pleasure craft (other than a personal watercraft) shall ensure, that there are, at all times on board the craft, sufficient suitable personal flotation devices for each person on board.

- A person on a pleasure craft (other than a personal watercraft) of less than 7 metres length overall shall wear a suitable personal flotation device while on board an open craft or while on the deck of decked craft, other than when the craft is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person who has not attained the age of 16 years complies with paragraph above.

- The master or owner of a pleasure craft (other than a personal watercraft), shall take all reasonable steps to ensure that a person who has not attained the age of 16 years wears a suitable personal flotation device while on board an open craft or while on the deck of a decked craft other than when it is made fast to the shore or at anchor.

- The master or owner of a pleasure craft (other than a personal watercraft) shall take all reasonable steps to ensure that a person wears a suitable personal flotation device, at all times while – (a) being towed by the craft, (b) on board a vessel or object of any kind which is being towed by the craft.

Further information is available at: http://www.irishstatutebook.ie/eli/2005/si/921/made/en/print

Firing Range Danger Area – Lough Ree

The attention of mariners is drawn to the Irish Defence Forces Firing Range situated in the vicinity of buoys No’s 2 and 3, on Lough Ree on the Shannon Navigation. This range is used regularly for live firing exercises, throughout the year, all boats and vessels should stay clear of the area marked with yellow buoys showing a yellow "X" topmark and displaying the word "Danger".

Shannon Navigation, Portumna Swing Bridge Tolls

No attempt should be made by Masters’ of vessels to pay the bridge toll while making way through the bridge opening. Payment will only be taken by the Collector from Masters when they are secured alongside the jetties north and south of the bridge.

Navigating from Killaloe to Limerick on the Shannon Navigation

The navigation from Killaloe to Limerick involves passage through Ardnacrusha locks, the associated headrace and tailrace and the Abbey River into Limerick City. Careful passage planning is required to undertake this voyage. Considerations include: lock passage at Ardnacrusha, water flow in the navigation, airdraft under bridges on Abbey River in Limerick, state of tide in Limerick

Users are advised to contact the ESB Ardnacrusha hydroelectric power station (00353 (0)87 9970131) 48 hours in advance of commencing their journey to book passage through the locks at Ardnacrusha. It is NOT advised to undertake a voyage if more than one turbine is operating (20MW), due to the increased velocity of flow in the navigation channel, which can be dangerous. To ascertain automatically in real time how many turbines are running, users can phone +353 (0)87 6477229.

For safety reasons the ESB has advised that only powered craft with a capacity in excess of 5 knots are allowed to enter Ardnacrusha Headrace and Tailrace Canals.

Passage through Sarsfield Lock should be booked on +353-87-7972998, on the day prior to travel and it should be noted also that transit is not possible two hours either side of low water.

A Hydrographic survey in 2020 of the navigation channel revealed that the approach from Shannon Bridge to Sarsfield Lock and the Dock area has silted up. Masters of vessels and water users are advised to navigate to the Lock from Shannon bridge on a rising tide one or two hours before High Tide.

Lower Bann Navigation

The attention of all users is drawn to the “Users Code for the Lower Bann”, in particular to that section covering “Flow in the River” outlining the dangers for users both on the banks and in the navigation, associated with high flow rates when the river is in spate. Canoeists should consult and carry a copy of the “Lower Bann Canoe Trail” guide issued by the Canoe Association of Northern Ireland. Users should also contact the DfI Rivers Coleraine, who is responsible for regulating the flow rates on the river, for advisory information on the flow rates to be expected on any given day.

DfI Rivers Coleraine. Tel: 0044 28 7034 2357 Email: [email protected]

Lower Bann Navigation – Newferry – No wake zone

A No Wake Zone exists on the Lower Bann Navigation at Newferry. Masters of vessels are requested to proceed at a slow speed and create no wake while passing the jetties and slipways at Newferry.

Overhead Power Lines (OHPL) and Air draft

All Masters must be aware of the dangers associated with overhead power lines, in particular sailing vessels and workboats with cranes or large air drafts. Voyage planning is a necessity in order to identify the location of overhead lines crossing the navigation.

Overhead power line heights on the River Shannon are maintained at 12.6metres (40 feet) from Normal Summer level for that section of navigation, masters of vessels with a large air draft should proceed with caution and make additional allowances when water levels are high.

If a vessel or its equipment comes into contact with an OHPL the operator should NOT attempt to move the vessel or equipment. The conductor may still be alive or re-energise automatically. Maintain a safe distance and prevent third parties from approaching due to risk of arcing. Contact the emergency services for assistance.

Anglers are also reminded that a minimum ground distance of 30 metres should be maintained from overhead power lines when using a rod and line.

Submarine Cables and Pipes

Masters of vessels are reminded not to anchor their vessels in the vicinity of submarine cables or pipes in case they foul their anchor or damage the cables or pipes. Look to the river banks for signage indicating their presence.

Water Levels - Precautions

Low Water Levels:

When water levels fall below normal summer levels masters should be aware of:

Navigation

To reduce the risk of grounding masters should navigate on or near the centreline of the channel, avoid short cutting in dog-legged channels and navigating too close to navigation markers.

Proceeding at a slow speed will also reduce “squat” effect i.e. where the vessel tends to sit lower in the water as a consequence of higher speed.

Slipways

Reduced slipway length available under the water surface and the possibility of launching trailers dropping off the end of the concrete apron.

More slipway surface susceptible to weed growth requiring care while engaged in launching boats, from slipping and sliding on the slope. Note also that launching vehicles may not be able to get sufficient traction on the slipway once the craft is launched to get up the incline.

Bank Erosion

Very dry riverbanks are more susceptible to erosion from vessel wash.

Lock Share

Maximising on the number of vessels in a lock will ensure that the total volume of water moving downstream is decreased. Lock cycles should be used for vessels travelling each way.

High Water Levels:

When water levels rise above normal summer level masters should be aware of:

Navigation

Navigation marks will have reduced height above the water level or may disappear underwater altogether making the navigable channel difficult to discern.

In narrow sections of the navigations water levels will tend to rise more quickly than in main streams and air draft at bridges will likewise be reduced.

There will also be increased flow rates particularly in the vicinity of navigation infrastructure such as bridges, weirs, locks etc where extra care in manoeuvring vessels will be required.

Harbours and Jetties

Due care is required in harbours and at slipways when levels are at or near the same level as the harbour walkways' as the edge will be difficult to discern especially in reduced light conditions. It is advised that Personal Flotation Devices be worn if tending to craft in a harbour in these conditions.

Slipways

Slipways should only be used for the purpose of launching and recovering of water craft or other objects from the water. Before using a slipway it should be examined to ensure that the surface has sufficient traction/grip for the intended purpose such as launching a craft from a trailer using a vehicle, that there is sufficient depth of water on the slipway to float the craft off the trailer before the concrete apron ends and that the wheels of the trailer do not drop off the edge of the slipway. That life-saving appliances are available in the vicinity, that the vehicle is roadworthy and capable of coping with the weight of the trailer and boat on the incline. It is recommended that slipway operations are conducted by two persons.

Caution to be Used in Reliance upon Aids to Navigation

The aids to navigation depicted on the navigation guides comprise a system of fixed and floating aids to navigation. Prudent mariners will not rely solely on any single aid to navigation, particularly a floating aid to navigation. With respect to buoys, the buoy symbol is used to indicate the approximate position of the buoy body and the ground tackle which secures it to the lake or river bed. The approximate position is used because of the practical limitations in positioning and maintaining buoys in precise geographical locations. These limitations include, but are not limited to, prevailing atmospheric and lake/river conditions, the slope of and the material making up the lake/river bed, the fact that the buoys are moored to varying lengths of chain, and the fact that the buoy body and/or ground tackle positions are not under continuous surveillance. Due to the forces of nature, the position of the buoy body can be expected to shift inside and outside the charted symbol.

Buoys and perches are also moved out of position or pulled over by those mariners who use them to moor up to instead of anchoring. To this end, mariners should always monitor their passage by relating buoy/perch positions with the published navigation guide. Furthermore, a vessel attempting to pass close by always risks collision with a yawing buoy or with the obstruction that the buoy or beacon/perch marks.

Masters of Vessels are requested to use the most up to date Navigation guides when navigating on the Inland Waterways.

Information taken from Special Marine Notice No 1 of 2023